Victoriia Rubel

Victoriia Rubel

Auto-generated profile, based on publicly available information

Victoriia Rubel

National University "Yuri Kondratyuk Poltava Polytechnic

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
MPMaryna Petruniak
Maryna Petruniak
VRVictoriia Rubel
Victoriia Rubel
VCVira Chevhanova
Vira Chevhanova
SKSvitlana Kulakova
Svitlana Kulakova
Purpose. Research and substantiating the expediency of cement mix formulations of grout slurries with different Defecate additive content and their effective use when cementing the reservoirs prone to absorption of the cement slurry, as well as to prevent behind-the-casing flows and for cementing operations in the zone of abnormal pressures (hydraulic seam fracturing). Methods. Analytical and experimental studies of the physical-chemical grout slurry properties are used: determining the influence of the Defecate additive content on the cement mixture technological properties; study of a change in the grout slurry rheological characteristics at various temperature conditions; testing the formulation of grout slurry with different rates of strength development; substantiating the economic efficiency of using the grout mixtures with the Defecate additive. Findings. It has been revealed that the cement mixture fluidity increases by 10-20% with the addition of a Defecate in the proportion of 5-20%. With a further increase in the Defecate content, the stone strength deteriorates, and with a decrease, the grout slurry concentration increases. It has been found that when Defecate is added to the cement mixture in a proportion of 20%, the pumpability of the cement slurry doubles, that is, from 1.5 to 3 hours. The economic efficiency has been proved of using these mixtures during insulating activities in the well No. 122 of the Kulychykhynske NHKR (oil and gas condensate field). The improved formulations of grout slurry with the addition of a Defecate are recommended to be used during repair-insulation works for delimitation of producing reservoirs prone to absorption, behind-the-casing flows and hydraulic fracturing. Originality. New dependences have been determined of the technological and rheological characteristics of grout slurries on the content of the Defecate additive, which makes it possible to set its optimal proportion.

14 June 2020
Verified
Book Chapter
Closed access
PDF file
AKAlla Kariuk
Alla Kariuk
VRVictoria Rubel
Victoria Rubel
VPVictor Pashynskyi
Victor Pashynskyi
SDStanislav Dzhyrma
Stanislav Dzhyrma

30 April 2024 in Eastern-European Journal of Enterprise Technologies
Verified
Journal Article
Open access
PDF file
VRVictoriia Rubel
Victoriia Rubel
VRVyacheslav Rubel
Vyacheslav Rubel
TSTetiana Surzhko
Tetiana Surzhko
SGSergii Goshovskyi
Sergii Goshovskyi
This paper investigates the method of vibrating wave swabbing, which is used to stimulate the flow of liquid to the well. This method is known to generate mechanical waves in the soil that open microcracks and pores, increasing the flow of hydrocarbons. A carbonate reservoir with low permeability, which is quite common in the oil and gas industry, was considered as the study object. Therefore, the object of research was carbonate low-permeability reservoirs. After all, their low permeability makes the extraction of oil and gas from them a difficult task. As a result of processing, it was established that increasing the amplitude of pressure fluctuations contributes to increasing the efficiency of the vibration wave action, as the permeability of the reservoir increases more intensively, which was confirmed by the coefficient of determination, which was R2=0.92. And an increase in the frequency of oscillations, on the contrary, reduces it, because the depth of the effective zone of vibrational action decreases; in this case, the coefficient of determination was R2=0.81. To study the effect, a laboratory setup was designed that included a plunger device that generated fluid perturbations in a conditional borehole. The resulting elastic waves were measured by a manual contact vibrometer. Vibrating wave swabbing is a promising method for intensifying hydrocarbon production. The influence under investigation could be implemented in oil and gas fields with carbonate low-permeability reservoirs. This would lead to an increase in fluid production and improved efficiency of the oil and gas industry Досліджується метод віброхвильового свабування, який використовується для стимуляції припливу рідини до свердловини. Як відомо, метод полягає в тому, щоб створювати механічні хвилі в грунті, що розкривають мікротріщини та пори, збільшуючи при цьому приплив вуглеводнів. В якості об’єкту розглядався карбонатний колектор з низькою проникністю, який досить часто зустрічається в нафтогазовій промисловості. Тому об’єктом дослідження є карбонатні низькопроникні колектори. Адже їх низька проникність робить видобуток нафти та газу з них складним завданням. В результаті обробки було встановлено, що збільшення амплітуди коливань тиску сприяє підвищенню ефективності віброхвильової дії, так як проникність колектора зростає інтенсивніше, що і підтвердилося коефіцієнтом детермінації який склав R² = 0,92. А збільшення частоти коливань навпаки знижує, бо зменшується глибина ефективної зони віброхвильової дії, і в цьому випадку коефіцієнт детермінації склав R² = 0,81. Для дослідження впливу була розроблена лабораторна установка, яка включала пристрій-плунжер, який генерував збурення рідини в умовній свердловині. Пружні хвилі, що утворилися, вимірювалися ручним контактним віброметром. Віброхвильове свабування є перспективним методом для інтенсифікації видобутку вуглеводнів. Вплив, що досліджується може бути впроваджено на нафтових та газових родовищах з карбонатними низькопроникними колекторами. Це призведе до збільшення видобутку флюїду та підвищення ефективності роботи нафтогазовидобувної галузі

