Nanang Hariyanto

Nanang Hariyanto

Auto-generated profile, based on publicly available information

Nanang Hariyanto

School of Electrical Engineering and Informatics, Institut Teknologi Bandung, Bandung, Indonesia

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 December 2020
Verified
Conference Paper
Closed access
MHMahardhika Michael Hamonangan
Mahardhika Michael Hamonangan
NHNanang Hariyanto
Nanang Hariyanto
Based on Electricity Supply Business Plan 2019– 2028, Indonesia targets energy mix of 23% for renewable energy. As Indonesia lies in equator line, the development of photovoltaic (PV) is promising in the future. The utilization of PV can be implemented by installing rooftop PV as it can supply electricity independently. Due to the falling price of PV, the user of rooftop PV is predicted to rise significantly. This paper aims to forecast rooftop PV installment in Indonesia from 2020 to 2030. Firstly, the savings bill if installing rooftop PV is calculated. The higher the capacity of rooftop PV is installed, the higher the savings by customers will be made. Prediction of rooftop PV adoption is then calculated using Bass diffusion model. It uses the historical data from three years ago while considering the effect of PV falling price. As the price goes lower, the adoption of rooftop PV is faster each year. Because of the presence of rooftop PV in the system, the annual production of energy can be reduced as the users can generate their own electricity. Consequently, the total production cost can be lower, leading to generation cost change each year.

5 October 2021
Verified
Conference Paper
Closed access
KKKomaruddin Komaruddin
Komaruddin Komaruddin
SSSuwarno Suwarno
Suwarno Suwarno
NHNanang Hariyanto
Nanang Hariyanto
KBKevin Marojahan Banjar-Nahor
Kevin Marojahan Banjar-Nahor
By the Electric Vehicle penetration, there will be additional new loads on the customer service transformer side. This paper will discuss the impact of Electric Vehicle penetration on the peak load on the 100 KVA Residential Area Transformer and also offers three strategies for charging the Electric Vehicle battery to reduce the peak load on these transformers. In this study, the Residential Area Transformers will be penetrated by the Electric Vehicle loads in stages 5, 10, 15, 20, 25, 30 EVs. This article will observe the impact of the penetration on the peak load of the transformers. There is a quite high increase in the penetration of EVs of 15, 20, 25, and 30 EVs. With the penetration of 30 EVs, the peak load on the transformers will increase to 123.6 KVA. This means that the 30 EV penetration exceeds the 100 KVA Transformer Residential capacity limit. Of the three EV charging strategies tested, with sequences per group of 4, 3, and 2 EV, it has been found that the best charging strategy to reduce the peak load of the transformer by shifting the peak load to the valley is charging strategy 2 with sequencing per group of 2 EV. By implementing the charging strategy 2 with sequencing per 2 EV groups, the peak EV load on uncontrolled charging is reduced from 123.6 KVA to 66.03 KVA, and there is a decrease in peak load by 46.59 percent.

10 July 2024 in IEEE Open Access Journal of Power and Energy
Verified
Journal Article
Open access
BNBinhot P. Nababan
Binhot P. Nababan
KBKevin Marojahan Banjar-Nahor
Kevin Marojahan Banjar-Nahor
MMMusa Partahi Marbun
Musa Partahi Marbun
SSSuwarno Suwarno
Suwarno Suwarno
NHNanang Hariyanto
Nanang Hariyanto
This study focuses on analyzing switching transients in the upcoming 500 kV Java-Bali Connection (JBC) hybrid OHL and submarine cable project using DIgSILENT PowerFactory software, based on a realistic power system model. Distributed-parameter models with constant parameters of the Bergeron model are utilized. Analysis of the traveling wave effect on the line is conducted, and the integration time step based on the time of the traveling wave is carefully selected. Statistical distributions of energization are produced by varying the circuit configuration and system short-circuit power. It is found that the Switching Withstand Voltage (SWV) during the energization process remain below 1175 kV. The probability distribution is fitted to a normal distribution, with the skewness and kurtosis shown to be skewed to the right and having a lower peak than that of the normal distribution, respectively. When a three-phase short-circuit at the line breaker is induced, the rate of rise of recovery voltage (RRRV) exceeds the IEC standard envelope if only one circuit is operating. In this contribution, switching analysis during no-load energization and de-energization in the planning stage of the mixed OHL-submarine cable is examined.

