Gustavo Marçal de Sousa

Gustavo Marçal de Sousa

Auto-generated profile, based on publicly available information

Gustavo Marçal de Sousa

Geotechnical Project Management, VALE S.A., Nova Lima, Brazil

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 July 2023 in Acta Geotechnica
Verified
Journal Article
Closed access
PDF file
NCNilo Cesar Consoli
Nilo Cesar Consoli
JSJoão Paulo de Sousa Silva
João Paulo de Sousa Silva
AWAlexia Cindy Wagner
Alexia Cindy Wagner
JCJoão Vítor de Azambuja Carvalho
João Vítor de Azambuja Carvalho
BBBeatrice Baudet
Beatrice Baudet
PCPedro Pazzoto Cacciari
Pedro Pazzoto Cacciari

5 May 2025 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
NCNilo Cesar Consoli
Nilo Cesar Consoli
DCDécio Collatto
Décio Collatto
JCJoão Vítor de Azambuja Carvalho
João Vítor de Azambuja Carvalho
AWAlexia Cindy Wagner
Alexia Cindy Wagner
JSJoão Paulo de Sousa Silva
João Paulo de Sousa Silva
HFHugo Carlos Scheuermann Filho
Hugo Carlos Scheuermann Filho

1 December 2020 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
GSGustavo Marçal Sousa
Gustavo Marçal Sousa
RGRomero César Gomes
Romero César Gomes
This article introduces a hassle-free methodology for geotechnical parameters to be obtained from correlations between geophysics and CPT field tests in tailings dams undergoing the decommissioning process, which are reasonably representative of site conditions, from the very early project stages, with extensive coverage of all impoundment parts, without the requirement for large-size drilling programs. The development methodology consists of running direct (CPT) and indirect (geophysics) tests within the same area of the tailings dam to be decommissioned, with information crosschecking, thus allowing for results to be presented as adjustment equations, capable of describing tailings undrained shear strength based on geophysical survey data. A dam within the region known as Iron Quadrangle, in the state of Minas Gerais, Brazil, was selected to pilot the tests. The results obtained showed consistent adjustments, thus validating the proposed methodology as a complementary geotechnical investigation tool, and also enabling an optimized investigation plan to be proposed for similar tailings dams undergoing a mining process, so as to provide better assessment of the safety conditions of the proposals for deactivation with reduced schedule and resource savings.

4 February 2021 in Research Square
Verified
Preprint
Open access
PDF file
GSGustavo Marçal De Sousa
Gustavo Marçal De Sousa
SFSérgio Augusto Ferreira
Sérgio Augusto Ferreira
RGRomero César Gomes
Romero César Gomes
Induced vibrations in tailings dams in Brazil became subject to studies after two major accidents in upstream-built structures. These ground vibrations may be responsible for liquefaction triggers and that motivated the development of this paper, which consists in the presentation of a methodology to perform homogeneous vibration monitoring tests along the entire embankment with an initial offline stage that later progressed to an automated process that represents the core object of the paper. Data collected from the initial monitoring enabled analyses of dam stability when correlating vibration levels in the embankment. As a consequence of such analyses, it was possible to parameterize control levels associated to safety criteria. Monitoring methodology, analysis techniques and gains resulting from the use of automated monitoring systems are presented herein. Parameterized control levels regarding the structure under study as well as their association to the stability condition, analysis of liquefaction trigger set for vibration values, advanced analysis of seismographic records and an automated operational vibration control system from monitoring using seismographic stations are shown. The implementation of the automated monitoring system associated to safety control levels allowed a robust diagnosis of eventual structural damages caused by vibrations in dams. That methodology was applied to a dam in operation and permitted evaluation of operation continuity concerning industrial plants and different operations with earthworks equipment on the embankment and its surrounding area.