The Someș Corridor, located in the central Transylvanian region of Romania, is a territory characterised by favourable conditions for habitation and land use with agricultural purposes, offering suitable premises for the development of the settlements and the economic activities taking place in the area. This study aims to identify the parcels of land from outside the built-up area, which can be used as arable land, this particular use being pursued due to the favourability induced by the pedological resources, the morphometrical characteristics of the Someș floodplain and, last but not least, the climatic conditions. GIS technology has been used, enabling the management of the databases representing soil, topography and climatic factors, and thus obtaining the classification of all land parcels using favourability classes for agricultural land use. In order to perform a correct favourability classification, the degree of soil pollution and groundwater pollution have been analysed, using chemical tests of water and soil profiles taken in the area of former abandoned industrial platforms, which are intended to be reintroduced in the local economic use. The highest degree of soil pollution with ammonium and sulphates has been identified in the industrial park from Dej city, on the territory of the former industrial platform of the paper factory, this pollution modifying the quality scores of arable land use, despite the fulfilment of favourable climatic and topographic conditions.
Oil contamination in soil from a variety of sources, including accidental leaks, industrial activities, and improper waste disposal, involves disrupting ecosystems, contaminating water, harming human health, and diminishing agricultural productivity. Bioremediation is becoming the most important method accepted as a treatment for hydrocarbon-polluted soil using indigenous microbial flora, which aims to restore soils to their pre-hydrocarbon pollution characteristics. We will follow in our article to give some examples of good practices for bioremediation of oil-polluted soils in some sites in NE Romania. In a first step, all the oil extraction wells in NW Romania were mapped, both those in operation and those abandoned, reaching 695 wells. For 7 case studies, soil profiles were taken from the vicinity of the well column and from points close to it located in the well casing, for which the concentration of total petroleum hydrocarbons was determined. Using GIS spatial interpolation techniques, the theoretical concentration of petroleum hydrocarbons in the soil was determined. The polluted soil was transported to the bioremediation station, where it was exposed to bioremediation procedures, and the period and duration until the soil was brought to the accepted parameters in terms of allowable concentrations were analysed. The time required varies between 17 and 36 weeks needed for bioremediation. Following practical applications, it can be concluded that the time required for bioremediation is directly dependent on the initial concentration of pollutants and the number of chemical and physical interventions applied to the soil.