1 November 2018 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Across the United States, increased development has led to an increase in construction defect litigation, particularly for multifamily for-sale projects. This research consists of a survey of recent construction defect cases. Cases were analyzed for reoccurring defects to identify what defect items are commonly cited to help owners, architects, engineers, and contractors manage risk. The construction projects reviewed are located largely in the Denver metro area with additional projects in Wyoming, Texas, and Nevada. The data set includes 41 construction defect cases litigated during 2015, 2016, and 2017. During analysis of such cases, cited defects were categorized as one of 55 issues. A significant finding is identifying the 10 most commonly cited construction defects and observing that they each occur in over half of all litigation cases analyzed. Another important finding is that the commonly cited defects generally relate to keeping water out of or flowing away from the building. The contribution of this research is to provide information that will help to reduce future construction defect litigation by identifying reoccurring defects that can be addressed during design and construction on future projects.
1 February 2022 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Owners that solicit proposals for lump-sum design-build transportation projects must provide a minimum level of design and other pertinent information to prospective design-builders in the procurement stages. Existing research on this topic relies heavily on a percent complete designation and demonstrates a lack of industry standards. This research presents owners’ current practices related to the recommended level of design, as well as additional information provided in design-build proposal requests. This research examines publicly available information from 22 state transportation agencies (STAs) to identify owner-provided design level at the procurement stage of design-build projects. Additionally, 17 STAs are further analyzed for additional related information provided to the design-builder during the procurement phase. The main findings include that 86% of STAs recommended owners provide prospective design-builders with 30% or below design levels at the procurement stage; and 88% of STAs provided environmental studies, geotechnical studies, right-of-way information, and existing utilities information as a part of request for proposals. The study findings will assist STAs in quantifying the level of design, as well as other information recommended for inclusion in proposal requests, so that design-builders can complete projects successfully.
1 May 2023 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
One of the unique aspects of the design-build contracting method is that the owner provides a partially completed design for prospective design-builder teams to interpret for complete design and construction of the project. The data provided by the owner include studies, reports, as-built plans, design data, and other documents. The level of design development varies across projects and state transportation departments. Existing research on this topic relies heavily on varying design completion levels, which can be projected as completion percentages, but fails to establish an industry standard of how to recognize the design level, or percent complete, of a project in advance of the 100% design. There is a gap in the research that requires examination of case studies and identification of the data provided by the owner at the corresponding levels of design. This research examines data provided by the owner, state department of transportation agencies, on large design-build transportation projects from six case studies. The first research outcome compares actual documents provided by the DOT at the request for proposal stage of bidding with what their design-build manuals recommend being provided by the DOT. The second research outcome identifies seven additional categories, specific to the DOT-provided design documents, and examines the similarities and differences in drawing files in the six case studies. The final outcome is to provide DOTs with a comprehensive list that gives them the ability to provide sufficient and adequate information to the prospective bidders on design-build projects in an effort to mitigate future disputes.