1 January 2008 in International Journal of Forest Engineering
Time and motion studies have been and still are frequently used to describe, understand, and improve forest operations. Delays are recognized as being one of the major factors that limit productivity in most operations and are, therefore, an integral part of most time studies. But, delay events are erratic in both occurrence and magnitude and are, therefore, difficult to precisely quantify within the relatively short observation period of a typical time and motion study. Thus, delay information from individual studies have limited transferability. This paper analyzes the delay component of 34 harvester time study data sets that were recorded between 1998 and 2006. All of the studies were designed and carried out with the same principal investigator. The data sets were all based on harvesters either harvesting and or processing. Three delays categories were used: mechanical, operator, and other. Delays averaged 28.9 percent of the total scheduled time for all 34 studies, comprising of 7.1 percent mechanical, 4.7 percent operator, and 17.1 percent other delays. Delay averages were compared within category descriptions assigned to each data set for statistical significance. Example results include: total delays were higher for operations working on hot decks versus cold decks and operations working in mixed stands had more than twice the overall delays compared to operations in plantations. Considering only mechanical delays, machines that both felled and processed, compared to just processing, had higher mechanical delays. Interestingly, dedicated harvesting machines versus harvesting heads mounted on an excavator base had on average higher operator delays.
18 June 2006 in International Journal of Forest Engineering
Cable yarding continues to be an efficient and effective harvesting system for the extraction of timber on steep terrain. Modern European silvicultural strategies result in smaller harvest areas, lower extraction volumes and a shift from clear-cut to thinning operations or single tree extraction. Yarder installation time has, especially as a proportion to the extraction time, increased significantly, resulting in higher extraction costs. This study recorded the set-up and take-down time of 79 cable yarder installations. Another 76 installation times were taken from previously published time studies, for a total sample size of 155. The factorial study design differentiated uphill-or downhill yarding, yarder size and whether or not it was the first installation at a landing, or subsequent parallel installation from the same landing area. The covariates recorded were corridor length, terrain slope, number and height of intermediate supports, and number of forest workers. Both a set-up and take-down time models were developed. This will help estimate future cable installation time requirements, and more importantly, provide improved cost estimates for the new silvicultural treatments.
1 January 2004 in International Journal of Forest Engineering
An analysis of log-making (bucking) performance for five logging crews in southern Appalachian mixed-hard- wood stands of Virginia and West Virginia was conducted. Cutting accuracy and value recovery were analyzed and compared to an optimal solution that was determined through the use of the HW-BUCK computer software. In total 148 trees were bucked into 510 logs and only 11 percent were cut accurately. Fifteen percent were under cut and 74 percent were over length. The crew with the best performance in length cutting accuracy also recorded the lowest value recovery loss. An average value loss of 20.7 percent was calculated for all five crews.