Zhenhong Wang

Zhenhong Wang

Auto-generated profile, based on publicly available information

Zhenhong Wang

Department of Structures and Materials, China Institute of Water Resources and Hydropower Research, Beijing 100038, China

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 January 2018 in Advances in Mechanical Engineering
Verified
Journal Article
Open access
BLBingqi Li
Bingqi Li
ZWZhenhong Wang
Zhenhong Wang
YJYunhui Jiang
Yunhui Jiang
ZZZhenyang Zhu
Zhenyang Zhu
Temperature cracks commonly occur during mass concrete construction. Research shows that changes in temperature and peripheral constraints mainly cause crack formation in concrete. Engineers who lack experience often build structures prone to concrete cracks. Dams built in the high-altitude areas of Tibet are examples of such structure. Climatic conditions, such as large temperature variation and strong solar radiation, disrupt temperature control and crack prevention in concrete. In this study, we explored the measures for temperature control and crack prevention that are suitable for concrete structures, especially those built in high-altitude areas with large temperature variation and strong constraint zones. The study was performed in a steep slope dam section and stilling basin in Tibet. The finite element method was used to guide the engineering construction in the area. These methods could be applied to the construction of similar projects in other high-altitude areas.

28 September 2014 in Materials and Structures
Verified
Journal Article
Closed access
PDF file
ZWZhenhong Wang
Zhenhong Wang
YLYi Liu
Yi Liu
GZGuoxin Zhang
Guoxin Zhang
WHWenqian Hou
Wenqian Hou

1 January 2018 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
ZWZhenhong Wang
Zhenhong Wang
LTLi Tao
Li Tao
YLYi Liu
Yi Liu
JYJiang Yunhui
Jiang Yunhui
The focus on the development of China’s vast hydropower resources has shifted to Tibet and other plateau regions. These areas are high‐altitude regions whose basic climatic characteristics are as follows: dry climate, significant differences in daily temperature, and strong solar radiation. If a dam is built under such special climate conditions, specific and strict temperature control and crack prevention measures should be taken. Therefore, this study explores the temperature control standards, as well as temperature control and crack prevention measures, for concrete in high‐altitude regions using three‐dimensional finite element methods and based on the concrete gravity dam in Tibet in combination with the characteristics of material properties that are disadvantageous to temperature control and crack prevention. The temperature drop process can be optimized in time, and the temperature drop rate can be controlled to prevent excessive scale and temperature drop rates. Moreover, the temperature gradient can be spatially optimized, and thus, the differences in foundation temperatures, upper‐ and lower‐layer temperatures, and internal and external temperatures can also be reduced. The research shows that the recommended temperature control and crack prevention measures can effectively reduce temperature stress. This study has a significant value as a reference for similar projects in high‐altitude regions.

10 March 2015 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
ZWZhenhong Wang
Zhenhong Wang
YLYi Liu
Yi Liu
GZGuoxin Zhang
Guoxin Zhang
SYShuping Yu
Shuping Yu
There are unprecedented difficulties in building concrete gravity dams in the high altitude province Tibet with problems induced by lack of experience and technologies and unique weather conditions, as well as the adoption of construction materials that are disadvantageous to temperature control and crack prevention. Based on the understandings of the mentioned problems and leveraging the need of building gravity dam in Tibet, 3D finite element method is used to study the temperature control and crack prevention of the dam during construction. The calculation under recommend temperature control measures and standards shows that the height and number of simultaneous cooling zone have the more obvious influencers on concrete stress; therefore, it is suggested to increase the height of simultaneous cooling zone to decrease the stress caused by temperature gradient of adjoin layers so as to raise the safety level of the whole project. The research methods and ideas used on this project have significant values and can be taken as references in similar projects in high altitude regions.

1 January 2014 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
WZWang Zhenhong
Wang Zhenhong
LYLiu Yi
Liu Yi
YSYu Shuping
Yu Shuping
Given that spillways adopt a hydraulic thin concrete plate structure, this structure is difficult to protect from cracks. The mechanism of the cracks in spillways shows that temperature stress is the major reason for cracks. Therefore, an effective way of preventing cracks is a timely and reasonable temperature‐control program. Studies show that one effective prevention method is surface thermal insulation combined with internal pipe cooling. The major factors influencing temperature control effects are the time of performing thermal insulation and the ways of internal pipe cooling. To solve this problem, a spillway is taken as an example and a three‐dimensional finite element program and pipe cooling calculation method are adopted to conduct simulation calculation and analysis on the temperature fields and stress fields of concretes subject to different temperature‐control programs. The temperature‐control effects are then compared. Optimization results show that timely and reasonable surface thermal insulation and water‐flowing mode can ensure good temperature‐control and anticrack effects. The method has reference value for similar projects.

1 May 2018 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
YTYaosheng Tan
Yaosheng Tan
YLYouzhi Liu
Youzhi Liu
MZMengxia Zhou
Mengxia Zhou
ZWZhenhong Wang
Zhenhong Wang
PYPing Yang
Ping Yang
To study concrete cracking, a feedback analysis on variations of surface temperature gradient has been conducted for concrete at the intermission stage of layer pouring with a precise model and finite element simulation method combined with in-situ experiments of a dry hot valley dam. This paper presents the results of concrete stresses and their development under real concrete temperature gradient and explores the internal crack mechanism and possible hidden cracks of the concrete. A discussion on effective measures for prevention of such cracking risk, particularly for construction of valley dams in a dry hot season is also given. This work is of practical reference value for construction of concrete structure in dry hot valley.