Pedro Henrique Alves Campos

Dr. Pedro Henrique Alves Campos

Departamento de Engenharia de Minas, Universidade Federal de Minas Gerais, Belo Horizonte, Minas Gerais, Brazil
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2025 in Mining
Verified
Journal Article
Open access
PDF file
EREdmo C Rodovalho
Edmo C Rodovalho
JLJosé Lima
José Lima
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
PCPedro Casagrande
Pedro Casagrande
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
Geometallurgy is an approach that integrates geology, mining, processing, and environmental areas, aiming to increase knowledge of the deposit and reduce risks in mining projects and/or operations. Growing changes in economic and operational scenarios require the development of robust models for metallurgical responses. Typically, the population of geometallurgical variables is small, and there are restrictions on applying geostatistical techniques, such as Ordinary Kriging, since recoveries are considered non-additive variables. This study used multiple linear regression to develop a geometallurgical model for a bauxite mine. The developed models enabled reconciliation with real results, and this application for bauxite mining represents a novelty in the literature. The model estimated the mass recovery in the coarse fraction with an accuracy greater than 97%. Additionally, the geometallurgical model developed for Mineração Rio do Norte (MRN) allows predictability and mapping potential product quality deviations.

1 March 2022 in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
Verified
Journal Article
Closed access
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
JCJoão Felipe Costa
João Felipe Costa
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
MBMarcel Antonio Arcari Bassani
Marcel Antonio Arcari Bassani
In mine planning, metallurgical recovery is traditionally estimated in each block as a fixed value or a function of the block's primary geological attributes. Nevertheless, this variable has two characteristics that are often neglected. First, it is non-additive, which means that estimation and scaling procedures of such properties cannot be done based on linear techniques. Second, it is a process response variable, which means this variable value represents the response of the volume processed at the plant. The combination of these two properties results that the metallurgical recovery of each block is dependent on the blocks that will be mined and processed together with it at the plant. This paper demonstrates the difference between how metallurgical recovery is traditionally considered in mine planning, and how it should be. There are impacts on mine scheduling/blending, global metallurgical recovery estimation (total quantity of metal recovered) and total economic value.

5 June 2024 in Mining, Metallurgy & Exploration
Verified
Journal Article
Closed access
PDF file
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
JCJoão Felipe Coimbra Leite Costa
João Felipe Coimbra Leite Costa
VKVanessa Cerqueira Koppe
Vanessa Cerqueira Koppe
MBMarcel Antônio Arcari Bassani
Marcel Antônio Arcari Bassani
CDClayton Vernon Deutsch
Clayton Vernon Deutsch

30 November 2019
Verified
Book Chapter
Closed access
PDF file
VBViviane da Silva Borges Barbosa
Viviane da Silva Borges Barbosa
GSGilberto Rodrigues da Silva
Gilberto Rodrigues da Silva
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
PCPedro Casagrande
Pedro Casagrande
LMLuciano Fernandes Magalhães
Luciano Fernandes Magalhães

30 November 2019 in Springer Series in Geomechanics and Geoengineering
Verified
Book Chapter
Closed access
PDF file
ALAugusto Ribeiro Lages
Augusto Ribeiro Lages
VBViviane da Silva Borges Barbosa
Viviane da Silva Borges Barbosa
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
RBRodrigo Correia Barbosa
Rodrigo Correia Barbosa
GSGilberto Rodrigues da Silva
Gilberto Rodrigues da Silva
LMLuciano Fernandes Magalhães
Luciano Fernandes Magalhães

4 July 2025 in Mining
Verified
Journal Article
Open access
PDF file
Jordan Johnny SilvaJordan Johnny Silva
Jordan Johnny Silva
ABAnna Luiza Madureira Batista
Anna Luiza Madureira Batista
ASAugusto Y. C. Santos
Augusto Y. C. Santos
Leonardo Junior Fernandes CamposLeonardo Junior Fernandes Campos
Leonardo Junior Fernandes Campos
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
Geometallurgy is an approach that utilizes predictive models that can support business decisions, mitigate risks, and enhance production efficiency. To develop an accurate geometallurgical model, it is essential to understand the behavior of each lithology within the ore body through geometallurgical testing. In this context, the present study aims to evaluate the performance of bench-scale tests conducted on the main mining fronts of a zinc mine operation located in Brazil. The mineral processing plant was designed to process lead and zinc sulfide ores without material stockpiling, where all ores extracted from the underground mine are immediately processed. The geometallurgical characterization was conducted through the following steps: sampling, crushing, grinding, and flotation. The recovery, concentrate, and tailing contents during the flotation stages of galena and sphalerite were analyzed. A mineralogical characterization using a Mineral Liberation Analyzer (MLA) was performed to assess the degree of particle liberation and mineral associations within the studied mining fronts. The results indicate that a higher degree of pyrite liberation leads to greater metallurgical recovery of mineralized bodies A (breccia-hosted orebody), B (sphalerite-rich doloarenite orebody), and C (upper replaced stratiform orebody). Among these, mineralized body C presents the highest recovery in the zinc and lead stages, with 99.5% and 86.2%, respectively.