Susan M. Bogus

Susan M. Bogus

Auto-generated profile, based on publicly available information

Susan M. Bogus

University of New Mexico

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2014 in Accident Analysis & Prevention
Verified
Journal Article
Closed access
QWQiong Wu
Qiong Wu
Feng ChenFeng Chen
Feng Chen
GZGuohui Zhang
Guohui Zhang
XLXiaoyue Cathy Liu
Xiaoyue Cathy Liu
Hua WangHua Wang
Hua Wang
SBSusan M. Bogus
Susan M. Bogus

1 November 2005 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
SBSusan M. Bogus
Susan M. Bogus
KMKeith R. Molenaar
Keith R. Molenaar
JDJames E. Diekmann
James E. Diekmann
A common method used to reduce project delivery time is to overlap sequential activities. Evolution and sensitivity characterizations of design activities provide a practical tool for identifying overlapping opportunities. The faster the evolution of information in an activity, the less risky it is to begin a downstream activity before the upstream activity is finalized. Also, the lower the sensitivity to changes in upstream information, the less risky it is to overlap activities. A methodology for determining the evolution and sensitivity of design activities has been developed through a series of expert interviews. The evolution of an activity can be determined by evaluating the levels of design optimization, constraint satisfaction, external information exchange, and standardization. The sensitivity of an activity can be determined by evaluating activity constraints, input variables, and the level of design integration. This framework for characterizing design activities in terms of evolution and sensitivity will lead to significant reductions in project delivery times.

1 February 2019 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
AJAmirhossein Jafari
Amirhossein Jafari
VVVanessa Valentin
Vanessa Valentin
SBSusan M. Bogus
Susan M. Bogus
Building energy retrofits aim to reduce the energy consumption of existing facilities. The most significant impact of any energy retrofit project is during the operation phase of a building, when a building’s users are directly impacted. This study focuses on the building operation phase by evaluating the social dimension of sustainability in energy retrofit projects. This study aimed to identify, categorize, and organize the social sustainability criteria of energy retrofit projects in existing buildings. A three-stage methodology was used that selected qualified experts in the targeted population, employed a Delphi technique to identify criteria for measuring social sustainability in energy retrofit projects, and used concept mapping to organize the identified social criteria. The study identified 19 social sustainability criteria that can be categorized in six clusters: occupants’ health and comfort impact, society enhancement, cultural and community education, project stakeholder enhancement, building quality and technology enhancement, and socioeconomic growth. An empirical framework was developed for considering the impact level of social sustainability criteria in energy retrofit projects, including three levels: building, community, and society. The proposed framework can be used by practitioners who seek to consider or evaluate the social impacts of energy retrofits as well as policy makers who investigate the social aspects or social costs of energy reduction programs.

1 July 2013 in Journal of Management in Engineering
Verified
Journal Article
Closed access
JSJennifer S. Shane
Jennifer S. Shane
SBSusan M. Bogus
Susan M. Bogus
KMKeith R. Molenaar
Keith R. Molenaar
Owners of water/wastewater facilities can choose from several project delivery methods, including the traditional design-bid-build method or an alternative design-build method. When choosing a project delivery method, the owner should consider both the project goals as well as the performance of different project delivery methods. Detailed data on project delivery performance allow owners to match project goals, such as time savings, with project delivery methods. Detailed data on project delivery performance do not currently exist for the water/wastewater sector. Through a survey of water/wastewater facility owners, data were collected on 31 design-build projects and sixty-nine design-bid-build projects. A statistical analysis of the data determined that schedule growth for design-build projects was half that of design-bid-build projects; more design-build projects finished at or below budget; and both project delivery methods produced projects of comparable quality. Although this is the first st...

9 May 2016 in Remote Sensing
Verified
Journal Article
Open access
PDF file
SZSu Zhang
Su Zhang
CLChristopher Lippitt
Christopher Lippitt
SBSusan M. Bogus
Susan M. Bogus
PNPaul R. H. Neville
Paul R. H. Neville
Roadway pavement surface distress information is critical for effective pavement asset management, and subsequently, transportation management agencies at all levels (i.e., federal, state, and local) dedicate a large amount of time and money to routinely evaluate pavement surface distress conditions as the core of their asset management programs. However, currently adopted ground-based evaluation methods for pavement surface conditions have many disadvantages, like being time-consuming and expensive. Aircraft-based evaluation methods, although getting more attention, have not been used for any operational evaluation programs yet because the acquired images lack the spatial resolution to resolve finer scale pavement surface distresses. Hyper-spatial resolution natural color aerial photography (HSR-AP) provides a potential method for collecting pavement surface distress information that can supplement or substitute for currently adopted evaluation methods. Using roadway pavement sections located in the State of New Mexico as an example, this research explored the utility of aerial triangulation (AT) technique and HSR-AP acquired from a low-altitude and low-cost small-unmanned aircraft system (S-UAS), in this case a tethered helium weather balloon, to permit characterization of detailed pavement surface distress conditions. The Wilcoxon Signed Rank test, Mann-Whitney U test, and visual comparison were used to compare detailed pavement surface distress rates measured from HSR-AP derived products (orthophotos and digital surface models generated from AT) with reference distress rates manually collected on the ground using standard protocols. The results reveal that S-UAS based hyper-spatial resolution imaging and AT techniques can provide detailed and reliable primary observations suitable for characterizing detailed pavement surface distress conditions comparable to the ground-based manual measurement, which lays the foundation for the future application of HSR-AP for automated detection and assessment of detailed pavement surface distress conditions.

1 March 2009 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
NBNicolas A. Blacud
Nicolas A. Blacud
SBSusan M. Bogus
Susan M. Bogus
JDJames E. Diekmann
James E. Diekmann
KMKeith R. Molenaar
Keith R. Molenaar
In the quest to shorten project delivery time, construction professionals have the option of overlapping design and construction activities. Although time savings can be achieved by overlapping, conducting design and construction operations in a nonnatural sequence can carry significant risks. To mitigate these risks and make more appropriate overlapping decisions, concurrent engineering concepts can be used to classify upstream design activities in terms of design evolution and downstream construction activities in terms of sensitivity to upstream design changes. The focus of this work is to determine the factors that contribute to the sensitivity of construction activities. A series of semistructured interviews with experienced construction professionals show that the level of transformation, lead time, modularity, and the interaction of built components are some of the factors that determine the amount of sensitivity in construction activities to upstream design changes. These determinants provide for a quick assessment of an activity’s sensitivity, which can help practitioners limit risk when planning the overlapping of design and construction activities.