Xuhui Xu

Xuhui Xu

Auto-generated profile, based on publicly available information

Xuhui Xu

School of Energy and Mining Engineering China University of Mining and Technology (Beijing) Beijing China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2021 in Engineering Failure Analysis
Verified
Journal Article
Closed access
XXXuhui Xu
Xuhui Xu
FHFulian He
Fulian He
XLXiaobin Li
Xiaobin Li
WHWenrui He
Wenrui He

17 February 2023 in Energy Science & Engineering
Verified
Journal Article
Open access
DWDeqiu Wang
Deqiu Wang
FHFulian He
Fulian He
YWYanhao Wu
Yanhao Wu
XXXuhui Xu
Xuhui Xu
JZJianlong Zhang
Jianlong Zhang
JSJiayu Song
Jiayu Song
A reasonable width of the coal pillar is very important to the surrounding rock control of the gob‐side roadway. An unreasonable width of the coal pillar will make the roadway to be located within the range of strong mining influence, leading to severe deformation of the roadway. Severe subsidence at the coal pillar side of the roof and serious coal pillar deformation are problems caused by strong dynamic pressure due to mining in the gob‐side coal roadway. This paper studies the surrounding rock instability mechanism and rational coal pillar width of the gob‐side coal roadway under the influence of intense dynamic pressure. The results show that: (1) Under the condition of large mining height, the roadway overburden is a hinged structure, and an unreasonable coal pillar width makes the gob‐side coal roadway to be located below the main roof fracture line. The rotary movement of the key block of the main roof is the main reason for the roadway deformation. (2) According to the evolution law of stress field, displacement field and plastic zone of surrounding rock of roadway under different coal pillar widths during roadway driving and mining were studied, and it is concluded that a 6‐m‐width coal pillar is the most reasonable. (3) Based on the stress distribution and plasticizing range of surrounding rock in a narrow pillar roadway, the combined support scheme of “anchor cable + grouting + single prop” is proposed and applied to engineering practice. The practice results show that the roadway deformation is well controlled, and the safe mining of the working face is realized.

8 August 2022 in Geomatics, Natural Hazards and Risk
Verified
Journal Article
Open access
WZWenli Zhai
Wenli Zhai
FHFulian He
Fulian He
XXXuhui Xu
Xuhui Xu
KLKai Lv
Kai Lv
LLLiang Li
Liang Li
JSJiayu Song
Jiayu Song
Severe floor heave in underground soft rock roadways heavily affects mine safety and production efficiency. In the present study, the context of the Shanghaimiao mining area is analyzed as the research object. In this regard, the floor heave mechanism and floor control in water-rich soft rock roadways are investigated through laboratory experiments, theoretical analysis, numerical simulation, and field tests. Moreover, a mechanical model of asymmetric floor heave is established. The obtained results reveal that: the main contributors to serious floor deformation in mining roadways are low rock stratum strength, hydrophysical behavior, and mining disturbance. It is found that the roadway floor stability is relevant to the stress concentration coefficient of the roadway side, the burial depth of the roadway, and the cohesion and internal friction angle of the floor rock. Meanwhile, the correlation between the upward resultant stress of the floor and the stress concentration coefficient of the roadway sides is established. Furthermore, the horizontal stress distribution of the roadway floor within 20 m of the advanced working face is simulated and analyzed. Based on the performed analyses and the obtained results, a novel double-seal deep and shallow inverted bottom arch (DS-IBA) floor support strategy is proposed. The proposed strategy is expected to provide a reference for dealing with similar water-rich soft rock roadways.

31 March 2022 in Energy Science & Engineering
Verified
Journal Article
Open access
KLKai Lv
Kai Lv
FHFulian He
Fulian He
LLLiang Li
Liang Li
XXXuhui Xu
Xuhui Xu
BQBinBin Qin
BinBin Qin
Different from single coal seam mining, the stress evolution in the end mining stage of close‐distance coal seams is extremely complex. The unreasonable position and support of the lower retracement channel will cause serious deformation and damage to the surrounding rock. Taking the Yanzishan coal mine as the engineering background, the deformation and failure characteristics of the retracement channel under different overlay environments and the key influencing factors of position design were discussed by numerical simulation, theoretical analysis, and field investigation. The results show that the coupling superposition of upper coal pillar high stress and mining dynamic pressure will form a dangerous area with severe ground pressure behavior. The retracement channel should be preferentially designed in zone A (overlying mining roadways), followed by zone B (overlying end‐mining coal pillar), and finally, zone C (overlying section coal pillar). In addition, the rational horizontal distance between the lower retracement channel and the upper end‐mining coal pillar should make the channel in a good stress environment. The safety distance between the retracement channel and the nearest main roadway (end‐mining coal pillar width) should be greater than the severe range of advance abutment pressure. Finally, the design principle and control strategy for the lower retracement channel is proposed. The feasibility and rationality of the study are verified by industrial applications.

29 May 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
FHFulian He
Fulian He
WZWenli Zhai
Wenli Zhai
JSJiayu Song
Jiayu Song
XXXuhui Xu
Xuhui Xu
DWDeqiu Wang
Deqiu Wang
YWYanhao Wu
Yanhao Wu
During gob-side entry driving under complex conditions in inclined short-distance coal seams, the roadway loses stability and deforms seriously, which affects the safety and efficiency of mine production. In this study, a reasonable coal pillar width was explored by means of on-site investigation, theoretical analysis, numerical simulation, and engineering tests. The following research results were obtained: (1) In selecting a reasonable coal pillar width, the influences of the position of residual coal pillars, stratum spacing, main roof breakage, roadway section in the upper coal seam should be considered. From established mechanical models of inclined gob-side roadways, the maximum floor failure depth is 27 m and the concentrated influence range of the #1 coal pillars is 11 m. (2) The stress states of coal pillars with different widths were analyzed by numerical simulation. As the coal pillar width increases, the peak value of the stress increases first and then decreases. Based on the site geological conditions, the optimum coal pillar width was determined to be 8 m, which is consistent with the theoretical calculation results. (3) A new pressure-yield support technology was proposed, and its on-site application confirmed its notable roadway control effect. Our research can provide theoretical support for the control of roadways surrounding rock under similar engineering background conditions.