26 September 2023 in The European Physical Journal C
A muon collider would enable the big jump ahead in energy reach that is needed for a fruitful exploration of fundamental interactions. The challenges of producing muon collisions at high luminosity and 10 TeV centre of mass energy are being investigated by the recently-formed International Muon Collider Collaboration. This Review summarises the status and the recent advances on muon colliders design, physics and detector studies. The aim is to provide a global perspective of the field and to outline directions for future work.
15 January 2024 in The European Physical Journal C
9 April 2024 in IEEE Transactions on Applied Superconductivity
TGthe Muon Magnets Working Group
the Muon Magnets Working Group
+47
We describe the magnet challenges for a Muon Collider, an exciting option considered for the future of particle physics at the energy frontier. Starting from the comprehensive work performed by the US Muon Accelerator Program, we have reviewed the performance specifications dictated by beam physics and the operating conditions to satisfy the accelerator needs. Among the many magnets that make up a muon collider, we have identified four systems that represent well the envelope of challenges: the target and capture solenoid, the final cooling solenoid, the accelerator dipoles and the collider dipoles. These systems provide focus for the development of novel concepts, largely based on HTS for reasons of performance, cost and sustainability. After giving a consolidated overview of the needs for the magnet systems, we describe here the basic technology options considered, and the plan for design and development activities.
21 December 2017 in IEEE Transactions on Applied Superconductivity
Advances in the performance of low and high temperature superconductors enable the development of advanced magnets for a range of applications, including tokamaks for fusion energy, dipoles and quadrupoles for hadron colliders. The capability of testing prototype cables and insert coils at high field is critical to these developments. We present here the conceptual design of a test facility dipole with features suitable to support the advanced magnet development efforts of both Fusion and HEP communities. A background field of 15 T is provided over a homogeneous length of 1000 mm and the clear bore of 144x94 mm can accommodate large fusion conductors as well as prototype coils for high field dipoles. Two technical solutions are considered. The first uses a forced flow Cable-in-Conduit Conductor and follows the design developed by EFDA for the EDIPO magnet. The second uses a bath cooled Rutherford cable and follows a block-coil design similar to the CERN FRESCA2 dipole, and the LBNL HD and LD1 dipoles. Following a comparison between the two approaches, we present two designs for the Rutherford cable approach including performance objectives, key parameters, and preliminary magnetic, mechanical and quench protection analysis.
1 October 2013 in Fusion Engineering and Design
4 February 2020 in IEEE Transactions on Applied Superconductivity
In 2018, two structures have been proposed with the goal of re-placing the magnet EDIPO that stopped operating in 2016. These two solutions were designed to generate a field of 15 T on an aperture of 100x150 mm2 at 4.2 K by using Nb3Sn super-conducting Rutherford cable. After the boarding review, which took place in December 2018, a solution consisting of 6-double-layers coils was retained, based on the 2-D modelling results. We now extend the study, by considering the 3-D models, with the goal of concluding the magnet conceptual design. The target is to obtain a homogeneous field, with 1% of homogeneity, over a length of 1000 mm, which allows the testing of superconduct-ing cables for both fusion and high-energy physics. The double-layers coils, of the block-type magnet, have flared ends to allow the aperture to cross the magnet length. The 6-coils solution differs from previous similar projects as the FRESCA2 and HD2 magnets, where 4-coils were used