10 September 2025 in IEEE Access
Verified
Journal Article
Open access
NHNanang Hariyanto
Nanang Hariyanto
ASAnn Alberth Sitorus
Ann Alberth Sitorus
KBKevin Marojahan Banjar-Nahor
Kevin Marojahan Banjar-Nahor
HPHendry Timotiyas Paradongan
Hendry Timotiyas Paradongan
This article proposes a method for determining the optimal reclose scheme in power systems. The proposed approach involves analyzing multiple parameters such as the voltage and phase angle difference between bus, critical clearing time (CCT) of the systems, power surge of connected generators in the system, secondary arc duration in the systems, fault-induced delayed voltage recovery (FIDVR) phenomenon, and transient recovery voltage (TRV) in circuit breaker. Each parameter is assessed individually, and the results are compared with a matrix scoring system to determine the appropriate reclose scheme for each parameter. Subsequently, the reclose schemes derived from each parameter are integrated to identify the most effective reclose scheme for each segment of the system. This approach ensures that all relevant factors are considered in selecting a reclose scheme that optimally balances the system’s stability, reliability, and performance under various conditions. This methodology provides a more robust reclose scheme by considering a comprehensive set of factors, leading to enhanced the system stability and reliability. This study utilized DIgSILENT PowerFactory, providing a detailed examination of the Batam-Bintan transmission system. It is shown that the proposed method shortens the deadtime by 2 seconds in most single-phase reclosing schemes and 1 three-phase scheme, and mitigates the system instability risk on 3 three-phase reclosing schemes. The method presented serves as a valuable guide for determining optimal reclose schemes in both distribution and transmission systems, contributing to more effective fault recovery strategies and improved network performance.

20 July 2022
Verified
Conference Paper
Closed access
ISIndah Permata Sari
Indah Permata Sari
KNKevin Marojahan Banjar Nahor
Kevin Marojahan Banjar Nahor
NHNanang Hariyanto
Nanang Hariyanto
This study will be focused on efforts to increase the reliability of the Bangka Electricity System by designing the interconnection of the Bangka system with another system that is stronger and has a better energy mix, the Sumatra System. The novelty element in this research is the design of system protection using Special Protection System (SPS) as well as a different assessment method using the Fuzzy Technique This research will analyze the implementation of the SPS event-based and parameter-based as a new defense scheme by taking corrective actions to keep the system stable and reliable. These actions include tripping generators, loads, and reconfiguring the system automatically and quickly. The performance of this SPS will be tested on 10 contingency events with four different load profiles and the system response will be observed in terms of frequency stability, voltage, and rotor angle. From the research results, it can be concluded that the SPS performance on the Bangka-Sumatra Interconnection System has a better and more effective performance than the existing defense scheme, as evidenced by the results of dynamic security assessment (DSA) testing using Fuzzy Techniques.

2 February 2021
Verified
Conference Paper
Closed access
DWDheka Bakti Krisnamurti Winarno
Dheka Bakti Krisnamurti Winarno
NHNanang Hariyanto
Nanang Hariyanto
Setting values (parameter values) of equipment (motor, generator, transformer, bus, and line) and system protection coordinations are not optimal (selective) cause a not expected disturbance on an electrical power system. These problems can be seen on many distribution and transmission systems (20 and 70 kV) disturbances that caused circuit breakers of generator tripped, so power plants could not be operated island or house loads. The parameter value problems because there are not protection experts or can use a protection consultant to optimize the parameter values. However, by using the consultant will spend much money. Therefore, for accomplishing the parameter value problems can use an expert system application that works based on knowledgebases of the protection experts, so do not need to spend much money to pay the consultant. The application has to work automatically, so it can eliminate human errors and cost of the consultant. The parameter values will be changed automatically when there are protected equipment or system topology changes.