In order to enable further overhang of the flotation tailing dump and its exploitation in the safe and stable conditions up to the designed elevation of K+545 m altitude, since the stability coefficients in a part of the tailing dump next to PS Kaludjerica are below the minimum due to a wide seepage front through the outer slope of the embankment, its rapid rehabilitation is necessary. In this paper, the problems affecting the rehabilitation and further overhang of the tailing dump are present.
1 January 2025 in Mining and Metallurgy Engineering Bor
Renewable energy sources have a significant potential for improving the development of mankind. Energy obtained from the renewable sources, such as water, wind, solar and biomass, among others, can facilitate access to clean and safe energy for millions of people. It can provide an incentive for the social and economic development, contributing to the society tackling the environmental challenges. The clean energy technologies, impact of renewable sources on the environment and energy security should enable the general access to the modern energy services, increase the global rate of energy efficiency improvement, and increase the share of energy from the renewable sources within the global energy system. This achieves an integrated approach to the sustainable energy services, ensures the use of renewable energy sources and thus achieves more energy efficient solutions. The renewable energy technologies provide a unique opportunity to limit the carbon emissions into the atmosphere without compromising access to the energy, which has the significant implications for slowing down the climate changes. Also, development the renewable energy sources creates access to energy that is inexhaustible, thereby reducing a country's reliance on foreign resources and increasing its energy security. In addition, the renewable energy sources bring the great health benefits, providing the clean, safe energy, without the negative effects of using the fossil fuels.
1 January 2024 in Mining and Metallurgy Engineering Bor
By analyzing the world's best practices, the mining waste dumps can be turned into suitable land for location the renewable and clean energy power plants. There are several advantages that characterize these locations: they are characterized by the environmental conditions that are not acceptable for commercial or residential development. Generally, they are located near the existing roads and energy transmission or distribution infrastructure. They can be adequately zoned for renewable energy sources, provide the opportunity for employment in the urban communities and to promote cleaner and more cost-effective energy technologies, reduce the impact of energy systems on the environment (e.g. reduce the emission of harmful gases). As the solar power plants are usually built on large areas, which can lead to the changes in geological and geotechnical conditions along the project site, it is extremely important to design the appropriate geotechnical investigations to reduce or limit the geological uncertainty and determine the suitability of site for construction. In these cases, the geotechnical studies are very complex, striving for a multidisciplinary approach in analyzing the site in question for construction a solar power plant, respecting the current legislation , regulations, norms and standards.
1 January 2024 in Mining and Metallurgy Engineering Bor
Soil stabilization represents process for improvements physical-mechanical and deformation feature of soil, adding binders. There are two basic kinds of stabilization: mechanical and chemical. Chemical stabilization of soil refers on addition binders to basic material of soil. The most common materials in chemical stabilization soil are lime and cement. In this work will to be shown the results stabilization soil with lime, for access roads on territory of the city of Bor.
1 January 2023 in Mining and Metallurgy Engineering Bor
After conducting the geotechnical and hydrogeological explorations of the RTH flotation tailing dump and determining the stability of slopes for the overhanging purposes, the zone with the observed instability, an elevated and unfavorable gradient of the groundwater level, was determined and located. Due to these reasons, further design of the groundwater level regulation system was started. The hydrodynamic analysis of the task determined that in order to achieve the effects of lowering and regulating the level of underground water, it is necessary to construct fourteen wells.
Geotechnical and hydrogeological investigations were carried out at the location on the sector 6 of the "Valja Fundata" flotation tailing dump in Majdanpek. The goal of investigations was to define the geotechnical and hydrogeological structure of this part of the tailings dump, as a basis for determining the optimal conditions for overhanging and rehabilitation of the terrain, planned for the landfill expansion. The appropriate geotechnical and hydrogeological terrain models, which will be used as a starting point for further construction and mining design, were developed applying the multidisciplinary geological investigation models.