Maria Di Mascolo

Maria Di Mascolo

Auto-generated profile, based on publicly available information

Maria Di Mascolo

Grenoble Alpes CNRS Grenoble INP G-SCOP 38000 Grenoble France

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 July 2023 in International Journal of Production Research
Verified
Journal Article
Closed access
TMThenarasu M
Thenarasu M
KRK. Rameshkumar
K. Rameshkumar
MMM. Di Mascolo
M. Di Mascolo
SAS.P. Anbuudayasankar
S.P. Anbuudayasankar

9 September 2023 in Computers & Operations Research
Verified
Journal Article
Closed access
CMCléa Martinez
Cléa Martinez
MEMarie-Laure Espinouse
Marie-Laure Espinouse
MMMaria Di Mascolo
Maria Di Mascolo

1 July 2025 in International Journal of Prognostics and Health Management
Verified
Journal Article
Open access
PDF file
MMMaria Di Mascolo
Maria Di Mascolo
ZSZineb Simeu-Abazi
Zineb Simeu-Abazi
RDRony Djeunang
Rony Djeunang
This study proposes an integrated heuristic framework for the strategic optimization of distributed maintenance operations in geo-distributed production systems (GDPS). It introduces a dual-entity maintenance structure comprising a Centralized Maintenance Workshop (CMW) and a Mobile Maintenance Workshop (MMW), aimed at minimizing total long-term maintenance costs. The cost function incorporates transport, operations, and downtime penalties, optimized via a two-stage algorithmic approach: a Maintenance Planning Algorithm (MPA) based on predictive maintenance scheduling, and a Long-term Heuristic Scheduling Algorithm (LHSA) addressing a capacitated vehicle routing problem with time windows (CVRPTW). A novel contribution includes a heuristic for CMW location determination using the weighted barycentre of site failure probabilities and a discrete selection of MMW capacities. Mixed Integer Linear Programming (MILP) and a divide-and-conquer heuristic are utilized to handle the NP-hard nature of the problem. Experimental validation using Weibull-distributed failure data and various cost scenarios demonstrates that the proposed Optimised Maintenance and Capacitated Routing (OMCR) framework can reduce lifecycle maintenance costs by up to 50%, with increased scalability for systems exceeding 30 GDPS. The framework is applicable to sectors requiring high availability and centralized servicing, including aerospace, railway, and energy industries.

1 January 2022 in Génie Industriel et Productique
Verified
Journal Article
Open access
AFAlois Franzino
Alois Franzino
LTLorraine Trilling
Lorraine Trilling
MMMaria Di Mascolo
Maria Di Mascolo
TMThibaud Monteiro
Thibaud Monteiro
Dans cet article, nous nous intéressons à l'organisation d'activités de soins à domicile. Nous nous concentrons sur la planification des accompagnements d'un ensemble d'enfants en situation de handicap (...)

23 December 2023
Verified
Book Chapter
Closed access
PDF file
FSFrancielly Hedler Staudt
Francielly Hedler Staudt
MMMaria di Mascolo
Maria di Mascolo
MGMarina Cardoso Guimarães
Marina Cardoso Guimarães
GAGülgün Alpan
Gülgün Alpan
CRCarlos Manuel Taboada Rodriguez
Carlos Manuel Taboada Rodriguez
DIEGO FETTERMANNDIEGO FETTERMANN
DIEGO FETTERMANN

22 August 2025 in arXiv
Verified
Preprint
Open access
PDF file
MMMaria Di Mascolo
Maria Di Mascolo
ZSZineb Simeu-Abazi
Zineb Simeu-Abazi
RMRony Arsène Djeunang Mezafack
Rony Arsène Djeunang Mezafack
This study proposes an integrated heuristic framework for the strategic optimization of distributed maintenance operations in geo-distributed production systems (GDPS). It introduces a dual-entity maintenance structure comprising a Centralized Maintenance Workshop (CMW) and a Mobile Maintenance Workshop (MMW), aimed at minimizing total long-term maintenance costs. The cost function incorporates transport, operations, and downtime penalties, optimized via a two-stage algorithmic approach: a Maintenance Planning Algorithm (MPA) based on predictive maintenance scheduling, and a Long-term Heuristic Scheduling Algorithm (LHSA) addressing a capacitated vehicle routing problem with time windows (CVRPTW). A novel contribution includes a heuristic for CMW location determination using the weighted barycentre of site failure probabilities and a discrete selection of MMW capacities. Mixed Integer Linear Programming (MILP) and a divide-and-conquer heuristic are utilized to handle the NP-hard nature of the problem. Experimental validation using Weibull-distributed failure data and various cost scenarios demonstrates that the proposed Optimised Maintenance and Capacitated Routing (OMCR) framework can reduce lifecycle maintenance costs by up to 50%, with increased scalability for systems exceeding 30 GDPS. The framework is applicable to sectors requiring high availability and centralized servicing, including aerospace, railway, and energy industries.