Libang Guo

Libang Guo

Auto-generated profile, based on publicly available information

Libang Guo

College of Electrical Engineering, Zhejiang University, Hangzhou, China

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 November 2020 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
LGLibang Guo
Libang Guo
CYChengjin Ye
Chengjin Ye
Yi DingYi Ding
Yi Ding
Peng WangPeng Wang
Peng Wang
The allocation of fault current limiters (FCLs) is increasingly challenging in transmission systems these days. Specifically, the utilized deterministic expected short-circuit fault (SCF) scenarios are prone to cause over-configuration of FCLs. Moreover, the well-established local switching framework (LSF) renders inappropriate FCL switching and may further harm the system safe operation. Aiming at the above deficiencies, a novel 5G-based centralized switch FCL (CSF) framework as well as a method to allocate such flexible FCLs optimally is proposed in this paper. In the proposed CSF, the FCLs are switched by a FCL dispatching (FD) model considering system security constraints of both fault current and voltage sags. By exploiting the fast communication capability of 5G network as well as an off-line fault scanning strategy, the FD model is enabled to give online FCL switching schemes to meet the fast requirement of power system protection. Moreover, considering the probabilistic characteristic of SCFs, a bi-level FCL allocation model is established, in which the upper-level model sites and sizes FCLs considering the installation and expected switching costs while the lower-level model determines the optimal switched FCLs under each specific SCF scenario. Finally, numerical results are provided to verify the proposed allocation model, including its defending effect against SCFs in terms of fault current limiting, voltage sags relieving, as well as its cost-effectiveness.

6 November 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
LGLibang Guo
Libang Guo
Yi DingYi Ding
Yi Ding
minglei baominglei bao
minglei bao
Changzheng ShaoChangzheng Shao
Changzheng Shao
Peng WangPeng Wang
Peng Wang
LGLalit Goel
Lalit Goel
Due to stochastic failures and complex operating modes, the application of a VSC-MTDC system can have a significant influence on the reliability of hybrid AC/DC power systems. This paper presents a new technique for evaluating the nodal reliability of a hybrid AC/DC power system based on the VSC-MTDC system. The proposed technique is incorporated within a multi-state model for the VSC-MTDC system. Then, an optimization model for contingency management of a hybrid AC/DC power system is formulated. The model is established based on the optimal power flow technique for a hybrid AC/DC power with a VSC-MTDC system. The objective of the model is to minimize the total system cost when determining the load curtailment and generation dispatch results for each contingency state. Nodal reliability indices for hybrid AC/DC power systems are proposed to evaluate the reliability performance of customers at each node. The effectiveness of the proposed methods is validated using a modified IEEE RTS system.

14 January 2021 in IEEE Access
Verified
Journal Article
Open access
LGLibang Guo
Libang Guo
Yi DingYi Ding
Yi Ding
MBMinglei Bao
Minglei Bao
DZDan Zeng
Dan Zeng
In countries with large-scale power systems and nascent electricity markets, the inter-regional electricity trading aggregators (IRETAs) are in charge of participating in inter-regional electricity trading (IRET) on behalf of the generators and loads within the region except for operating the regional power systems (RPSs). As price makers in IRET and system operators of RPSs, IRETAs should make their bidding strategies considering both the RPSs’ reliability requirements and the IRET’s transmission losses to ensure both the safe operation of RPS and the profits in the IRET, which cannot be handled by the current methods. Therefore, this paper investigates an approach to help IRETAs make comprehensive bidding strategies in the IRET. Firstly, a hierarchical framework for an IRETA to participate in IRET is introduced. Then a bi-level model is proposed, in which the optimal operation of RPS and the market-clearing process of IRET are regarded as the upper and lower-level problems. Specifically, the upper-level problem is modeled as a two-stage stochastic optimization problem considering both the fault states and the reliability requirements of RPS. Moreover, the non-negligible losses from the inter-regional electricity transmission are internalized in the lower-level problem to consider their impacts on the IRETA’s bidding strategy-making. The proposed bi-level model is nonlinear and transformed into a linear single-level one through the Karush-Kuhn-Tucker (KKT) conditions and the dual theory. Finally, simulations demonstrate that the bidding strategy formed by the proposed method reduces the number of buses exceeding the limit of reliability requirement by over 50% and cuts down the transmission loss by over 40% compared with the former works.

9 March 2022 in IEEE Systems Journal
Verified
Journal Article
Closed access
LGLibang Guo
Libang Guo
Yi DingYi Ding
Yi Ding
CYChengjin Ye
Chengjin Ye
The ever-growing applications of the multiterminal direct current (MTDC) systems have introduced interdependence in terms of operation conditions between ac and dc systems. When considering such a conditional dependence, the outage probabilities are affected by the previous fault events in hybrid ac–dc power systems and thus no longer independent, rendering the results from conventional reliability evaluation techniques to be inaccurate. This article provides a method to evaluate the operational reliability of the MTDC-based hybrid ac–dc power systems considering the conditional dependence between the ac and MTDC systems. First, a conditional-dependent fault analysis model is developed to describe the entire temporal fault process. In the proposed model, dynamic state models for components are built considering system parameters that affect their outage probabilities. A redispatch model for the hybrid ac–dc power system is then established to characterize the variation of operation status between different periods. After that, a framework to evaluate the operational reliability of a hybrid ac–dc power system considering conditional-dependent faults is formulated by combining the conditional fault analysis model and the Monte Carlo simulation technique. The impacts of conditional dependence on the reliability of hybrid ac–dc power systems are quantified by the modified reliability indices. Finally, the proposed method is validated by modified IEEE-RTS systems with different MTDC topologies and ac–dc coupling levels to demonstrate the impact of conditional-dependent faults.