Background: Bedtime procrastination (BP) has become an important factor affecting individual well-being. This study aimed to assess the stability and changes in BP and examine risk and protective factors. Methods: The study recruited 1423 respondents. Latent profile analysis was used to identify subgroups of BP and latent transition analysis to determine transition probabilities for each subgroup. Logistic regression examined associations between identified classes and related factors. Results: Three subgroups of BP were identified. In terms of stability and changes, the moderate bedtime procrastination group showed the highest stability (66%), followed by the severe bedtime procrastination group (62.4%), and the mild bedtime procrastination group had a 52% probability of switching to moderate bedtime procrastination. In terms of influencing factors, more problematic phone use (PSU) (OR: 1.08; 95% CI = 1.05– 1.12), more depression (OR: 1.17; 95% CI = 1.06– 1.29) and anxiety (OR: 1.16; 95% CI = 1.05– 1.28) are all factors that aggravate the transition from mild to moderate sleep procrastination. Similarly, PSU (OR: 1.15; 95% CI = 1.12– 1.19), anxiety (OR: 1.10; 95% CI = 1.06– 1.14), and depression (OR: 1.10; 95% CI = 1.06– 1.14) increased the risk of severe bedtime procrastination. Self-control emerged as a protective factor against BP. Conclusion: This study identified three subgroups of BP at two time points and the rule of transition for each subgroup. Our findings indicate that BP were relatively stable, with some changes over time. The results also highlight the important function that PSU, depression, anxiety, and self-control can play in preventing and intervening in BP.
The mechanical properties of the transmission system have a great influence on the operation stability of high-speed breaking circuit breakers. This paper designs a 550kV high-speed breaking circuit breaker drive system, establishes a transient dynamics simulation model of the drive system, and compares and analyzes the contact movement characteristics and the force of each component during normal and high-speed opening processes. The research results show that the moving contact displacement and speed simulation results are highly consistent with the experimental test data, and the maximum error does not exceed 5%; the peak stress of each component of the high-speed circuit breaker transmission mechanism is far greater than that of the normal-speed circuit breaker, and the maximum load occurs in the substation The starting time of the brake; the stress peaks of the components of the transmission mechanism of the constant-speed circuit breaker are within the safety margin, and the maximum stress values of the guide rod joint and the crank arm in the transmission mechanism of the highspeed circuit breaker during the entire opening process are respectively 1003.6MPa and 717.44MPa, exceeding the yield strength of the material itself, there is a risk of damage.