Mackenzie K. Keith

Mackenzie K. Keith

Auto-generated profile, based on publicly available information

Mackenzie K. Keith

Geological Survey U Reston Virginia S

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2013
Verified
Report
Open access
JWJ. Rose Wallick
J. Rose Wallick
KJKrista L. Jones
Krista L. Jones
JOJim E. O'Connor
Jim E. O'Connor
MKMackenzie K. Keith
Mackenzie K. Keith
DHDavid Hulse
David Hulse
SGStanley V. Gregory
Stanley V. Gregory

1 January 2011
Verified
Report
Closed access
JWJ. Rose Wallick
J. Rose Wallick
JOJim E. O'COnnor
Jim E. O'COnnor
SAScott Anderson
Scott Anderson
MKMackenzie K. Keith
Mackenzie K. Keith
CCCharles Cannon
Charles Cannon
JRJohn C. Risley
John C. Risley
The Umpqua River drains 12,103 square kilometers of western Oregon; with headwaters in the Cascade Range, the river flows through portions of the Klamath Mountains and Oregon Coast Range before entering the Pacific Ocean. Above the head of tide, the Umpqua River, along with its major tributaries, the North and South Umpqua Rivers, flows on a mixed bedrock and alluvium bed, alternating between bedrock rapids and intermittent, shallow gravel bars composed of gravel to cobble-sized clasts. These bars have been a source of commercial aggregate since the mid-twentieth century. Below the head of tide, the Umpqua River contains large bars composed of mud and sand. Motivated by ongoing permitting and aquatic habitat concerns related to in-stream gravel mining on the fluvial reaches, this study evaluated spatial and temporal trends in channel change and bed-material transport for 350 kilometers of river channel along the Umpqua, North Umpqua, and South Umpqua Rivers. The assessment produced (1) detailed mapping of the active channel, using aerial photographs and repeat surveys, and (2) a quantitative estimation of bed‑material flux that drew upon detailed measurements of particle size and lithology, equations of transport capacity, and a sediment yield analysis. Bed-material transport capacity estimates at 45 sites throughout the South Umpqua and main stem Umpqua Rivers for the period 1951–2008 result in wide-ranging transport capacity estimates, reflecting the difficulty of applying equations of bed-material transport to a supply-limited river. Median transport capacity values calculated from surface‑based equations of bedload transport for each of the study reaches provide indications of maximum possible transport rates and range from 8,000 to 27,000 metric tons per year (tons/yr) for the South Umpqua River and 20,000 to 82,000 metric tons/yr for the main stem Umpqua River upstream of the head of tide; the North Umpqua River probably contributes little bed material. A plausible range of average annual transport rates for the South and main stem Umpqua Rivers, based on bedload transport capacity estimates for bars with reasonable values for reference shear stress, is between 500 and 20,000 metric tons/yr. An empirical bed-material yield analysis predicts 20,000–50,000 metric tons/yr on the South Umpqua River and main stem Umpqua River through the Oregon Coast Range, decreasing to approximately 30,000 metric tons/yr at the head of tide. Surveys of individual mining sites in the South Umpqua River indicate minimum local bed-material flux rates that are typically less than 10,000 metric tons/yr but range up to 30,600 metric tons/yr in high-flow years. On the basis of all of these analyses, actual bedload flux in most years is probably less than 25,000 metric tons/yr in the South Umpqua and main stem Umpqua Rivers, with the North Umpqua River probably contributing negligible amounts. For comparison, the estimated annual volume of commercial gravel extraction from the South Umpqua River between 2001 and 2004 ranged from 610 to 36,570 metric tons, indicating that historical in-stream gravel extraction may have been a substantial fraction of the overall bedload flux.

