R. Edward MinchinJr.

R. Edward MinchinJr.

Auto-generated profile, based on publicly available information

R. Edward MinchinJr.

Univ. of Florida

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2007 in Journal of Management in Engineering
Verified
Journal Article
Closed access
MEMohammad S. El-Mashaleh
Mohammad S. El-Mashaleh
RMR. Edward Minchin
R. Edward Minchin
WOWilliam J. O’bRien
William J. O’bRien
In today’s highly competitive construction industry, there is a critical need for managers to continuously improve their firm’s efficiency and effectiveness. More specifically, managers need to know which performance measures are most critical in determining their firm’s overall success. Benchmarking, when done properly, can accurately identify both successful companies and the underlying reasons for their success. However, rigorous benchmarking within the construction industry still remains an embryonic field. This paper analyzes and critiques both the performance measures and metrics used traditionally in the construction industry and the benchmarking models developed to date for the industry. Based on the results of this analysis, benchmarking models using data envelope analysis are proposed that offer significant improvements over current models. The proposed models measure construction firm performance on a company-wide basis, foster trade-off analyses among various performance metrics, and tie the r...

1 October 2013 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
RMR. Edward Minchin
R. Edward Minchin
XLXiaoxiao Li
Xiaoxiao Li
RIRaja R. Issa
Raja R. Issa
GVGary G. Vargas
Gary G. Vargas
The choice of construction delivery system is one of the most important decisions that a public highway agency will make with regard to a highway, bridge, or transit construction project. Although several research projects have been conducted on the subject of comparing costs and project duration, there has been no study that statistically analyzes these factors specifically for transportation projects, much less one that eliminates the largest variable of all: different public agencies. The objective of the research reported in this paper was to determine which of two delivery methods, design-bid-build (DBB) and design-build (DB), delivers highway and bridge construction projects at the lowest cost and in the shortest time period, and to back up the findings with a rigorous statistical analysis of the data. Data were taken from the databases of the Florida Department of Transportation (FDOT) and arithmetically and statistically compared through Levene’s test, the independent samples t-test, the W...

1 May 2006 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MEMohammad El-Mashaleh
Mohammad El-Mashaleh
WOWilliam J. O’bRien
William J. O’bRien
RMR. Edward Minchin
R. Edward Minchin
This paper, which is written to both researchers and practitioners, examines the impact of information technology (IT) on construction firm performance. Based on data collected from 74 construction firms, regression analysis is used to test the relationship between performance and IT. Analysis provides empirical evidence that IT is positively associated with firm performance, schedule performance, and cost performance. Firm performance is a composite score of several metrics of performance: schedule performance, cost performance, customer satisfaction, safety performance, and profit. The regression analysis shows that for every 1 unit increase in IT utilization, there is an increase of about 2, 5, and 3% in firm performance, schedule performance, and cost performance, respectively. No relationship is found between IT use and customer satisfaction, safety performance, and profitability.

1 February 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Dan TranDan Tran
Dan Tran
GDGuru Diraviam
Guru Diraviam
RMR. Edward Minchin
R. Edward Minchin
The design-build (D-B) project delivery method has been used increasingly by state departments of transportation (DOTs) because of its documented benefits. Many studies have shown the superior performance of D-B projects when compared to traditional design-bid-build (D-B-B) projects. However, these studies often rely on experts’ judgments or small sample sizes based on data collected from surveys, interviews, or case studies. There are few, if any, empirical studies that have compared D-B-B and D-B highway project performance by work types. This research analyzed 139 pairs of D-B-B and D-B highway projects built by the Florida DOT. The 139 pairs of projects were classified into five categories of work types: (1) new construction; (2) reconstruction; (3) resurfacing, restoration, rehabilitation (3R) projects; (4) intelligent transportation systems (ITS)–related projects; and (5) miscellaneous construction such as sidewalks, bike lanes, or landscaping. The study employed both parametric and nonparametric statistical tests to compare cost growth, schedule growth, and construction intensity metrics across the five project work types. The results show that D-B projects statistically perform better than D-B-B in terms of cost growth and schedule growth for miscellaneous construction and 3R project work types, respectively. Design-build projects also statistically provide a higher construction intensity (more work put in place) than D-B-B for new construction and reconstruction work types. No statistically significant differences between D-B-B and D-B projects were found for other project work types. This study contributes to the construction engineering and management body of knowledge by providing empirical comparisons between D-B-B and D-B project performance on the basis of different types of work. The findings from this paper may provide guidance for state DOTs and practitioners to select D-B project delivery for specific work types and benchmarks D-B against D-B-B.

1 October 2017 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Yuanxin ZhangYuanxin Zhang
Yuanxin Zhang
RMR. Edward Minchin
R. Edward Minchin
DADuzgun Agdas
Duzgun Agdas
Finishing highway projects within budget is critical for state highway agencies (SHAs) because budget overruns can result in severe damage to their reputation and credibility. Cost overruns in highway projects have plagued public agencies globally. Hence, this research aims to develop a parametric cost estimation model for SHAs to forecast the completed project cost prior to project execution to take necessary measures to prevent cost escalation. Ordinary least-square (OLS) regression has been a commonly used parametric estimation method in the literature. However, OLS regression has certain limitations. It, for instance, requires strict statistical assumptions. This paper proposes an alternative approach—least absolute shrinkage and selection operator (LASSO)—that has proved in other fields of research to be significantly better than the OLS method in many respects, including automatic feature selection, the ability to handle highly correlated data, ease of interpretability, and numerical stability of the model predictions. Another contribution to the body of knowledge is that this study simultaneously explores project-related variables with some economic factors that have not been used in previous research, but economic conditions are widely considered to be influential on highway construction costs. The data were separated into two groups: one for training the model and the other for validation purposes. Using the same data set, both LASSO and OLS were used to build models, and then their performance was evaluated based on the mean absolute error, mean absolute percentage error, and root-mean-square error. The results showed that the LASSO regression model outperformed the OLS regression model based on the criteria.

1 January 2005 in Journal of Management in Engineering
Verified
Journal Article
Closed access
RMR. Edward Minchin
R. Edward Minchin
GSGary R. Smith
Gary R. Smith
A quality contractor on every construction project would make project management simpler for Department of Transportation (DOT) project engineers and strategic planning more accurate for DOT executives. A qualification model that includes the quality of a contractor’s past work would be invaluable in assuring that each project had a quality contractor. Including the quality of past work in the bidding process would further help in this goal. Implementation of such a model for both its potential uses would require business process reengineering for the DOT in two important areas: qualification of contractors and contract award procedures. The research team has produced an innovative model, called the Quality-Based Performance Rating (QBPR) system. This model receives inputs from traditional subjective sources and integrates them with totally objective data input from the results of tests of the project’s materials and workmanship, then uses these inputs to produce a score for each project that is further u...