Authors of this research developed a traffic simulation model for the downtown San Jose network and evaluated five different street redesign and travel demand combinations. This model aids understanding of network-wide effects of changes in street design for local and regional agencies who are interested in implementing complete streets and/or one-way to two-way conversion. The base network may be altered to model and evaluate other complete streets (e.g., road diet) and tactical urbanism (e.g., farmer’s market on city streets on certain days of the week) scenarios. The 3-dimensional animated videos for each scenario are also created to be used for public outreach by the city to engage the stakeholders in the planning and implementation process. Quantitative measures used for evaluating the scenarios include travel times on key corridors and network-wide delays during the afternoon peak hour. The evaluation shows the current city street network will be able to sustain a modest (between 5% and 10%) increase in single-occupancy automobile travel demand. The network will be overwhelmed if the single-occupancy automobile travel demand were to increase to the level projected per the city’s 2040 general plan. This outcome points to the need for strong Travel Demand Management (TDM) measures.
Coordinated ramp metering (CRM) is a critical component of smart freeway corridors that rely on real-time traffic data from ramps and freeway mainline to improve decision-making by the motorists and Traffic Management Center (TMC) personnel. CRM uses an algorithm that considers real-time traffic volumes on freeway mainline and ramps and then adjusts the metering rates on the ramps accordingly for optimal flow along the entire corridor. Improving capacity through smart corridors is less costly and easier to deploy than freeway widening due to high costs associated with right-of-way acquisition and construction. Nevertheless, conversion to smart corridors still represents a sizable investment for public agencies. However, in the U.S. there have been limited evaluations of smart corridors in general, and CRM in particular, based on real operational data. This project examined the recent Smart Corridor implementation on Interstate 80 (I-80) in the Bay Area and State Route 99 (SR-99, SR99) in Sacramento based on travel time reliability measures, efficiency measures, and before-and-after safety evaluation using the Empirical Bayes (EB) approach. As such, this evaluation represents the most complete before-and-after evaluation of such systems. The reliability measures include buffer index, planning time, and measures from the literature that account for both the skew and width of the travel time distribution. For efficiency, the study estimates the ratio of vehicle miles traveled vs. vehicle hour traveled. The research contextualizes before-and-after comparisons for efficiency and reliability measures through similar measures from another corridor (i.e., the control corridor of I-280 in District 4 and I-5 in District 3) from the same region, which did not have CRM implemented. The results show there has been an improvement in freeway operation based on efficiency data. Post-CRM implementation, travel time reliability measures do not show a similar improvement. The report also provides a counterfactual estimate of expected crashes in the post-implementation period, which can be compared with the actual number of crashes in the “after” period to evaluate effectiveness.