Vanessa Cerqueira Koppe

Vanessa Cerqueira Koppe

Auto-generated profile, based on publicly available information

Vanessa Cerqueira Koppe

UFRGS

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 May 2011 in Natural Resources Research
Verified
Journal Article
Closed access
PDF file
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
JCJoão Felipe Costa
João Felipe Costa
RPRodrigo de Lemos Peroni
Rodrigo de Lemos Peroni
JKJair Carlos Koppe
Jair Carlos Koppe

10 December 2016 in Natural Resources Research
Verified
Journal Article
Closed access
PDF file
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
RRRicardo Hundelshaussen Rubio
Ricardo Hundelshaussen Rubio
JCJoão Felipe Coimbra Leite Costa
João Felipe Coimbra Leite Costa

1 March 2022 in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
Verified
Journal Article
Closed access
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
JCJoão Felipe Costa
João Felipe Costa
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
MBMarcel Antonio Arcari Bassani
Marcel Antonio Arcari Bassani
In mine planning, metallurgical recovery is traditionally estimated in each block as a fixed value or a function of the block's primary geological attributes. Nevertheless, this variable has two characteristics that are often neglected. First, it is non-additive, which means that estimation and scaling procedures of such properties cannot be done based on linear techniques. Second, it is a process response variable, which means this variable value represents the response of the volume processed at the plant. The combination of these two properties results that the metallurgical recovery of each block is dependent on the blocks that will be mined and processed together with it at the plant. This paper demonstrates the difference between how metallurgical recovery is traditionally considered in mine planning, and how it should be. There are impacts on mine scheduling/blending, global metallurgical recovery estimation (total quantity of metal recovered) and total economic value.

1 March 2018 in REM - International Engineering Journal
Verified
Journal Article
Open access
PDF file
CACristina da Paixão Araújo
Cristina da Paixão Araújo
JCJoão Felipe Costa
João Felipe Costa
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
Short-term mining planning typically relies on samples obtained from channels or less-accurate sampling methods. The results may include larger sampling errors than those derived from diamond drill hole core samples. The aim of this paper is to evaluate the impact of the sampling error on grade estimation and propose a method of correcting the imprecision and bias in the soft data. In addition, this paper evaluates the benefits of using soft data in mining planning. These concepts are illustrated via a gold mine case study, where two different data types are presented. The study used Au grades collected via diamond drilling (hard data) and channels (soft data). Four methodologies were considered for estimation of the Au grades of each block to be mined: ordinary kriging with hard and soft data pooled without considering differences in data quality; ordinary kriging with only hard data; standardized ordinary kriging with pooled hard and soft data; and standardized, ordinary cokriging. The results show that even biased samples collected using poor sampling protocols improve the estimates more than a limited number of precise and unbiased samples. A welldesigned estimation method corrects the biases embedded in the samples, mitigating their propagation to the block model.

1 March 2006 in Rem: Revista Escola de Minas
Verified
Journal Article
Open access
PDF file
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
JCJoão Felipe Costa
João Felipe Costa
JKJair Carlos Koppe
Jair Carlos Koppe
O planejamento da lavra de um depósito mineral envolve o conhecimento de um ou mais atributos desse depósito. Esse conhecimento é obtido através de amostras do atributo em certos locais do depósito. Contudo a coleta de amostras pode envolver elevados custos, o que restringe o número de amostras e os locais onde valores do atributo são conhecidos. Assim, a estimativa de valores, em locais não amostrados, se torna necessária. A idéia de estimar valores em grids tridimensionais, utilizando amostras em coordenadas cartesianas e algoritmos da geoestatística pode levar a estimativas equivocadas em certas situações. Comumente, esse tipo de coordenadas não é compatível com a aplicação da geoestatística, visto que esse tipo de coordenadas pode prejudicar a determinação da continuidade dos valores amostrais e essa continuidade é a base dos algoritmos geoestatísticos. Assim, a questão da transformação de coordenadas cartesianas para coordenadas que permitam uma melhor determinação da continuidade dos valores amostrais é abordada nesse artigo. Para exemplificar a metodologia, uma transformação de coordenadas em um caso real de estimativas do atributo vagarosidade de onda acústica é apresentado.

1 December 2015 in Rem: Revista Escola de Minas
Verified
Journal Article
Open access
PDF file
RHRicardo Hundelshaussen
Ricardo Hundelshaussen
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
JCJoão Felipe Costa
João Felipe Costa
PCPablo Koury Cherchenevski
Pablo Koury Cherchenevski
Some mineral deposits show mineralization along layers. These layers may pass through several subsequent geological events such as folding and/or severe erosional processes. Grades within these deposits tend to be correlated along orientations where the mineralization was originally deposited or along the same geological period (stratigraphic level). Consequently, some locations close to each other in terms of geographical coordinates can show uncorrelated grades. Spatial continuity analysis can also be affected by error inflicted by combining samples from different stratigraphic levels. This article uses the coordinate transformation (unfolding) to align the grades measured along the same stratigraphic level. The modification in coordinates improved the spatial continuity modeling and the grade estimates at non-sampled locations. The results showed that the mean of the relative error between the estimated value and the real value of the samples using unfolding is -0.10%. However, when using the original coordinates, the mean of the relative error is -0.65%. Furthermore, the correlation between the real and estimated value using crossvalidation is greater using stratigraphic coordinates. A complete case study in a manganese deposit illustrates the methodology.