Vadym Pshyk

Vadym Pshyk

Auto-generated profile, based on publicly available information

Vadym Pshyk

National University “Yuri Kondratyuk Poltava Polytechnic

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 February 2025 in Eastern-European Journal of Enterprise Technologies
Verified
Journal Article
Open access
PDF file
VRVictoriia Rubel
Victoriia Rubel
VPVadym Pshyk
Vadym Pshyk
The object of this study is the process of fracture formation in the terrigenous reservoirs at the Rakytnyanske gas field, located in Ukraine in the Kharkiv oblast. The formation of fractures in the productive horizon has been investigated by designing hydraulic fracturing (HF), which is used to stimulate fluid inflow under the conditions of well #4. This method involves the use of innovative hydraulic fracturing fluids, which allows for the optimal geometry of the fractured formation, its sufficient conductivity and, ultimately, an increase in the well productivity. Hydraulic fracturing is one of the most effective methods for improving well production, especially in low-permeability and complex formations. This technology is widely used in the oil and gas industry to develop both conventional and unconventional reservoirs. By creating a system of fractures in the reservoir, hydraulic fracturing makes it possible: – to improve the permeability in the formation zone around the reservoir; – to increase the area of fluid filtration through the formation to the well; – to change the direction of fluid flow in the formation. The basic hydraulic fracturing operation performed has resulted in a fracture with a half-length of 136.9 m, a total fracture height of 36.5 m, and a width of 0.0 mm to 3.7 mm with an average value of 1.5 mm. Thus, the crack was longer than designed under reduced profile geometry parameters. The crack formed at a high average wellhead pressure of 560 kgf/cm2. During the basic hydraulic fracturing process, 120 m3 of fluid and 23.9 tons of propane were injected, thereby achieving an average concentration of 2.57 kg/m2, which created conditions for the preservation of the main fracture and channels, their consolidation, as well as enabled good permeability. The simulation results obtained using FracCADE software were successfully applied to the Rakytnyanske gas field development project in the Kharkiv oblast. By optimizing the hydraulic fracturing process in complex geological structures, it was possible to increase well production rates by more than 35 times and reduce costs

26 February 2024 in Technology audit and production reserves
Verified
Journal Article
Open access
PDF file
VRVictoriia Rubel
Victoriia Rubel
VPVadym Pshyk
Vadym Pshyk
The object of research in the work is the FracCADE software, with which it is possible to simulate the process of hydraulic fracturing and well field, on which the intensification method is designed. This hydraulic fracturing simulator was developed by Schlumberger Ltd. based on proven physical principles of hydraulic fracturing to optimize the treatment process and proven in practice. The system includes a range of hydraulic fracturing models, from 2D models to extensive 3D simulations with lateral communication. It includes a number of complementary modules for fracturing fluid and proppant optimization, injection scheduling, real-time monitoring, pressure equalization, production forecasting and economic evaluation. Some models allow simulating the geometry of the fracture, solving proppant concentration problems, and simulating possible shielding due to proppant covering the fracture or the dehydration process. Hydraulic fracturing remains one of the main engineering tools for increasing the productivity of wells. The effect is achieved due to: – creation of a conductive channel (fracture) through the damaged (contaminated) zone around the well, in order to penetrate beyond its boundaries; – spreading of the channel (fracture) in the formation to a considerable depth in order to further increase the productivity of the well; – creation of a channel (fracture), which would allow changing, influencing the fluid flow in the formation. In the latter case, fracturing really becomes an effective tool that allows to manage the operation of the reservoir (in particular, change its filtering characteristics) and implement long-term strategic development programs. The concept of hydraulic fracturing is quite simple. In general, for relatively simple geology, the physical foundations of fracturing theory are fairly well developed and tested. For the most part, the difficulties boil down to two problems: the real geological conditions and the complex multidisciplinary nature of the fracturing process itself. The process of designing fracturing in order to achieve a certain result is closely related to rock mechanics (which affects the geometric parameters of the fracture), fluid hydromechanics (in which the tasks of controlling the flow of the working fluid and placing the proppant in the fracture are solved) and chemistry, which determines the behavior of materials, which are used during hydraulic fracturing. Moreover, the hydraulic fracturing project must take into account the physical limitations imposed by the specifics of the real deposit and well. In addition, to achieve the desired results, the fracturing operation must be carried out in strict accordance with the calculations (that is, a complete cycle in which each operation plays its role).