Kangjia Xue

Kangjia Xue

Auto-generated profile, based on publicly available information

Kangjia Xue

Institute of High Energy Physics, Chinese Academy of Sciences (CAS), Beijing 100049

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2015 in Chinese Physics C
Verified
Journal Article
Closed access
SLSheng-Jin Liu
Sheng-Jin Liu
THTao Huang
Tao Huang
HOHua-Fu Ouyang
Hua-Fu Ouyang
FZFu-Xiang Zhao
Fu-Xiang Zhao
YXYong-Chuan Xiao
Yong-Chuan Xiao
YLYi Li
Yi Li

21 September 2018 in AIP Conference Proceedings
Verified
Conference Paper
Open access
PDF file
WCW. Chen
W. Chen
HOH. Ouyang
H. Ouyang
YXYi Xiao
Yi Xiao
SLS. Liu
S. Liu
YLY. Lü
Y. Lü
KXK. Xue
K. Xue
A Radio Frequency (RF) H-minus source with external antenna is under construction to improve the performance of China Spallation Neutron Source (CSNS), which requires a H-minus beam of 40 mA peak current, 25 Hz repetition rate, and 1 ms pulse length. The plasma chamber is made of Si3N4 ceramic to endure high thermal shock. The water-cooled antenna is brazed on the outer wall of the plasma chamber to enhance heat dissipation of the chamber. The antenna is powered with a solid-state amplifier of maximum 80 kW via an isolation transformer and an impedance transformer. To produce a flat-top H-minus current, we aim to program the amplitude of RF input signal,so that the fluctuation of the beam current is compensated with the change of the RF power within a pulse. Up to now the mechanical construction of the source is finished, and the RF match network is ready for test. The source is scheduled to produce plasma in the end of 2017.

1 July 2026 in Journal of Instrumentation
Verified
Journal Article
Closed access
PDF file
YMYinglin Ma
Yinglin Ma
QWQingbiao Wu
Qingbiao Wu
LLLun Li
Lun Li
SZSixuan Zhuang
Sixuan Zhuang
HDHaobo Deng
Haobo Deng
GZGe Zhang
Ge Zhang
The Phase-II project of the China Spallation Neutron Source (CSNS-II) adopts a parallel construction-and-operation mode to minimize interference with ongoing scientific research. However, this mode presents severe radiation protection challenges. The project requires excavation of overlying soil outside the existing tunnel for tunnel connection; after soil removal, the simulated dose rate outside the tunnel reaches 5.5 mSv/h, considerably exceeding the safety limit, necessitating temporary shielding. Shielding design based on the conventional 1 W/m beam loss assumption is infeasible due to high cost and insufficient space. Accordingly, this work performs inverse estimation of beam loss via in-situ radiation measurements to optimize the temporary shielding design. Given the uncertainty of beam loss, continuous monitoring of radiation dose outside the shielding is required, but conventional fixed dosimeters are unsuitable owing to the lack of stable power supply at the construction site. A solar-powered mobile radiation monitoring system was therefore developed to enable long-term continuous monitoring in off-grid construction areas. The monitoring data are integrated into the radiation safety interlock system, which automatically cuts off the beam when the dose rate exceeds the threshold due to beam loss, thereby mitigating radiation risks. Furthermore, to ensure occupational exposure control for construction personnel — who cannot wear personal dosimeters on-site — combined dosimeters are deployed at key dose concern locations, implementing an area-monitoring-based surrogate for personal dosimetry. Field application demonstrates that the mobile monitoring system realizes long-term continuous monitoring over multiple accelerator operation cycles, and the temporary shielding reduces the dose rate in the unrestricted construction zone to below the management target of 0.25 μSv/h. The results effectively guarantee radiation safety during CSNS-II parallel construction and operation, and provide technical reference for similar large-scale scientific facilities.