Tom Feehally

Tom Feehally

Auto-generated profile, based on publicly available information

Tom Feehally

University of Bath, Bath, UK

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 June 2016 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
TFTom Feehally
Tom Feehally
IDInaki Erazo Damian
Inaki Erazo Damian
JAJudith M. Apsley
Judith M. Apsley
The supply of electrical power is usually achieved by a generator driven from a prime mover by some form of mechanical drivetrain. Such an electromechanical system will have natural resonant modes in both the electrical and mechanical subsystems. The electrical generator provides a coupling between the subsystems, transferring not only useful power, but also disturbances between the electrical and mechanical domains. These disturbances may excite resonances resulting in cross-domain (electromechanical) interaction. This can lead to lifetime reduction in the mechanical components and instability in the electrical network, resulting in poor reliability for the wider system and potentially catastrophic component failure. Electromechanical interaction is particularly critical in power generation systems onboard aircraft, because the generator is driven by a gas turbine via an inherently low-stiffness drive train. It is then critical to identify electromechanical interaction at the design stage so that these issues can be avoided. However, predicting the occurrence of interaction through simulation is challenging, requiring multidomain models operating with different time scales. This paper analyzes an aircraft auxiliary power offtake to produce a reduced-order mechanical drivetrain model, allowing the modal frequencies to be predicted and cross-domain interactions to be modeled. A purpose-built electromechanical test platform is used to validate the model and demonstrate how electrical disturbances are passed through the generator to the mechanical system and affect the electrical network. Future research will use the test bed to demonstrate strategies for avoiding or suppressing unwanted interactions.

17 February 2022 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Open access
JXJiawen Xi
Jiawen Xi
XPXiaoze Pei
Xiaoze Pei
LNLiyong Niu
Liyong Niu
TFTom Feehally
Tom Feehally
PWPeter Wilson
Peter Wilson
XZXianwu Zeng
Xianwu Zeng

25 July 2024 in Journal of Intelligent Material Systems and Structures
Verified
Journal Article
Open access
NSNathan P. Sell
Nathan P. Sell
TFTom Feehally
Tom Feehally
APAndrew Plummer
Andrew Plummer
PWPeter Wilson
Peter Wilson
JBJonathan du Bois
Jonathan du Bois
TLTom Love
Tom Love
Traditional valve-controlled hydraulic cylinders are usually very inefficient due to power loss through the control valve. An efficient alternative architecture is to distribute power electrically rather than hydraulically to a group of cylinders and drive each cylinder via individual servomotor-driven pumps. This arrangement is called electrohydrostatic actuation. Such actuators are currently available for power ratings of several hundred watts or greater, but not in the sub-100 W range. This paper details the design, simulation and testing of a piezopump which is intended to address this gap. The motivation is for aerospace applications, and in particular accessory actuators used in the landing gear system. The 10–100 W range is a high-power output for a piezopump, and to achieve this a novel design using disc-style reed valves was developed to allow pumping frequencies above 1 kHz. These high frequencies necessitated the development of custom power electronics capable of delivering 950 V peak-peak sine wave excitation to a largely capacitive load. Experimental results show that the piezopump is capable of delivering over 30 W of hydraulic power, and at no-load can deliver up to 2 L/min of flow at 1250 Hz. Future development includes a transition to multi-cylinder pumps, and improved reed-valve modelling to improve the accuracy of simulated performance.

1 June 2019
Verified
Conference Paper
Closed access
RTRebecca Todd
Rebecca Todd
Alessandro Massi PavanAlessandro Massi Pavan
Alessandro Massi Pavan
TFTom Feehally
Tom Feehally
AFAndrew Forsyth
Andrew Forsyth
SNShahab Nejad
Shahab Nejad
MFMartin Foster
Martin Foster
Commanding multiple energy storage systems (ESSs) to provide grid balancing services is a popular approach to manage the finite state-of-charge (SoC) of each asset. The communication between the individual assets can be a challenge due to their distribution throughout the land-based power network. Two battery-based ESS, a 240 kW 180 kWh lithium ion polymer (nickel manganese cobalt oxide (NMC)) based system located behind-the-meter on a 400 V power network, and a 2 MW 1 MWh lithium-titanate system, which is located at an 11 kV residential substation, are located 100 km apart. Their performance when delivering grid support services using simple time or frequency synchronised coordinated dispatch methods is evaluated in this research. Experimental results from the real and reactive power step profiles show both energy storage systems (ESSs) are correctly time dispatched, and operate according to the power profile. In the real power test, the 2 MW ESS had a larger SoC change at the end of the discharge period when compared to the 240 kW system, due to its higher power to energy ratio. The reactive power test demonstrated that both systems were able to influence their local voltage. The dynamic demand response profile shows the successful use of frequency to determine the dispatch, and both ESSs delivered or absorbed the correct real power for the frequency deviation, while achieving a 100% service performance measure.