Mert Duygan

Mert Duygan

Auto-generated profile, based on publicly available information

Mert Duygan

Laboratory of Human-Environment Relations in Urban Systems, Ecole Polytechnique Fédérale de Lausanne (EPFL), Lausanne, Switzerland

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2021 in Energy Research & Social Science
Verified
Journal Article
Open access
GTGregory Trencher
Gregory Trencher
NTNhi Truong
Nhi Truong
PTPinar Temocin
Pinar Temocin
MDMert Duygan
Mert Duygan

28 November 2022 in Technology in Society
Verified
Journal Article
Open access
MDMert Duygan
Mert Duygan
MFManuel Fischer
Manuel Fischer
KIKarin Ingold
Karin Ingold

20 March 2025 in Sustainable Futures
Verified
Journal Article
Open access
MDMert Duygan
Mert Duygan
CBClaudia R. Binder
Claudia R. Binder
GMGrégoire Meylan
Grégoire Meylan
MFManuel Fischer
Manuel Fischer


27 November 2021
Verified
Book Chapter
Open access
PDF file
MDMert Duygan
Mert Duygan
AKAya Kachi
Aya Kachi
FOFintan Oeri
Fintan Oeri
TOThiago D. Oliveira
Thiago D. Oliveira
ARAdrian Rinscheid
Adrian Rinscheid
Along with policy proposers and individual voters, key stakeholders play a crucial role in shaping the socio-political acceptance of energy policy. Understanding a broad landscape of energy stakeholders’ views and practices thus should be a central theme in energy transition research. The Energy Strategy 2050 (ES2050), a sweeping energy transition policy package in Switzerland, was adopted in 2017. Concrete policy goals implied by ES2050 are yet to be implemented. Although there is a large body of social acceptance studies focusing on individual voters, we have a relatively scant empirical understanding of how stakeholders in this domain perceive the policy goals and how perceptions are linked to their organizational characteristics. To elucidate Swiss energy stakeholders’ perceptions on key action targets implied by recent energy policies in Switzerland, we analyzed data from our original survey with 364 organizations. We examined their views on concrete policy goals related to electric mobility, deep geothermal energy, wind energy, hydropower, and planned phase-outs of renewable energy subsidies. When asked to rate how realistic these goals appear to them, the majority of the stakeholders responded negatively. Furthermore, our findings indicate that, despite the considerable diversity and the overall pessimism in their feasibility perceptions, those that consider goals to be realistic are more likely to be active in the media. This is a concerning finding as the public might receive a biased impression via the media about the level of consensus among the stakeholders, who could, at times, be seen by the public as experts on the topic.

13 March 2026 in GAIA - Ecological Perspectives for Science and Society
Verified
Journal Article
Closed access
JCJaïr Campfens
Jaïr Campfens
MDMert Duygan
Mert Duygan
CBClaudia, R. Binder
Claudia, R. Binder
A review of 48 studies shows that while co-construction is common in participatory modelling for energy scenarios, participation often remains consultative ‐ highlighting the need to better align methods with intended stakeholder engagement levels.This paper reviews 48 studies that used participatory modelling (PM) techniques for the development of energy scenarios, focusing on the level of participation (informing, consulting, collaborating, empowering) and the timing of participation (front-end, back-end, front-and back-end, co-construction). Findings show that co-construction is the predominant timing of participation, while consulting is the most frequent level of participation. This pattern suggests that longer stakeholder involvement does not necessarily lead to deeper forms of participation. Across studies, the level of participation appears to be shaped more by the technical and epistemic design of models than by the timing of participation or stakeholder availability. Based on these findings, we outline three practical considerations: 1. align the PM approach with the desired level of participation, 2. determine when stakeholder input will be most valuable, 3. clarify roles and support mutual learning.