Sylwester Rajwa

Sylwester Rajwa

Auto-generated profile, based on publicly available information

Sylwester Rajwa

Cent Min Inst GIG, 1 Gwarkow Sq, PL-40166 Katowice, Poland

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2022 in Energies
Verified
Journal Article
Open access
PDF file
PNPhu Minh Vuong Nguyen
Phu Minh Vuong Nguyen
AWAleksander Wrana
Aleksander Wrana
SRSylwester Rajwa
Sylwester Rajwa
ZRZenon Różański
Zenon Różański
RFRobert Frączek
Robert Frączek
In Poland, the mining waste from underground coal mines is commonly deposited in surface dump sites, forming slopes or piles of materials dozens of meters high. Because of the loose structure of a mine waste dump slope, landslides may occur after a heavy rainfall. This requires significant labor costs in reforming the mine waste dump sites and disturbs the continuity of the depositing operations. Moreover, if the mine waste dump sites located in the built-up areas, such as in the Janina mine waste dump, landslides apparently can threaten even lives and properties. Therefore, a mine waste dump stability analysis is necessary for ensuring safety. In this paper, slope stability analysis was conducted using numerical modeling under the impact of rainfall for the Janina mine waste dump, located in Libiąż, Poland. The results indicated that slope tends to loose stability in case of high rainfall intensity and short duration. Then, slope reinforcement using soil nailing and steel mesh was proposed to prevent landslide under the impact of high rainfall intensity. Once again, slope stability analysis was carried out with selected reinforcement. Meanwhile, slope monitoring was performed to assess the slope reinforcement implementation at the Janina mine waste dumps against the impact of high rainfall intensity. Based on the modeling and monitoring outcomes, assessments of slope stability and selected landslide prevention measures for the Janina mine waste dump under the impact of rainfall were presented.

28 February 2022 in Energies
Verified
Journal Article
Open access
PDF file
SRSylwester Rajwa
Sylwester Rajwa
TJTomasz Janoszek
Tomasz Janoszek
JŚJanina Świątek
Janina Świątek
AWAndrzej Walentek
Andrzej Walentek
Dominik BałagaDominik Bałaga
Dominik Bałaga
The main goal of the paper is numerical simulation for investigation of damage causes in the working of a longwall located under the unmined longwall panel. The paper presents the results of model-based research on the stability of the roof of a longwall working in a zone subject to cave-in mining, taking into account the influence of mining conditions in the form of an unmined coal seam located 115 m above the exploited seam. It presents the geometry of the rock mass under study, the discretization area of the solution, and gives an overview of the assumptions used to build the numerical model. The authors discuss the results of numerical simulations of the influence of mining phenomena on the formation of roof falls in the longwall. Based on the results of numerical simulations, the process of identifying the size of roof falls in a longwall working (loss of stability) was carried out through their appropriate classification. The case presented and analyzed in this paper occurred in one of Poland’s coal mines.

20 July 2023 in Archives of Mining Sciences
Verified
Journal Article
Closed access
PDF file
SRSylwester Rajwa
Sylwester Rajwa
SBSven Bock
Sven Bock