Taiyue Qi

Taiyue Qi

Auto-generated profile, based on publicly available information

Taiyue Qi

School of Civil Engineering, Southwest Jiaotong University, Chengdu, China

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 February 2024 in Computer-Aided Civil and Infrastructure Engineering
Verified
Journal Article
Open access
SQShaojie Qin
Shaojie Qin
TQTaiyue Qi
Taiyue Qi
TDTang Deng
Tang Deng
XHXiaodong Huang
Xiaodong Huang

6 October 2023 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
SQShaojie Qin
Shaojie Qin
TQTaiyue Qi
Taiyue Qi
BLBo Lei
Bo Lei
XHXiaodong Huang
Xiaodong Huang

27 March 2019 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
YLYan Li
Yan Li
TQTaiyue Qi
Taiyue Qi
BLBo Lei
Bo Lei
Wangping QianWangping Qian
Wangping Qian
ZLZongyang Li
Zongyang Li
The special mechanics of inclined stratified jointed rock may cause unexpectedly surface settlement. This paper studies the special rock condition with analyses of discrete element method (DEM) numerical analysis, field monitoring data and physical model testing results. Numerical models with different internal friction angles, different thicknesses and different inclination angles were analyzed. The surrounding rock deformation patterns can be divided into three categories—shear deformation pattern, mixed deformation pattern and normal deformation pattern—based on different dominant deformation behaviors. The beam analogue model and combined beam analogue model were discussed in different stratum thickness conditions to understand the surrounding deformation patterns. It was found that the settlement trough consisted of two diverging dissymmetrical Gaussian curves by comparing the settlement troughs for different inclination angles, which is unique for excavation in ordinary rock conditions. In this paper, the approximated formulas to verifying the settlement trough position were provided to secure the safety of the upper structures during tunnel excavation.

14 April 2023 in European Journal of Mechanics - A/Solids
Verified
Journal Article
Closed access
BLBo Lei
Bo Lei
TQTaiyue Qi
Taiyue Qi
YLYan Li
Yan Li
ZJZhiyi Jin
Zhiyi Jin
WQWangping Qian
Wangping Qian

1 March 2019 in Geophysics
Verified
Journal Article
Closed access
LYLi Yan
Li Yan
TQTaiyue Qi
Taiyue Qi
BLBo Lei
Bo Lei
ZLZongyang Li
Zongyang Li
Wangping QianWangping Qian
Wangping Qian
The correct interpretation of full-space transient electromagnetic data has always constituted a critical safety problem during tunnel excavation projects. Targeting the interpretation of water-filled caves under narrow tunnel conditions, we have developed an iterative inversion method based on 3D finite-difference time-domain (FDTD) forward calculations and a direction algorithm. In total, 125 groups of 3D FDTD forward calculation results are analyzed to identify the correlations between the response data and the geometric conditions of the cave. A direction algorithm is established based on the correlations, thereby increasing the iterative inversion convergence speed. Using the proposed iterative inversion method, the location and volume of the water-filled cave in front of the tunnel face are successfully inverted. Through an iterative program, the inversion results of simulations involving the detection of water-filled caves under tunnel conditions are accurately analyzed, and the relative error is less than 10%. The application of the iterative inversion method to the Mingyue Mountain Tunnel project suggests that this method is capable of interpreting the size of water-filled caves and it is valid for a narrow tunnel face with only a single available measurement point. The proposed iterative inversion method can be used alone or in combination with other detection techniques, thereby providing engineers with a better early warning system for detecting water-filled caves in tunnels.

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
XLXiao Liang
Xiao Liang
TQTaiyue Qi
Taiyue Qi
ZJZhiyi Jin
Zhiyi Jin
SQShaojie Qin
Shaojie Qin
PCPengtao Chen
Pengtao Chen
Constructing a shield tunnel that crosses under a river poses considerable safety risks, and risk assessment is essential for guaranteeing the safety of tunnel construction. This paper studies a risk assessment system for a shield tunnel crossing under a river. Risk identification is performed for the shield tunnel, and the risk factors and indicators are determined. The relationship between the two is determined preliminarily by numerical simulation, the numerical simulation results are verified by field measurements, and a sample set is established based on the numerical simulation results. Fuzzy comprehensive evaluation and a backpropagation neural network are then used to evaluate and analyze the risk level. Finally, the risk assessment system is used to evaluate the risk for Line 5 of the Hangzhou Metro in China. Based on the evaluation results, adjustments to the slurry strength, grouting pressure, and soil chamber pressure are proposed, and the risk is mitigated effectively.