1 January 2017
Verified
Report
Open access
PDF file
SAScott W. Anderson
Scott W. Anderson
MKMackenzie K. Keith
Mackenzie K. Keith
CMChristopher S. Magirl
Christopher S. Magirl
JWJ. Rose Wallick
J. Rose Wallick
MMMark C. Mastin
Mark C. Mastin
JFJames R. Foreman
James R. Foreman
First posted August 3, 2017 Director, Washington Water Science Center U.S. Geological Survey 934 Broadway, Suite 300 Tacoma, Washington 98402 On March 22, 2014, the State Route 530 Landslide near Oso, Washington mobilized 8 million cubic meters of unconsolidated Pleistocene material, creating a valley‑spanning deposit that fully impounded the North Fork Stillaguamish River. The river overtopped the 8-meter high debris impoundment within 25 hours and began steadily incising a new channel through the center of the deposit. Repeat topographic surveys, sediment transport measurements, bedload transport models, and observations of downstream channel change were used to document the establishment of that new channel through the landslide and assess the potential for downstream aggradation or channel change that might increase downstream flood hazards. Efficient erosion of the landslide deposit, associated with the steep knickzone formed by the downstream edge of the deposit, resulted in the re-establishment of a 20–40 meters wide, deeply inset channel through the entire deposit by May 2014, 2 months after the landslide. The mean water-surface elevation of the channel through the landslide decreased 7 meters during that 2-month period, and was about 1 meter above the pre-landslide profile in July 2014. The 2014–15 flood season, which included flows near the 0.5 annual exceedance probability discharge (2-year flood), widened the channel tens of meters, and further lowered the water-surface profile 0.5 meter. The planform position evolved slowly as a result of 5–20-meter high banks predominantly composed of clay-rich, cohesive lacustrine material. Erosion of the landslide deposit delivered a total of 820 thousand metric tons of sediment to the North Fork Stillaguamish River over the 18 months following the landslide. The sediment delivery from the deposit was predominantly fine grained: 77 percent (by mass) of the eroded material was silt or clay (less than 0.063 millimeter [mm]), 19 percent sand (0.063–2 mm), and 4 percent pebbles and cobbles (greater than 2 mm). Over the 18 months following the landslide, the bedload at a site 5 kilometers downstream of the landslide was estimated to be 310±65 thousand metric tons, and the suspended load at that same site was estimated to be 990±110 thousand metric tons. These loads represent the combined input from the landslide and ambient upstream sources; over the study interval, landslide sediment made up about 20–40 percent of the bedload, and 65–85 percent of the suspended-sediment load at this site. At a site 70 kilometers downstream of the landslide, near the mouth of the main‑stem Stillaguamish River, suspended sediment loads were estimated to be about 1,440 thousand metric tons, of which about 600 thousand metric tons, or 30 percent, likely was derived from the landslide. The mass of landslide sediment in suspension at the mouth of the river, and the timing of arrival of that sediment, indicates that about 70 percent of the landslide sediment eroded during the study period was quickly transported through the entire basin, exiting into Puget Sound within weeks of initial entrainment. Empirical bedload transport equations, in conjunction with surficial grain-size data and output from a one‑dimensional hydraulic model, were used to estimate spatial trends in bedload transport capacity, highlighting areas where reach-scale conditions would be most likely to promote deposition of coarse landslide sediment. Transport capacities decreased sharply over a reach about 5 kilometers downstream of the landslide and remained relatively low over the next 10 kilometers downstream. However, the magnitude of calculated transport capacities are large relative to the coarse sediment input from the landslide, suggesting that substantial deposition of landslide sediment was not likely to occur. These assessments were corroborated by observations of channel change, which indicated that the downstream channel response to the landslide was modest and short-lived. The most pronounced downstream effects included a wedge of aggradation just downstream of the landslide, about 1 meter high and extending a kilometer downstream, and a 0.3-meter pulse of aggradation observed 5 kilometers downstream of the landslide. In both locations, peak aggradation and channel response occurred within about a month of the landslide, and both sites had largely recovered to pre-landslide conditions by July 2014. No substantial channel change clearly linked to the landslide was observed after July 2014 except for a modest fining of surficial gravel size distributions and continued recovery and incision of the reach just downstream of the landslide. The muted downstream response of the North Fork Stillaguamish River to the State Route 530 Landslide primarily can be attributed to the cohesive, silt- and clay-rich material that bounded most of the new channel. Although the river efficiently incised a new channel through the deposit, subsequent rates of lateral erosion were slowed by the tall, cohesive banks, limiting the total volume of sediment delivery. Once entrained, however, most landslide material was rapidly transported downstream in suspension with little geomorphic effect. Landslide material coarse enough to travel as bedload was predominantly sand and fine gravel, and sediment transport models and observations of downstream change indicated that the rate of coarse sediment delivery from the landslide did not exceed the rivers ability to transport that material. The generally muted downstream response to sediment delivery from the State Route 530 Landslide, as well as the mechanics of that delivery and response, were generally consistent with observations made following the intentional removal of constructed dams. The rate and efficiency of erosion from the landslide decreased over the period of analysis, as the new...

