Hua Jiang

Hua Jiang

Auto-generated profile, based on publicly available information

Hua Jiang

Beijing Key Laboratory of Municipal Infrastructure Modelling and Resilience Enhancement, China University of Mining and Technology Beijing, Beijing, China

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 February 2024 in Deep Underground Science and Engineering
Verified
Journal Article
Open access
HJHua Jiang
Hua Jiang
HZHandong Zhang
Handong Zhang
XZxiaoyan zhang
xiaoyan zhang
JZJinxun Zhang
Jinxun Zhang
YJYusheng Jiang
Yusheng Jiang
Excavation gaps around the front shield can be generated during shield construction, resulting in significant ground settlement. Traditional synchronous grouting slurries are unsuitable for filling these gaps during tunneling under existing subway lines. To address this issue, experiments are conducted on mix characteristics and hardening properties of slurries with variations in fineness and contents of fly ash. The experimental and computed tomography scan results yield the following findings: (1) fly ash with high fineness can effectively reduce the early strength of slurries and enhance their injectability. This improves the filling effect on micropores in the slurry and ultimately enhances the final hardening strength. (2) Fineness of fly ash controls the process of slurry hydration. The higher the fineness of fly ash, the more visible the exothermic hydration of slurry and the earlier the highest temperature peak appears. (3) Fly ash with high fineness can effectively increase the density and consolidation rate of slurries, resulting in greater improvement in slurry strength, particularly when the ratio of fly ash to cement (mf/mc) is 0.75. (4) Fly ash with high fineness can effectively decrease the likelihood of appearance of pores in the slurry, optimize the pore structure, and enhance the strength of slurries after consolidation.

1 January 2021 in Shock and Vibration
Verified
Journal Article
Open access
PDF file
BHBao-Jiang Han
Bao-Jiang Han
YJYu-Sheng Jiang
Yu-Sheng Jiang
ZWZihao Wang
Zihao Wang
DGdaqing gong
daqing gong
HJHua Jiang
Hua Jiang
PJPing-Lin Jiang
Ping-Lin Jiang
Under the background of China’s continuous promotion of urbanization, urban underground integrated pipeline corridor has become an inevitable trend of future urban integrated management. After the completion of the pipeline corridor, how to effectively manage its risks in operation and maintenance management has become a topic at this stage. In this paper, through the combination of the classical AHP method and DSM method, based on a large number of literature studies, the risk relationship system of the integrated pipe corridor is constructed. AnyLogic software is applied to simulate the system dynamics, analyze the impact of dynamic changes of each risk factor on the risk accident of the integrated pipe corridor, carry out uncertainty reasoning from multiple perspectives, and realize the evaluation and analysis of the accident risk of the integrated pipe corridor. The results of the study could provide targeted support tools for integrated pipeline corridor risk operation and maintenance management.

1 January 2021 in Journal of Mechanical Engineering
Verified
Journal Article
Closed access
PDF file
江华江华,张晋勋,苏一冉,张靖翎,殷明伦,朱家辰
江华,张晋勋,苏一冉,张靖翎,殷明伦,朱家辰
ZHZhang Jinxun Jiang Hua
Zhang Jinxun Jiang Hua

30 August 2020 in Shock and Vibration
Verified
Journal Article
Open access
PDF file
PJPing-Lin Jiang
Ping-Lin Jiang
HJHua Jiang
Hua Jiang
TYTian-Yi Yu
Tian-Yi Yu
TSTian-Yu Sun
Tian-Yu Sun
LZLei Zhang
Lei Zhang
By using the harmonic response analysis in the finite element analysis method, the seismic dynamic interaction of the three-dimensional urban building group-homogeneous sedimentary basin is studied. The viscoelastic artificial boundary is introduced, which can overcome both the defects of low-frequency drift and high-frequency instability, and the equivalent load in frequency domain is obtained by fast Fourier transform for loading, to explore the influence of the different incident frequencies (0.5–5.0 Hz), different numbers (196, 400, 676), and spacing (55 m, 62.5 m, 70 m) of building groups on the ground motion of homogeneous sedimentary basin under the incidence of SV wave. Numerical results illustrate that at low frequency, the displacement cloud image of the homogeneous sedimentary basin model shows an obvious phenomenon of “central focusing.” With the increase of frequency, the displacement cloud image gradually changes from “central focusing” to “multipoint focusing.” Meanwhile, the displacement peak gradually moves from the surface to the center of the basin. At a certain incident frequency, the existence of dense building groups will change the spatial distribution of displacement amplitude in the basin. Under the action of high-frequency incident waves, denser building groups with more buildings and smaller building spacing have a more pronounced weakening effect on the seismic response of homogeneous sedimentary basins. The displacement response of the center of the basin is generally large. When planning important buildings, the center area should be avoided as much as possible. For existing buildings, structural reinforcement is needed. It is of great significance for the planning and layout of buildings in the soft sedimentary basin and the reasonable spacing of buildings to reduce the risk of urban earthquake disaster.

31 August 2022 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
CLChenglong Liu
Chenglong Liu
SYShaoyu Yang
Shaoyu Yang
WLWeijing Liu
Weijing Liu
ZWZhenyong Wang
Zhenyong Wang
YJYusheng Jiang
Yusheng Jiang
HJHua Jiang
Hua Jiang
In order to effectively control the ground deformation and ground subsidence during subway construction, three-dimensional numerical simulation of soil deformation during shield tunnel construction is proposed. Based on a subway tunnel project, this essay firstly divides the shield construction process into several stages and analyzes the vertical displacement of soil in each stage. FLAC 3D was used for three-dimensional finite difference numerical simulation. By comparing the numerical simulation results with the field measured data, the soil settlement caused by shield tunnel excavation is studied deeply. The simulation results show that the maximum settlement value of the monitoring data is 0.59mm, and the maximum settlement value of the numerical simulation is 0.82mm, with a difference of 0.23mm. The maximum value of uplift on both sides of the tunnel is 0.41mm in monitoring data and 0.29 in numerical simulation, with a difference of 0.12mm. The maximum settlement value of monitoring data is 2.59mm, and the maximum settlement value of numerical simulation is 3.05mm, with a difference of 0.46mm. The maximum value of uplift on both sides of the tunnel is 0.32mm in monitoring data and 1.89mm in numerical simulation, with a difference of 1.57mm. The settlement value of numerical simulation is slightly larger than that of monitoring data. Conclusion. The simulation can well simulate the state of soil uplift on both sides, and the width of settlement groove is in good agreement with the monitoring data.

26 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
ZJZhang Jiaqi
Zhang Jiaqi
HJHua Jiang
Hua Jiang
JWJinsen Wang
Jinsen Wang
JFJili Feng
Jili Feng
Surface settlement prediction is crucial to assess the safety of subway station construction. To overcome challenges such as missing on-site settlement data and a limited number of monitoring points, this study proposes a composite prediction model that integrates finite element analysis, a time-series interval GA-BP neural network, and variational mode decomposition (VMD) techniques. Using the Dongba-zhongjie Station in Beijing Subway Line 3 as a case study, surface settlement predictions were made for both typical monitoring points and randomly selected feature points throughout the construction period, followed by validation. The experimental results show that the root mean square error (RMSE) of the finite element model is 15.77%, confirming the model’s effectiveness. As excavation progressed through the second underground floor and bottom plate, the settlement at the maximum settlement point began to rebound, and the structure tended to stabilize. At this stage, construction of the comprehensive utility tunnel above the station can proceed concurrently.