Wentao Zhou

Wentao Zhou

Auto-generated profile, based on publicly available information

Wentao Zhou

Schlumberger

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 October 2023 in Journal of Food Engineering
Verified
Journal Article
Closed access
WZWentao Zhou
Wentao Zhou
Shuhao LiuShuhao Liu
Shuhao Liu
WDWilliam DeFlorio
William DeFlorio
SSSang Ha Song
Sang Ha Song
HCHayoung Choi
Hayoung Choi
Mustafa AkbulutMustafa Akbulut
Mustafa Akbulut

18 February 2016 in SPE Journal
Verified
Journal Article
Closed access
PDF file
WZWentao Zhou
Wentao Zhou
RBRaj Banerjee
Raj Banerjee
EPEduardo Proano
Eduardo Proano
Summary: Nodal analysis is the standard technique used to evaluate the performance of integrated production systems. Two curves represent the capacities of the inflow and of the outflow, and the intersection of the two curves gives the solution operating point. Limitations of traditional nodal analysis include: Results are offered only at a snapshot, not as a function of time. Inflow-performance-relationship (IPR) models are limited, with none available for shale gas wells. Analysis is performed on a well-by-well basis, with no account of multiwell interference. We propose a new nodal-analysis method that enables the study of transient production systems, such as unconventional reservoirs, with IPR models generated from a high-speed semianalytical reservoir simulator and outflow curves generated from a steady-state pipeline simulator. The use of analytical reservoir simulation allows accurate, reliable modeling of the real inflow system. The new approach studies the time-lapse behavior of the system, with consideration of production history and neighboring-well interference. This new method enables the study of transient deliverability at the wellhead, where the measurement is usually available, and shows the time-lapse relationship between wellhead pressure and production rate. We provide examples of wellhead deliverability and choke management and explain advantages of the method with case studies involving tight and shale wells. The method is also applied to design and optimize artificial lift in unconventional wells and to study the method's validity over time. In addition, we discuss an example of operational well dynamics with time-lapse nodal analysis. Furthermore, this new method generates discussion about some concepts that are often taken for granted—What should be the definition of IPR in a transient production system? On the IPR curve, is the zero-rate-pressure the reservoir pressure? Can IPR curves at two different timesteps cross each other? Finding the answers to these questions will help us better understand production systems. The commonly used productivity-index (PI) method is reviewed and compared with the new method. Results show that one should not use the PI method when well operational conditions change.

30 September 2024 in Surfaces and Interfaces
Verified
Journal Article
Closed access
YAYashwanth Arcot
Yashwanth Arcot
MMMinchen Mu
Minchen Mu
MIMonica Iepure
Monica Iepure
RYRae Karell Yodong
Rae Karell Yodong
WZWentao Zhou
Wentao Zhou
Mustafa AkbulutMustafa Akbulut
Mustafa Akbulut


12 December 2023 in Surfaces and Interfaces
Verified
Journal Article
Closed access
MMMinchen Mu
Minchen Mu
JOJun Kyun Oh
Jun Kyun Oh
KPKeila Perez-Lewis
Keila Perez-Lewis
WZWentao Zhou
Wentao Zhou
XWXunhao Wang
Xunhao Wang
Mustafa AkbulutMustafa Akbulut
Mustafa Akbulut

1 January 2015
Verified
Conference Paper
Closed access
PTPeter Tilke
Peter Tilke
WZWentao Zhou
Wentao Zhou
WANG YINLIWANG YINLI
WANG YINLI
SKShalini Krishnamurthy
Shalini Krishnamurthy
MBMahesh Bhanushali
Mahesh Bhanushali
MTMichael Thambynayagam
Michael Thambynayagam