Hui Xiao

Hui Xiao

Auto-generated profile, based on publicly available information

Hui Xiao

School of Management Science and Engineering, Southwestern University of Finance and Economics, Chengdu, China

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 September 2021 in IEEE Transactions on Reliability
Verified
Journal Article
Closed access
HXHui Xiao
Hui Xiao
KYKunxiang Yi
Kunxiang Yi
Rui PengRui Peng
Rui Peng
Gang KouGang Kou
Gang Kou
Existing research has been concentrated on improving the reliability of a distributed computing system through optimizing tasks allocation, providing software redundancy and providing hardware redundancy. None of these works considered the performance sharing mechanism in a distributed computing system. Different from other performance sharing systems whose reliability can be calculated directly, the reliability evaluation of a distributed computing system with performance sharing is more challenging since the reliability depends on the task execution time of each processor after performance sharing. This research considers a distributed computing system with performance sharing mechanism such that the computing power can be redistributed among different processors in the system. A reliability model is proposed to evaluate the distributed computing system with performance sharing. An optimization model is formulated to derive the optimal performance sharing policy such that the system reliability can be maximized. Both analytic examples and numerical examples are carried out to illustrate the proposed model and algorithm.

9 January 2018 in IEEE Transactions on Automatic Control
Verified
Journal Article
Closed access
HXHui Xiao
Hui Xiao
Siyang GaoSiyang Gao
Siyang Gao
This technical note considers the problem of selecting the top-m designs using simulation with input uncertainty. The performance of each design is measured by its worst-case performance. The objective of this research is to maximize the probability of correctly selecting the top-m designs given a fixed simulation budget. Due to the complexity of probability of correct selection (PCS), we develop a lower bound for the PCS and derive an asymptotically optimal budget allocation rule. Useful insights on characterizing the efficient budget allocation rule with input uncertainty are provided. Meanwhile, a sequential simulation procedure is suggested to implement the allocation rule. A series of numerical experiments indicate that the proposed simulation budget allocation rule can outperform all existing selection rules.

16 July 2025 in IEEE Transactions on Reliability
Verified
Journal Article
Closed access
LTLongyan Tan
Longyan Tan
FWFanping Wei
Fanping Wei
XMXiaobing Ma
Xiaobing Ma
Rui PengRui Peng
Rui Peng
HXHui Xiao
Hui Xiao
Li YangLi Yang
Li Yang
Condition-based maintenance (CBM) powered by inspection/monitoring technology is crucial to guarantee safety and economical operations of various industrial assets. The implementation of prevailing CBM procedures for large-scale heterogeneous systems, however, is increasingly challenged by model intractability and computational cost stemming from the synergistic effect of information completeness and structure complexity. In this article, we innovatively devises a tractable CBM model for multicomponent continuously degrading systems under nonperfect inspection information, which is applicable to heterogeneous system structure and arbitrary hierarchical maintenance actions. The maintenance optimization problem of interest constitutes a continuous-state partially observable Markov-decision process applicable to heterogeneous system structures. A series of structure properties associated with systematic conditional reliability and accessibility of optimal solution are established, following which a multiagent reinforcement learning model governed by partial-independent parameter-sharing mechanism is employed to allow for solution search under continuous state–action space. A customized proximal policy algorithm is then leveraged to facilitate efficient agent training by diminishing the cure of dimension. Comparative experiments conducted on train wheel treads verify the superior model performance over cost control and computational efficiency improvement.

1 October 2019 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
KYKunxiang Yi
Kunxiang Yi
HXHui Xiao
Hui Xiao
GKGang Kou
Gang Kou
RPRui Peng
Rui Peng

18 June 2020 in Naval Research Logistics (NRL)
Verified
Journal Article
Closed access
PDF file
HXHui Xiao
Hui Xiao
KYKunxiang Yi
Kunxiang Yi
Gang KouGang Kou
Gang Kou
LXLiudong Xing
Liudong Xing

14 December 2021 in IEEE Transactions on Reliability
Verified
Journal Article
Open access
HXHui Xiao
Hui Xiao
YYYuanmin Yan
Yuanmin Yan
Gang KouGang Kou
Gang Kou
Shaomin WuShaomin Wu
Shaomin Wu
In many real production systems, a system may be stopped due to a lack of demand or exhaustion of raw materials. This is known as production wait and provides a good opportunity for maintenance. Meanwhile, the increased complexity of the modern machines brings new challenges for modeling and analyzing their failure behaviors. To address these real-world problems, this article considers a single-unit system that may fail due to either hard failures or soft failures. The wait time of a system is utilized to conduct inspections and maintenance. The system is replaced when a defect is found during an inspection, a failure occurred or a prespecified age threshold is reached, whichever comes first. The cost model, which is the long-run maintenance cost per unit of time, is derived. The optimal periodical inspection interval and the threshold age to minimize the long run maintenance cost per unit of time is then obtained. A case study is conducted to demonstrate the proposed maintenance model. The study shows using the proposed maintenance model can reduce the cost. Sensitivity analysis illustrates how each cost parameter affects the optimal inspection interval and the optimal age threshold.