Pejman Ghasemi Poor Sabet

Pejman Ghasemi Poor Sabet

Auto-generated profile, based on publicly available information

Pejman Ghasemi Poor Sabet

Stott's College, 168 Exhibition Street, Melbourne, Victoria 3000, Australia

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 June 2019 in International Journal of Managing Projects in Business
Verified
Journal Article
Open access
PSPejman Ghasemi Poor Sabet
Pejman Ghasemi Poor Sabet
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
Purpose: New methods have been introduced as revolutionary approaches in the construction industry, such as off-site manufacturing (OSM) and building information modelling (BIM). Although these approaches can provide many benefits, there are still barriers to meeting the expectations of improved construction productivity via their implementation. Hence, the purpose of this paper is to critically review the capabilities of OSM and BIM techniques, as well as their potential interactions, in productivity improvement.Design/methodology/approach: A scoping review approach was adopted, where 100 peer-reviewed journal articles were collected to analyse the capabilities of OSM and BIM, as well as their potential interactions, in productivity improvement as assessed by key productivity indicators (KPrIs).Findings: The results reveal seven BIM-based capabilities and six OSM-based capabilities, as well as 12 potential OSM–BIM interactions that have significant potential for satisfying KPrIs.Originality/value: An integrated framework has also been developed to clarify and conceptualise the roles of OSM–BIM interactions in their designated KPrIs. The research has developed insightful and practical references for strategic planning and management in OSM–BIM-based projects.

11 July 2022 in Expert Systems with Applications
Verified
Journal Article
Closed access
Saeed Reza MohandesSaeed Reza Mohandes
Saeed Reza Mohandes
AKAli Karasan
Ali Karasan
MEMelike Erdoğan
Melike Erdoğan
PSPejman Ghasemi Poor Sabet
Pejman Ghasemi Poor Sabet
Amir MahdiyarAmir Mahdiyar
Amir Mahdiyar
Tarek ZayedTarek Zayed
Tarek Zayed

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
PSPejman Ghasemi Poor Sabet
Pejman Ghasemi Poor Sabet
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
Reinventing construction is the key to improving productivity. This reinvention refers to not only inventing advanced materials and equipment but also developing new operating systems for construction projects. Inadequate application of advanced techniques impedes the operating system. Furthermore, the capabilities of advanced techniques may not cover all the areas required to meet the expected productivity level. The implications of these advanced techniques need to be reinforced by a range of productive fundamentals that remain unclarified. Further, the pathways through which these fundamentals can be aligned with the implementation of advanced techniques remain under‐researched. Hence, the objectives of this research are as follows: (1) to clarify how the selected and common advanced techniques applied in this paper influence construction productivity; (2) to determine the range of productivity fundamentals required to reinforce the implementation of the advanced techniques necessary to fulfil productivity expectations; and (3) to conceptualise the integration of these productivity fundamentals with the application of advanced techniques. A scoping review of 128 articles was used to identify which fundamentals can contribute to achieving performance targets once practising these new advanced techniques. The findings reveal a comprehensive range of productivity fundamentals that are able to reinforce new advanced techniques through different pathways of their applications.