Manhong Liao

Manhong Liao

Auto-generated profile, based on publicly available information

Manhong Liao

Sichuan Digital Transportation TECH Co., Ltd., Chengdu 610041, China

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 August 2025 in Infrastructures
Verified
Journal Article
Open access
PDF file
MLManhong Liao
Manhong Liao
KWKai Wang
Kai Wang
XZXin Zhou
Xin Zhou
LTLiang Tian
Liang Tian
JWJunxin Wang
Junxin Wang
EYEnhui Yang
Enhui Yang
There is currently no mature calculation theory to accurately predict the settlement of high-fill subgrade. This paper developed an intelligent monitoring system to accurately predict the settlement of high-fill subgrade based on on-site experiments, and the back-propagation (BP) neural network model was used to predict the settlement of high-fill subgrade. The results show that multiple data preprocessing methods built into intelligent systems can automatically generate multi-point and correlation curves, and the system can identify and distinguish various influencing factors to improve the accuracy and reliability of monitoring data. There will be a certain initial settlement of subgrade in the initial stage after filling construction is completed, and the settlement rate at this stage is relatively fast. Afterwards, the soil enters a rapid consolidation stage, and the settlement rate of subgrade gradually slows down. Finally, the filling soil consolidation becomes stable, and the rate of subgrade settlement enters a relatively stable stage. In addition, the BP neural network model is a good method for predicting the settlement of high-fill subgrade. The research findings can provide inspiration for developing an intelligent monitoring system to accurately predict the settlement of high-fill subgrade.