26 February 2024 in Technology audit and production reserves
Verified
Journal Article
Open access
PDF file
VRVictoriia Rubel
Victoriia Rubel
VPVadym Pshyk
Vadym Pshyk
The object of research in the work is the FracCADE software, with which it is possible to simulate the process of hydraulic fracturing and well field, on which the intensification method is designed. This hydraulic fracturing simulator was developed by Schlumberger Ltd. based on proven physical principles of hydraulic fracturing to optimize the treatment process and proven in practice. The system includes a range of hydraulic fracturing models, from 2D models to extensive 3D simulations with lateral communication. It includes a number of complementary modules for fracturing fluid and proppant optimization, injection scheduling, real-time monitoring, pressure equalization, production forecasting and economic evaluation. Some models allow simulating the geometry of the fracture, solving proppant concentration problems, and simulating possible shielding due to proppant covering the fracture or the dehydration process. Hydraulic fracturing remains one of the main engineering tools for increasing the productivity of wells. The effect is achieved due to: – creation of a conductive channel (fracture) through the damaged (contaminated) zone around the well, in order to penetrate beyond its boundaries; – spreading of the channel (fracture) in the formation to a considerable depth in order to further increase the productivity of the well; – creation of a channel (fracture), which would allow changing, influencing the fluid flow in the formation. In the latter case, fracturing really becomes an effective tool that allows to manage the operation of the reservoir (in particular, change its filtering characteristics) and implement long-term strategic development programs. The concept of hydraulic fracturing is quite simple. In general, for relatively simple geology, the physical foundations of fracturing theory are fairly well developed and tested. For the most part, the difficulties boil down to two problems: the real geological conditions and the complex multidisciplinary nature of the fracturing process itself. The process of designing fracturing in order to achieve a certain result is closely related to rock mechanics (which affects the geometric parameters of the fracture), fluid hydromechanics (in which the tasks of controlling the flow of the working fluid and placing the proppant in the fracture are solved) and chemistry, which determines the behavior of materials, which are used during hydraulic fracturing. Moreover, the hydraulic fracturing project must take into account the physical limitations imposed by the specifics of the real deposit and well. In addition, to achieve the desired results, the fracturing operation must be carried out in strict accordance with the calculations (that is, a complete cycle in which each operation plays its role).

30 August 2025 in Technology audit and production reserves
Verified
Journal Article
Open access
PDF file
TPTaras Petrenko
Taras Petrenko
VRVictoriia Rubel
Victoriia Rubel
The object of the study is the processes of enhancing oil recovery and geological storage of CO₂ in a depleted, highly waterflooded oil reservoir, modeled using a three-dimensional compositional reservoir simulation model. The key problem addressed in CCUS projects is the internal contradiction between maximizing oil production and optimizing the volume and safety of long-term CO₂ storage. The study examined the choice of an operational strategy that would balance these objectives under conditions of high geological heterogeneity and the risk of early gas breakthrough. It was established that the “injection – depletion” strategy provides the highest cumulative oil production (about 1.8 million m³) but is inefficient due to early gas breakthrough (after ~ 2 years). The pressure-maintenance strategy proved to be the most balanced: gas breakthrough was delayed by 1.5 years, ensuring high CO₂ storage efficiency, but cumulative oil production was lower (about 1.5 million m³). The water-alternating-gas (WAG) technology, for the geological conditions of this reservoir, proved detrimental, causing abnormal pressure build-up (up to 824 bar) and blockage of oil reserves. The obtained results are explained by the physics of the process. The early gas breakthrough in the first scenario is due to CO₂ gravitational segregation and the formation of a gravity override (“gravity tongue”). The efficiency of the second scenario is associated with the creation of a more stable displacement front through pressure maintenance. The complete inefficiency of WAG is explained by the presence of high-permeability channels in the geologically heterogeneous formation, through which water moved, bypassing the oil. The results can be practically applied by operators of mature fields to justify the choice of a CCUS strategy. They provide a quantitative basis for assessing the trade-off between short-term economic benefits (production) and long-term environmental objectives (storage). The study confirms the critical importance of conducting detailed geological modeling before applying WAG, in order to avoid substantial financial losses.

16 June 2026 in Technology audit and production reserves
Verified
Journal Article
Open access
OLOleksandr Levchenko
Oleksandr Levchenko
BKBogdan Korobko
Bogdan Korobko
OIOleksandr Ivakhno
Oleksandr Ivakhno
VRVictoriia Rubel
Victoriia Rubel
The object of this research is a mathematical model of mass flow rate of moist bulk materials (construction sand) in feeding systems of concrete mixing plants (CMPs). The subject of the research is the experimental verification of this mathematical model under real production conditions. The problem addressed concerns the critical instability of mass flow rate when using natural washed sand. Increased moisture content (6–10%) changes the mass flow regime to a funnel flow and causes the formation of arches above the discharge opening. The coefficient of variation in dosing under such conditions reaches 12–25%, which is 4–8 times higher than the state standard for accuracy. The mathematical model was verified using results obtained on a real CMP with a capacity of 60 m³/h, designed and commissioned by the authors and still in operation today. They confirm that installing an active loosener with a rotational speed of ωpr ≥ 2.5 · ωcr completely solves the problem of stabilizing the dosage across the entire range of production moisture contents. Threshold rotational speeds have been established depending on moisture content (specifically, 87 rpm for 6%). A constructed three–dimensional response surface demonstrates that, for a guaranteed dosing error of ≤3%, the working speed of the loosener must be 2.5 times higher than the threshold. Adherence to this operating mode reduces the actual variation to 1.8%. A mathematical model of mass flow rate (R² = 0.963) was also statistically described, and empirical coefficients were determined: pin resistance in the material (1.12) and mechanism efficiency (2.8). This effect is explained by the artificial, abrupt transition of the material from a vortex flow regime back to a bulk flow regime. Upon reaching the critical rotation speed of the pins, the capillary bonds between the grains are intensively broken, thereby reducing the effective angle of internal friction and completely eliminating stagnant zones in the hopper. All of this instantly restores stable, continuous gravitational flow. The results are practically applicable to the engineering calculation of feeding systems for concrete mixing plants and can be adapted for related industrial sectors.