Ndamulelo Mararakanye

Ndamulelo Mararakanye

Auto-generated profile, based on publicly available information

Ndamulelo Mararakanye

Department of Electrical and Electronic Engineering, Stellenbosch University, Matieland, Stellenbosch, South Africa

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 November 2022 in IEEE Access
Verified
Journal Article
Open access
NMNdamulelo Mararakanye
Ndamulelo Mararakanye
ADAmaris Dalton
Amaris Dalton
BBBernard Bekker
Bernard Bekker
In some electricity markets, individual wind farms are obliged to provide point forecasts to the power purchaser or system operator. These decentralized forecasts are usually based on on-site meteorological forecasts and measurements, and thus optimized for local conditions. Simply adding decentralized forecasts may not capture some of the spatial and temporal correlations of wind power, thereby lowering the potential accuracy of the aggregated forecast. This paper proposes the explanatory variables that are used to train the kernel density estimator and conditional kernel density estimator models to derive day-ahead aggregated point and probabilistic wind power forecasts from decentralized point forecasts of geographically distributed wind farms. The proposed explanatory variables include (a) decentralized point forecasts clustered using the clustering large applications algorithm to reduce the high-dimensional matrices, (b) hour of day and month of year to account for diurnal and seasonal cycles, respectively, and (c) atmospheric states derived from self-organizing maps to represent large-scale synoptic circulation climatology for a study area. The proposed methodology is tested using the day-ahead point forecast data obtained from 29 wind farms in South Africa. The results from the proposed methodology show a significant improvement as compared to simply adding the decentralized point forecasts. The derived predictive densities are shown to be non-Gaussian and time-varying, as expected given the time-varying nature of wind uncertainty. The proposed methodology provides system operators with a method of not only producing more accurate aggregated forecasts from decentralized forecasts, but also improving operational decisions such as dynamic operating reserve allocation and stochastic unit commitment.

2 June 2022 in IEEE Access
Verified
Journal Article
Open access
NMNdamulelo Mararakanye
Ndamulelo Mararakanye
ADAmaris Dalton
Amaris Dalton
BBBernard Bekker
Bernard Bekker
Wind energy is one of the fastest-growing renewable energy sources in the world. However, wind power is variable in all timescales. This variability is difficult to predict with perfect certainty, with potentially significant financial implications when rare extreme forecast errors occur. This paper focuses on three key aspects associated with the extreme errors of geographically distributed wind farms: suitable parametric distribution representation, effects of diurnality, seasonality and larger atmospheric circulations, and modeling multivariate distribution. The paper shows that some of the distributions commonly used for modeling forecast errors may be inappropriate in representing extreme errors. As the first contribution, this paper fits a Generalized Pareto distribution (GPD) from extreme value theory to achieve a better estimation of extreme errors. In the second contribution, this paper splits extreme errors by hour, month, and atmospheric states to investigate the statistical regularities of GPD parameters along diurnal and seasonal timescales and larger atmospheric circulations. In the third contribution, this paper uses copula functions to model multivariate extreme error distribution and investigates their effectiveness in providing a regional view of extreme errors. This paper tests the proposed methodology using the forecast error data obtained from 29 wind farms in South Africa. The results show that GPD outperforms commonly used distributions. Extreme errors have strong diurnal and seasonal components and vary significantly between SOM nodes. Copulas can be useful in providing a regional view of extreme errors. This paper improves the estimation of extreme errors, which is an important step toward better operating reserve allocation.

13 December 2021 in Journal of Energy in Southern Africa
Verified
Journal Article
Open access
PDF file
TMThabang B. M. Mosaka
Thabang B. M. Mosaka
NMNdamulelo Mararakanye
Ndamulelo Mararakanye
BBBernard Bekker
Bernard Bekker
The South African Renewable Independent Power Producer Procurement Programme selects bid winners based on bid tariff (70% weighting) and various economic development criteria (30% weighting). Locating renewable energy (RE) projects in areas with better resources increases their cost competitiveness. As a result, most successful bids for wind and solar photovoltaic (PV) systems to date have been concentrated in the Eastern Cape and Northern Cape provinces, respectively. Studies have shown that a wider geographic distribution of wind and solar PV projects mitigates the impacts of the variability of wind and solar PV resources, eases grid congestion and generally improves the power system’s operation. This paper conducts a literature review to investigate the procurement methods used in different regions of the world to influence the placement of RE plants, the results of which then inform proposals on adjustments to the current REI4P. The study finds that, after congestion incidents due to concentration of RE plants, some regions implement location-based tariff, where high-resource areas receive the lowest tariff and vice versa. Other regions prioritise on building transmission infrastructure in high-resource areas, while others limit the size of RE installations in one area. Given the current generation and transmission constraints in South Africa, it is important to encourage geographical dispersion of RE plants and avoid RE curtailment, since this can escalate the cost of RE integration significantly.