Fengfeng Xie

Fengfeng Xie

Auto-generated profile, based on publicly available information

Fengfeng Xie

University of Nottingham Ningbo China

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 August 2023 in International Journal of Production Research
Verified
Journal Article
Closed access
BNBaozhuang Niu
Baozhuang Niu
NZNan Zhang
Nan Zhang
FXFengfeng Xie
Fengfeng Xie
HZHailun Zhang
Hailun Zhang

5 December 2024 in Omega
Verified
Journal Article
Closed access
BNBaozhuang Niu
Baozhuang Niu
XDXinhai Deng
Xinhai Deng
FXFengfeng Xie
Fengfeng Xie
ZSZifan Shen
Zifan Shen

22 November 2017 in Complexity
Verified
Journal Article
Open access
PDF file
FZFei Zhao
Fei Zhao
FXFengfeng Xie
Fengfeng Xie
CSChenghua Shi
Chenghua Shi
JKJianshe Kang
Jianshe Kang
Separated decision-making for maintenance and spare ordering is unrealistic in the industry, so this paper aims to optimize them together. A joint policy of inspection-based preventive maintenance (PM) and spare ordering considering two modes of spare ordering, namely, a regular order and an emergency order, is proposed for single-unit systems using a three-stage failure process. If the system is recognized to be in the minor defective stage, the original inspection interval is shortened and a regular order is placed. However, replacement is undertaken preventively or correctively if the severe defective stage is identified or a failure occurs. Depending on the system state and the state of the regular ordered spare when replacement is needed, all possible scenarios are considered to construct optimization model I. The decision variables are the optimal inspection interval and the times of shortening the original inspection interval. Additionally, model II on the basis of an assumption that the spare is always ordered at time 0 is also developed. The results from a numerical example illustrated the applicability and the effectiveness of model I compared to model II, and the irregular inspection policy is validated to be cost-saving compared to the regular inspection policy.

30 April 2026 in European Journal of Operational Research
Verified
Journal Article
Closed access
BNBaozhuang Niu
Baozhuang Niu
EZEnkai Zhang
Enkai Zhang
FXFengfeng Xie
Fengfeng Xie
XDXinhai Deng
Xinhai Deng
GXGuang Xiao
Guang Xiao

1 January 2026 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
BNBaozhuang Niu
Baozhuang Niu
YCYuyang Chen
Yuyang Chen
FXFengfeng Xie
Fengfeng Xie
FZFanzhuo Zeng
Fanzhuo Zeng

28 August 2026 in International Journal of Production Economics
Verified
Journal Article
Closed access
BNBaozhuang Niu
Baozhuang Niu
CLChencan Lin
Chencan Lin
FXFengfeng Xie
Fengfeng Xie
JZJianhua Zhang
Jianhua Zhang