Veronica Dal Sasso

Veronica Dal Sasso

Auto-generated profile, based on publicly available information

Veronica Dal Sasso

OptRail, Rome 00154, Italy

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2019 in European Journal of Operational Research
Verified
Journal Article
Closed access
VSVeronica Dal Sasso
Veronica Dal Sasso
FFFranklin Djeumou Fomeni
Franklin Djeumou Fomeni
GLGuglielmo Lulli
Guglielmo Lulli
KZKonstantinos G. Zografos
Konstantinos G. Zografos

1 November 2018 in Transportation Research Part B: Methodological
Verified
Journal Article
Closed access
VSVeronica Dal Sasso
Veronica Dal Sasso
FFFranklin Djeumou Fomeni
Franklin Djeumou Fomeni
GLGuglielmo Lulli
Guglielmo Lulli
KZKonstantinos G. Zografos
Konstantinos G. Zografos

1 July 2022 in Transportation Science
Verified
Journal Article
Closed access
ACAnna Livia Croella
Anna Livia Croella
VSVeronica Dal Sasso
Veronica Dal Sasso
LLLeonardo Lamorgese
Leonardo Lamorgese
CMCarlo Mannino
Carlo Mannino
PVPaolo Ventura
Paolo Ventura
When major disruptions occur in a rail network, the infrastructure manager and train operating companies may be forced to stop trains until the normal status is recovered. A crucial aspect is to identify, for each train, a location (a safe place) where the train can hold during the disruption, avoiding to disconnect the network and allowing a quick recovering of the plan, at restart. We give necessary and sufficient conditions for a safe place assignment to have the desired property. We then translate such conditions into constraints of a suitable binary formulation of the problem. Computational results on a set of instances provided by a class 1 U.S. railroad show how the approach can be used effectively in the real-life setting that motivates the study, by returning optimal assignments in a fraction of a second.

1 July 2022 in Operations Research
Verified
Journal Article
Closed access
VSVeronica Dal Sasso
Veronica Dal Sasso
LLLeonardo Lamorgese
Leonardo Lamorgese
CMCarlo Mannino
Carlo Mannino
ATAntonio Tancredi
Antonio Tancredi
PVPaolo Ventura
Paolo Ventura
In a railway network, a deadlock occurs when two or more trains are preventing each other from moving forward by each occupying the tracks required by the other. Deadlocks are rare but pernicious events in railroad operations, and, in most cases, they are caused by human errors and involve only two extra-long trains missing their last potential meet location. In “Easy Cases of Deadlock Detection in Train Scheduling,” V. Dal Sasso, L. Lamorgese C. Mannino, A. Tancredi, and P. Ventura prove that the identification of two-train deadlocks can be performed in polynomial time. Moreover, they also present a pseudo-polynomial but efficient oracle that allows real-time early detection and prevention of any (potential) two-train deadlock in the Union Pacific (a U.S. class 1 rail company) railroad network. A deadlock prevention module based on the work in this paper will be put in place at Union Pacific to prevent all deadlocks of this kind.

1 March 2021 in Journal of Rail Transport Planning & Management
Verified
Journal Article
Closed access
VSVeronica Dal Sasso
Veronica Dal Sasso
LLLeonardo Lamorgese
Leonardo Lamorgese
CMCarlo Mannino
Carlo Mannino
AOAndrea Onofri
Andrea Onofri
PVPaolo Ventura
Paolo Ventura

1 September 2019 in Transportation Science
Verified
Journal Article
Closed access
VSVeronica Dal Sasso
Veronica Dal Sasso
LGLuigi De Giovanni
Luigi De Giovanni
MLMartine Labbé
Martine Labbé
The delay management problem arises in public transportation networks, often characterized by the necessity of connections between different vehicles. The attractiveness of public transportation networks is strongly related to the reliability of connections, which can be missed when delays or other unpredictable events occur. Given a single initial delay at one node of the network, the delay management problem is to determine which vehicles have to wait for the delayed ones, with the aim of minimizing the dissatisfaction of the passengers. In this paper, we present strengthened mixed integer linear programming formulations and new families of valid inequalities. The implementation of branch-and-cut methods and tests on a benchmark of instances taken from real networks show the potential of the proposed formulations and cuts.