Bo Lei

Bo Lei

Auto-generated profile, based on publicly available information

Bo Lei

Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, China

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 October 2023 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
SQShaojie Qin
Shaojie Qin
TQTaiyue Qi
Taiyue Qi
BLBo Lei
Bo Lei
XHXiaodong Huang
Xiaodong Huang

23 April 2014 in Building Simulation
Verified
Journal Article
Closed access
PDF file
TYTao Yu
Tao Yu
Per HeiselbergPer Heiselberg
Per Heiselberg
BLBo Lei
Bo Lei
Michał PomianowskiMichał Pomianowski
Michał Pomianowski


1 June 2019 in Journal of Materials in Civil Engineering
Verified
Journal Article
Closed access
Wangping QianWangping Qian
Wangping Qian
TQTaiyue Qi
Taiyue Qi
ZJZhiyi Jin
Zhiyi Jin
YGYuchen Gong
Yuchen Gong
WJWeidu Ji
Weidu Ji
BLBo Lei
Bo Lei
At present, most model experiments of tunnel linings use a gypsum-based mixture material as the similar material for static and dynamic research, but the fatigue characteristics of these materials have not been investigated thoroughly and warrant further research. In this work, a fatigue experiment of a gypsum-based mixture material under cyclic loading was carried out, and the fatigue characteristics at different stress levels were investigated and summarized. The experimental results show that the logarithmic number of cycles to failure exhibit linear variation, and the relationship between the resident strain and cyclic time can be approximated by an exponential function. The strain curve shows that there are obvious three-stage characteristics throughout the loading process and that each stage accounts for 10%, 85%, and 5% of the entire loading time, respectively. The dissipation energy varies over a small range, and its average value demonstrates exponential variation at different stress levels. The accumulated residual deformation due to unrecoverable damage pushes the hysteresis curve in the direction of deformation enlargement over the full cycle process. The evolution law of the fatigue damage curve is related to the inherent parameters of the material only, regardless of the stress conditions, exhibiting exponential nonlinear damage accumulation. This investigation provides an informative reference for the fatigue evaluation of similar materials in indoor experiments.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
XLXiao Liang
Xiao Liang
TQTaiyue Qi
Taiyue Qi
ZJZhiyi Jin
Zhiyi Jin
PCPengtao Chen
Pengtao Chen
BLBo Lei
Bo Lei
XWXianyu Wang
Xianyu Wang
Water leaking into metro segments is related directly to the presence of underground water. However, to date, the underground confined water channels formed by metro underpass reinforcement structures have not been considered as causes of the problem. In the present study, based on field investigations and geological data, confined water is identified as the source of segment leakage on Line 5 of Hangzhou Metro in China. It is then hypothesized that the problem stems from an underground confined water channel formed under the reinforced structure of the subway. Numerical simulations predict a settlement difference of 8–10 mm between the reinforcement area and the weak strata, and field monitoring data show this difference to be 8.62 mm. This consistency between the numerical simulations and the field measurements verifies the hypothesis. Finally, given the causes of underground confined water channels, corresponding technical measures such as piecewise secondary grouting are proposed to cut them off and avoid metro‐segment leakage. The present research results contribute to the causes of and the laws governing the metro‐segment leakage that occurs at subway stations and other reinforced structures.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
ZJZhiyi Jin
Zhiyi Jin
TQTaiyue Qi
Taiyue Qi
XLXiao Liang
Xiao Liang
BLBo Lei
Bo Lei
With the acceleration of urbanization in China, more underpasses will be constructed in big cities to alleviate the great traffic pressure. The prefabricated and assembly construction method has been introduced to replace the traditional cast‐in‐place method to achieve quick construction. However, for a fully prefabricated and assembled underground structure (PAUS) with large cross section, the structure must be cut into segments in transverse direction to reduce the size and weight for easy transportation and assembly. Therefore, how to develop an optimal partition scheme is a new problem to be studied. Firstly, three preliminary partition schemes were proposed based on the internal force distribution and completed engineering practices. Then, the three schemes were compared in terms of bending moment, shear force, and axial force. The construction efficiencies were also compared with special emphasis on difference of the build period. Finally, an optimal partition scheme was determined and successfully applied in the real project. Furthermore, the construction period of this partition scheme was 1/3 of the traditional cast‐in‐place method. The results of the current paper can provide some design guidance to large cross‐sectional underpasses and other underground structures in the partition stage.