1 January 2014
Verified
Report
Closed access
JOJames E. O'COnnor
James E. O'COnnor
BABrian F. Atwater
Brian F. Atwater
TCTimothy A. Cohn
Timothy A. Cohn
TCThomas M. Cronin
Thomas M. Cronin
MKMackenzie K. Keith
Mackenzie K. Keith
RMRobert R. Mason
Robert R. Mason

1 January 2022
Verified
Report
Closed access
PDF file
MKMackenzie K. Keith
Mackenzie K. Keith
JWJ. Rose Wallick
J. Rose Wallick
RFRebecca L. Flitcroft
Rebecca L. Flitcroft
TKTobias J. Kock
Tobias J. Kock
LBLaura A. Brown
Laura A. Brown
KJKrista L. Jones
Krista L. Jones
Since 2008, large-scale restoration programs have been implemented along the Willamette River, Oregon, to address historical losses of floodplain habitats caused by dam construction, bank protection, large wood removal, land conversion, and other anthropogenic influences. The Willamette Focused Investment Partnership (WFIP) restoration initiative brings together more than 16 organizations to improve floodplain habitats on more than 35,000 hectares upstream from Willamette Falls with the overarching goal to expand and enhance native fish habitats through the following restoration activities implemented along the floodplains and off-channel areas of the Willamette River: (A) modify floodplain topography and human-made barriers to inundation; (B) enhance gravel pits; (C) remove revetments; (D) construct off-channel features; (E) increase and enhance floodplain forest vegetation; and (F) treat aquatic invasive plant species (AIS). The WFIP Effectiveness Monitoring Program was initiated to inform future refinement of Willamette River restoration program goals and activities and has three goals: (1) evaluate the effectiveness of different restoration activities at increasing and enhancing native fish habitat, (2) improve overall understanding of the physical and ecological responses associated with different restoration activities undertaken by the WFIP, and (3) relate site-scale responses to restoration with broader patterns of fish communities, hydrogeomorphology, stream temperature, and vegetation across the Willamette River floodplain, so that the relative importance of restoration activities on habitat availability for native fish can be assessed.A monitoring framework was developed to evaluate effectiveness of floodplain restoration activities at increasing and enhancing habitat for native fish in the Willamette River corridor, northwestern Oregon. This framework describes monitoring indicators, metrics, and approaches for evaluating responses in native fish communities and physical habitat conditions to restoration activities and determining effectiveness of restoration activities at improving habitats for native fish. The monitoring indicators and approaches are grouped into five restoration monitoring categories that are useful for characterizing ecological and physical habitat responses to restoration activities: fish, hydrogeomorphology, floodplain forest vegetation, birds, and AIS. This monitoring framework provides a common science foundation to support collaborative decisions on future interdisciplinary effectiveness monitoring activities for Willamette River restoration programs. To evaluate restoration effectiveness, data must be evaluated according to metrics and thresholds that permit direct comparison between habitat conditions at the restoration site and restoration program goals; this framework provides examples of metrics and thresholds for evaluating data, recognizing that the precise evaluation criteria for a particular site or program will need to be tailored to meet program questions and available resources. Refining restoration goals and activities as part of an adaptively managed process requires addressing critical uncertainties between restoration goals, restoration activities, and outcomes for habitats used by native fish. Although the monitoring activities of this framework will generate important datasets useful for evaluating restoration effectiveness, additional research, syntheses, and reporting is ultimately necessary to provide a common science foundation to support adaptively managed restoration programs. This report is intended as a resource for restoration program managers, practitioners, scientists, and contractors as they develop detailed annual monitoring plans for data collection and identify the monitoring indicators, metrics, and approaches that are appropriate for evaluating effectiveness of different restoration activities.

1 January 2012 in Open-File Report
Verified
Other
Closed access
KJKrista L. Jones
Krista L. Jones
JOJim E. O'Connor
Jim E. O'Connor
MKMackenzie K. Keith
Mackenzie K. Keith
JMJoseph F. Mangano
Joseph F. Mangano
JWJ. Rose Wallick
J. Rose Wallick