12 March 2015 in IEEE Transactions on Smart Grid
In this paper, a new multiobjective joint energy and reserve market clearing model is presented, in which the payment cost minimization and the voltage stability maximization are considered as the economic and security objectives, respectively. In the proposed model, microgrid aggregators (MGAs) submit their bids as demands to participate in the day-ahead electricity market. Both pay-at-market clearing price (uniform pricing) and locational marginal price-based settlement mechanisms are employed to determine the payoffs of market participants in the proposed payment cost minimization model, and the outcomes are compared with those of the offer generation cost minimization model. It is shown that the proposed payment cost minimization model leads to a lower consumer payment cost than the offer cost minimization model. A new approach, which is referred to as bi-objective desired solution generator, is introduced to solve the proposed bi-objective problem. It is shown that the desired solution is determined without approximating all efficient solutions, which in turn results in lower processing time and computational burden. A modified IEEE 24-bus reliability test system is used as a test system to verify the effectiveness of the proposed approach.
6 June 2012 in IET Generation, Transmission & Distribution
One of the main issues in distribution sector is to achieve simultaneously high system reliability and low capital costs. Distribution automation systems (DASs) involve automatic and remote-controlled switches. The switches play a significant role in system reliability improvement. This paper proposes the modified shuffled frog leaping algorithm (SFLA) to derive the optimal placement of manual and automatic switches in DASs. A fuzzy approach is used to handle the multi objective considerations, and a fuzzy membership function is defined for each term in the objective function. The first objective is reliability improvement by minimising the customer interruption cost (CIC), and the second objective is to minimise switches purchasing and maintenance cost (SPMC). In this paper, a new method is developed to evaluate CIC and SPMC indices in a distribution network. In the proposed method, customer types, customers load patterns, monthly, daily and hourly customers loading rates are considered. In addition, network branches’ failure rate, restoration time and repair time are taken into account. The performance of the proposed approach is assessed and illustrated by studying on the IEEE 123-node feeder standard test system. The simulation results verify the capability of the proposed method.
30 March 2016 in IEEE Transactions on Smart Grid
The interdependence between the natural gas (NG) and electricity networks as two primary energy carriers has attracted significant attention in smart grids. In this paper, a multi-objective framework is proposed for the coordinated operation of NG and electricity networks, addressing the economic, dynamic security of electricity network, as well as the security of the NG network. The proposed electricity network includes thermal generation facilities such as NG-fired generation units as well as the microgrid aggregators as price responsive demands. The ε-constraint method is employed to solve the proposed multi-objective problem and the index of critical clearing time is employed to assess the dynamic stability of the electricity network. The effectiveness of the proposed framework is addressed in a case study integrating the Belgian gas network and modified IEEE 24-bus test system. The proposed coordinated operation of electricity and NG networks is benchmarked against the independent operation of individual networks.
1 June 2018 in International Journal of Electrical Power & Energy Systems
1 October 2021 in Journal of Cleaner Production
21 February 2018 in IET Generation, Transmission & Distribution
In this paper, a bi‐objective robust model is proposed for network expansion planning (NEP) considering the integration of the microgrid aggregators. The objectives include minimization of both the expansion cost and transmission lines loading index. Forced outages of system components are taken into account as the system uncertainties. A hybrid method as the combination of gravitational search algorithm (GSA) and primal‐dual interior point (PDIP) method is employed to solve the nonlinear programming (NLP) problem of the NEP. In the proposed hybrid method, the operation sub‐problems are solved by the PDIP method under the worst‐case single component contingencies, while the expansion plan is defined as scenario independent variables obtained by the GSA algorithm. To detect the worst‐case single component contingencies with the severest effects on the system security, a subsidiary optimization problem is solved for each load level of the system. A realistic network of Qom as a part of Tehran Regional Electric Company, Iran, as well as IEEE 118‐bus test system are analysed to evaluate the efficiency of the proposed method. A key conclusion is that the stochastic model may not provide sufficient security level, and a robust model is required to ensure the system security against the severe contingencies.