François-Xavier Faÿ

François-Xavier Faÿ

Auto-generated profile, based on publicly available information

François-Xavier Faÿ

Energy and Environment Division, Tecnalia, 48160 Derio, Spain

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2016 in Renewable Energy
Verified
Journal Article
Closed access
João C. C. HenriquesJoão C. C. Henriques
João C. C. Henriques
Luis GatoLuis Gato
Luis Gato
AFA.F.O. Falcão
A.F.O. Falcão
ERE. Robles
E. Robles
FFF.-X. Faÿ
F.-X. Faÿ

1 November 2016 in Renewable Energy
Verified
Journal Article
Closed access
José Manuel GasparJosé Manuel Gaspar
José Manuel Gaspar
MKMojtaba Kamarlouei
Mojtaba Kamarlouei
ASAshank Sinha
Ashank Sinha
Haitong XuHaitong Xu
Haitong Xu
MCMiguel Calvário
Miguel Calvário
Carlos Guedes SoaresCarlos Guedes Soares
Carlos Guedes Soares

1 February 2020 in Renewable Energy
Verified
Journal Article
Open access
FFFrançois-Xavier Faÿ
François-Xavier Faÿ
EREider Robles
Eider Robles
MMMarga Marcos
Marga Marcos
EAEndika Aldaiturriaga
Endika Aldaiturriaga
ECEduardo F. Camacho
Eduardo F. Camacho

6 November 2015 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
RCRobert J. Cavagnaro
Robert J. Cavagnaro
JNJason C. Neely
Jason C. Neely
FFFranois-Xavier Fay
Franois-Xavier Fay
JMJoseba Lopez Mendia
Joseba Lopez Mendia
JRJudith A. Rea
Judith A. Rea
Implications of conducting hardware-in-the-loop testing of a specific hydrokinetic turbine on controllable motor-generator sets or electromechanical emulation machines (EEMs)are explored. The emulator control dynamic equations are presented, methods for scaling turbine parameters are developed and evaluated, and experimental results are presented from three EEMs programmed to emulate the same vertical-axis fixed-pitch turbine. Although hardware platforms and control implementations varied, results show that each EEM is successful in emulating the turbine model at different power levels, thus demonstrating the general feasibility of the approach. However, performance of motor control under torque command, current command, or speed command differed. In a demonstration of the intended use of an EEM for evaluating a hydrokinetic turbine implementation, a power takeoff controller tracks the maximum power-point of the turbine in response to turbulence. Utilizing realistic inflow conditions and control laws, the emulator dynamic speed response is shown to agree well at low frequencies with numerical simulation but to deviate at high frequencies.

15 May 2020 in Energies
Verified
Journal Article
Open access
PDF file
Nicola DelmonteNicola Delmonte
Nicola Delmonte
ESEider Robles Sestafe
Eider Robles Sestafe
Paolo CovaPaolo Cova
Paolo Cova
FGFrancesco Giuliani
Francesco Giuliani
FFFrançois Xavier Faÿ
François Xavier Faÿ
Luca MartinelliLuca Martinelli
Luca Martinelli
The aim of this work is to show that a significant increase of the efficiency of a Wave Energy Converter (WEC) can be achieved already at an early design stage, through the choice of a turbine and control regulation, by means of an accurate Wave-to-Wire (W2W) modeling that couples the hydrodynamic response calibrated in a wave flume to a Hardware-In-the-Loop (HIL) test bench with sizes and rates not matching those of the system under development. Information on this procedure is relevant to save time, because the acquisition, the installation, and the setup of a test rig are not quick and easy. Moreover, power electronics and electric machines to emulate turbines and electric generators matching the real systems are not low-cost equipment. The use of HIL is important in the development of WECs also because it allows the carrying out of tests in a controlled environment, and this is again time- and money-saving if compared to tests done on a real system installed at the sea. Furthermore, W2W modeling can be applied to several Power Take-Off (PTO) configurations to experiment different control strategies. The method here proposed, concerning a specific HIL for testing power electronics and control laws for a specific WECs, may have a more general validity.

1 December 2015 in International Journal of Marine Energy
Verified
Journal Article
Closed access
SAS. Armstrong
S. Armstrong
JRJ. Rea
J. Rea
FFF.-X. Faÿ
F.-X. Faÿ
ESEider Robles Sestafe
Eider Robles Sestafe