Jennifer S. Shane

Jennifer S. Shane

Auto-generated profile, based on publicly available information

Jennifer S. Shane

Iowa State Univ

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2009 in Journal of Management in Engineering
Verified
Journal Article
Closed access
JSJennifer S. Shane
Jennifer S. Shane
KMKeith R. Molenaar
Keith R. Molenaar
SAStuart Anderson
Stuart Anderson
CSCliff Schexnayder
Cliff Schexnayder
Construction projects, private and public alike, have a long history of cost escalation. Transportation projects, which typically have long lead times between planning and construction, are historically underestimated, as shown through a review of the cost growth experienced with the Holland Tunnel. Approximately 50% of the active large transportation projects in the United States have overrun their initial budgets. A large number of studies and research projects have identified individual factors that lead to increased project cost. Although the factors identified can influence privately funded projects the effects are particularly detrimental to publicly funded projects. The public funds available for a pool of projects are limited and there is a backlog of critical infrastructure needs. Therefore, if any project exceeds its budget other projects are dropped from the program or the scope is reduced to provide the funds necessary to cover the cost growth. Such actions exacerbate the deterioration of a st...

1 May 2017 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
BDBac Dao
Bac Dao
Sharareh (Sherri) KermanshachiSharareh (Sherri) Kermanshachi
Sharareh (Sherri) Kermanshachi
JSJennifer Shane
Jennifer Shane
SAStuart Anderson
Stuart Anderson
EHEric Hare
Eric Hare
The term project complexity is not well understood in the construction industry by either scholars or practitioners. Project complexity, however, is a critical factor in project management that presents additional challenges to achieving project objectives. Therefore, it is essential that everyone involved in project management thoroughly understand what project complexity is and how to identify, measure, and manage the various attributes and indicators it comprises. This study provided a constructive approach to identify and assess project complexity. As part of the study, a working definition of project complexity was developed by the research team, and project complexity was described in terms of project management rather than project physical features. In addition, the research team identified complexity attributes and developed the indicators that measure those attributes. Project specific data were collected through a survey of companies active in the construction industry. These data were s...

1 October 2013 in Journal of Management in Engineering
Verified
Journal Article
Closed access
DGDouglas D. Gransberg
Douglas D. Gransberg
JSJennifer S. Shane
Jennifer S. Shane
KSKelly Strong
Kelly Strong
CPCarla Lopez del Puerto
Carla Lopez del Puerto
Traditional three-dimensional project management theory is based on optimizing the cost-schedule-technical dimensions. Recent studies in the United Kingdom, Canada, and Australia have shown that the current project management body of knowledge may not be adequate to address interrelated and dependent variables encountered on complex projects. This paper reports the findings of an international research team’s detailed study of 18 complex projects, which confirms the findings of the previous research and proposes a framework upon which a complex transportation project’s scope of work can be better conceptualized and a methodology to graphically display a project’s complexity in order to better understand and prioritize the available resources. The result is a “complexity footprint” that helps the complex transportation project manager identify the sources of complexity so that appropriate resources can be allocated to address those factors before they create a crisis.

1 January 2008 in Journal of Management in Engineering
Verified
Journal Article
Closed access
CPCarla Lopez del Puerto
Carla Lopez del Puerto
DGDouglas D. Gransberg
Douglas D. Gransberg
JSJennifer S. Shane
Jennifer S. Shane
This paper reports the results of a study that compared what owners believe is important to achieve their project goals using design/build project delivery to what they make important in their design/build proposal evaluation plans. It also explores industry attitudes and compares those with owner attitudes regarding design/build project success. The conclusions are based on the analysis of 221 survey responses from 37 states compared to the results of a previous content analysis by Barton on 110 design/build requests for proposals. It was also able to confirm its findings with a 1997 owner design/build attitudes study by Songer and Molenaar finding that the main reason owners select design/build project delivery is to compress the project’s schedule. The research concluded that although owners believe that design/build team qualifications are the most important to project success, they give price the heaviest weight in design/build proposal evaluation plans. This effectively forces design/build teams to ...

1 July 2013 in Journal of Management in Engineering
Verified
Journal Article
Closed access
JSJennifer S. Shane
Jennifer S. Shane
SBSusan M. Bogus
Susan M. Bogus
KMKeith R. Molenaar
Keith R. Molenaar
Owners of water/wastewater facilities can choose from several project delivery methods, including the traditional design-bid-build method or an alternative design-build method. When choosing a project delivery method, the owner should consider both the project goals as well as the performance of different project delivery methods. Detailed data on project delivery performance allow owners to match project goals, such as time savings, with project delivery methods. Detailed data on project delivery performance do not currently exist for the water/wastewater sector. Through a survey of water/wastewater facility owners, data were collected on 31 design-build projects and sixty-nine design-bid-build projects. A statistical analysis of the data determined that schedule growth for design-build projects was half that of design-bid-build projects; more design-build projects finished at or below budget; and both project delivery methods produced projects of comparable quality. Although this is the first st...

1 September 2020 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
JCJin Ouk Choi
Jin Ouk Choi
BSBinit K. Shrestha
Binit K. Shrestha
YKYoung Hoon KWAK
Young Hoon KWAK
JSJennifer S. Shane
Jennifer S. Shane
Recently, the emergence of new technologies has renewed interest in modularization and facility design standardization. However, the application of both facility design standardization and modularization is still limited in capital projects, especially in upstream, midstream, and mining (UMM) sector projects such as natural gas processing and compressor station projects or well sites projects. The purpose of this study is to identify innovative technologies and management approaches (ITAs) that support achieving higher levels of facility design standardization and modularization in capital projects. Specifically, the authors analyzed the impact and likelihood of occurrence of these ITAs within the next 5 years. The analysis results show that ITAs such as modularization and standardization, lidar, stakeholder engagement and alignment, and discipline to maintain standardization have high impacts and high likelihoods of occurrence in the next 5 years. Other results explore a cooperative culture to support standardization and industrial robots to be ITAs, with significant statistical differences, which elucidate differences in opinions between owners and contractors. The authors also conducted a case study analysis to benchmark real-life standardized projects and derive lessons learned from such projects pertinent to ITAs. This study will help industry practitioners identify ITAs for better project planning, management, and execution of standardized projects as well as serve as the foundation for future studies on the planning and management of ITAs. Furthermore, this study will help capital projects to achieve higher levels of facility design standardization and modularization with greater predictability, agility, and improved cost-effectiveness.