24 August 2016 in Wind Energy
This study compares the impact of drivetrain configuration on the mass and capital cost of a series of wind turbines ranging from 1.5 MW to 5.0 MW power ratings for both land‐based and offshore applications. The analysis is performed with a new physics‐based drivetrain analysis and sizing tool, Drive Systems Engineering (DriveSE), which is part of the Wind‐Plant Integrated System Design & Engineering Model. DriveSE uses physics‐based relationships to size all major drivetrain components according to given rotor loads simulated based on International Electrotechnical Commission design load cases. The model's sensitivity to input loads that contain a high degree of variability was analyzed. Aeroelastic simulations are used to calculate the rotor forces and moments imposed on the drivetrain for each turbine design. DriveSE is then used to size all of the major drivetrain components for each turbine for both three‐point and four‐point configurations. The simulation results quantify the trade‐offs in mass and component costs for the different configurations. On average, a 16.7% decrease in total nacelle mass can be achieved when using a three‐point drivetrain configuration, resulting in a 3.5% reduction in turbine capital cost. This analysis is driven by extreme loads and does not consider fatigue. Thus, the effects of configuration choices on reliability and serviceability are not captured. However, a first order estimate of the sizing, dimensioning and costing of major drivetrain components are made which can be used in larger system studies which consider trade‐offs between subsystems such as the rotor, drivetrain and tower. Copyright © 2016 John Wiley & Sons, Ltd.
3 June 2025 in International Journal of Pavement Engineering
1 December 2005 in Journal of Infrastructure Systems
This paper describes the functional characteristics of a web-based infrastructure management system (IMS) that includes geotechnical and structural data and analysis tools. The addition of structural and geotechnical data (strength, layer moduli, boring logs, in situ, and nondestructive test data) and analysis tools (capacity analysis, remaining life analysis) significantly improves project-level planning activities, e.g., maintenance and rehabilitation, remaining life analysis, and provides more balanced emphasis on both functional (i.e., safe, smooth ride) and structural factors. The IMS was developed to help the Oklahoma Aeronautics Commission (OAC) oversee state aviation needs and to guide the distribution of state and federal funds to 88 statewide general aviation airports (GAA). In this case and in many infrastructure networks, the central agency does not have ownership of the assets; hence, effective infrastructure management requires a distributed effort. Web enablement of the IMS was critical in placing project-level knowledge in the hands of each GAA’s technical and managerial personnel. Since implementing the IMS, project-level planning activities by the GAAs has increased more than 30% and the integrity of project level designs has improved. The IMS has increased the efficiency of OAC personnel and has helped breed a culture of continuous infrastructure management improvement.
8 May 2023 in Transportation Research Record: Journal of the Transportation Research Board
The Federal Aviation Administration is developing new design procedures for extending airport pavement life beyond 20 years based on the concept of serviceability: the measure of a how well a pavement fulfills user expectations. A key element is a new distress “mega-index” whose elements are intended to represent the independent components of airport pavement serviceability: low foreign object damage potential, low skid potential, and smoothness. This research verifies the assumption that these three components completely describe airport pavement serviceability and proposes an improved probability-based form for the mega-index. The new form has several anticipated advantages including a real-world meaning, the expectation that it can be integrated into a risk management system, and the ability to break down condition into multiple submodels with separate inputs to improve the accuracy of pavement condition predictions.