Rafael Sacks

Rafael Sacks

Auto-generated profile, based on publicly available information

Rafael Sacks

Technion Israel Institute of Technology

Research Focus & Metrics

Academic Career Length

32Years (1995-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 February 2008
Verified
Book
Open access
CEChuck Eastman
Chuck Eastman
PTPaul Teicholz
Paul Teicholz
RSRafael Sacks
Rafael Sacks
KLKathleen Liston
Kathleen Liston
Click on the title to browse this book

26 September 2013 in Construction Management and Economics
Verified
Journal Article
Closed access
RSRafael Sacks
Rafael Sacks
APAmotz Perlman
Amotz Perlman
RBRonen Barak
Ronen Barak
Construction workers’ ability to identify and assess risks is acquired through training and experience and is among the key factors that determine their behaviour and thus their safety. Yet researchers have questioned the effectiveness of conventional safety training. This research tested the hypotheses that safety training in a virtual reality (VR) construction site would be feasible and more effective, in terms of workers’ learning and recall in identifying and assessing construction safety risks, than would equivalent training using conventional methods. Sixty-six subjects were provided training in construction safety and their safety knowledge was tested prior to the training, immediately afterward, and one month later. Half of the subjects received traditional classroom training with visual aids; the other half were trained using a 3D immersive VR power-wall. Significant advantage was found for VR training for stone cladding work and for cast-in-situ concrete work, but not for general site safety. VR training was more effective in terms of maintaining trainees’ attention and concentration. Training with VR was more effective over time, especially in the context of cast-in-situ concrete works. Given the need for improved training and the advantages of training using VR, incorporation of VR in construction safety training is strongly recommended.

27 November 2020 in Data-Centric Engineering
Verified
Journal Article
Open access
PDF file
RSRafael Sacks
Rafael Sacks
IBIoannis Brilakis
Ioannis Brilakis
EPErgo Pikas
Ergo Pikas
HXHaiyan Sally Xie
Haiyan Sally Xie
MGMark Girolami
Mark Girolami
The concept of a “digital twin” as a model for data-driven management and control of physical systems has emerged over the past decade in the domains of manufacturing, production, and operations. In the context of buildings and civil infrastructure, the notion of a digital twin remains ill-defined, with little or no consensus among researchers and practitioners of the ways in which digital twin processes and data-centric technologies can support design and construction. This paper builds on existing concepts of Building Information Modeling (BIM), lean project production systems, automated data acquisition from construction sites and supply chains, and artificial intelligence to formulate a mode of construction that applies digital twin information systems to achieve closed loop control systems. It contributes a set of four core information and control concepts for digital twin construction (DTC), which define the dimensions of the conceptual space for the information used in DTC workflows. Working from the core concepts, we propose a DTC information system workflow—including information stores, information processing functions, and monitoring technologies—according to three concentric control workflow cycles. DTC should be viewed as a comprehensive mode of construction that prioritizes closing the control loops rather than an extension of BIM tools integrated with sensing and monitoring technologies.

1 September 2010 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
RSRafael Sacks
Rafael Sacks
Lauri KoskelaLauri Koskela
Lauri Koskela
BDBhargav Dave
Bhargav Dave
RORobert Owen
Robert Owen
Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recogn...

1 April 2014 in Safety Science
Verified
Journal Article
Closed access
APAmotz Perlman
Amotz Perlman
RSRafael Sacks
Rafael Sacks
RBRonen Barak
Ronen Barak

1 April 2010 in Safety Science
Verified
Journal Article
Closed access
OROphir Rozenfeld
Ophir Rozenfeld
RSRafael Sacks
Rafael Sacks
YRYehiel Rosenfeld
Yehiel Rosenfeld
HBHadassa Baum
Hadassa Baum