Felix Nitsch

Felix Nitsch

Auto-generated profile, based on publicly available information

Felix Nitsch

German Aerospace Center (DLR), Institute of Networked Energy Systems, Curiestr. 4, 70563 Stuttgart, Germany

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2023 in Journal of Open Source Software
Verified
Journal Article
Open access
PDF file
CSChristoph Schimeczek
Christoph Schimeczek
KNKristina Nienhaus
Kristina Nienhaus
UFUlrich Frey
Ulrich Frey
ESEvelyn Sperber
Evelyn Sperber
SSSeyedfarzad Sarfarazi
Seyedfarzad Sarfarazi
AGA. Achraf El Ghazi
A. Achraf El Ghazi
AMIRIS is an agent-based model (ABM) to simulate electricity markets. The focus of this bottom-up model is on the business-oriented decisions of actors in the energy system. These actors are represented as prototypical agents in the model, each with own complex decisionmaking strategies. Inter alia, the bidding decisions are based on the assessment of electricity market prices and generation forecasts (Nitsch, Deissenroth-Uhrig, et al., 2021), and diverse actors deciding on different time scales may be modelled. In particular, the agents' behavior does not only reflect marginal prices, but can also consider effects of support instruments like market premia, uncertainties and limited information, or market power (Frey et al., 2020). This allows assessing which policy or market design is best suited to an economic and effective energy system (Torralba-Díaz et al., 2020). The simulations generate results on the dispatch of power plants and flexibility options, technology-specific market values, development of system costs or CO2 emissions. One important output of the model are simulated market prices (Deissenroth et al., 2017).

21 January 2021 in Environmental Research Letters
Verified
Journal Article
Open access
PDF file
OTOlga Turkovska
Olga Turkovska
GCGabriel Castro
Gabriel Castro
MKMichael Klingler
Michael Klingler
FNFelix Nitsch
Felix Nitsch
PRPeter Regner
Peter Regner
JSJohannes Schmidt
Johannes Schmidt
While wind power is a low-carbon renewable energy technology with relatively little land footprint, the necessary infrastructure expansion still has land-related environmental impacts. Brazil has seen more than a ten-fold increase in wind power capacity in the last decade. However, little is known about these impacts of wind power generation in Brazil compared to other world regions, although Brazilian wind power infrastructure is concentrated in the least protected ecosystems that are prone to degradation, desertification and species extinction. This study focuses on land-use impacts of past wind power generation development in four Brazilian federal states, covering 80% of the country’s installed capacity. We assessed their spatial installation patterns, associated land-use and land cover change in the period before installation until 2018, and potential alternative installation locations, using a detailed wind turbine location database in combination with a high-resolution land-use and land cover map. In contrast to wind parks built in Europe, we found that 62% of the studied wind park area was covered by native vegetation and coastal sands. Overall, 3.2% of the total wind cluster area was converted from native vegetation to anthropogenic use. Wind parks installed mainly on native vegetation, on average, underwent higher land-use change compared to other wind parks. As Brazil intends to more than double its current wind power capacities by 2029, we explored possibilities to reduce environmental risks due to wind power expansion. We showed that this is feasible by integrating wind parks into human-altered areas, as sufficient wind resources there are available.

1 April 2019 in Renewable Energy
Verified
Journal Article
Open access
LCLuis Ramirez Camargo
Luis Ramirez Camargo
KGKatharina Gruber
Katharina Gruber
FNFelix Nitsch
Felix Nitsch

1 October 2018 in Applied Energy
Verified
Journal Article
Open access
LCLuis Ramirez Camargo
Luis Ramirez Camargo
FNFelix Nitsch
Felix Nitsch
KGKatharina Gruber
Katharina Gruber
WDWolfgang Dorner
Wolfgang Dorner

17 December 2019 in Energy, Sustainability and Society
Verified
Journal Article
Open access
PDF file
FNFelix Nitsch
Felix Nitsch
OTOlga Turkovska
Olga Turkovska
JSJohannes Schmidt
Johannes Schmidt
Background: The availability of land for the installation of wind power turbines is restricted by numerous factors. Besides climatic conditions, the deployment of wind energy is limited by technical, social, economic, and environmental factors. Typically, assessments of land availability for wind power use legal and technical criteria to estimate the potential for wind power expansion. In contrast, we use observed characteristics of wind power generation sites existing in Austria and Denmark to estimate its potential expansion in Czechia. We combined data on wind turbine locations with data on land use, wind speeds, human impact on land, and nature conservation areas. Results: Our analysis shows that the density of wind power in Austria is variable, but higher on average (4.79 MW km−2) than in Denmark (1.76 MW km−2). Austrian wind turbines have been installed in areas where the human impact on land is mostly higher than the Austrian average, while in Denmark, no difference is observed. Regarding the land use composite, the share of agricultural land on sites with wind turbines is on average much higher (86%), while the share of forest is much lower (7%) in both countries. We identified a maximum potential area in Czechia of 543 km2 with Austrian and 421 km2 with Danish characteristics. When conservatively assuming observed historical power densities, this area translates to 2295 MW and 741 MW of installed wind power capacity, respectively. These results are a magnitude of order lower than the potentials found in existing studies. In a sensitivity analysis, we have examined that the availability of potential sites depends mainly on the population density, the human impact on land, prevailing wind speeds, and the height above sea level. Conclusions: We estimated available land area for potential wind turbine installations in Czechia using our newly developed methodology based on observed site characteristics of today’s wind power infrastructure in Austria and Denmark. Available land area indicated possible overestimation of wind power capacities proposed in the recent studies on the renewable energy transition. Hence, more rigorous consideration of land availability is required for assessments of potential wind power expansion.

2 November 2019 in Energies
Verified
Journal Article
Open access
PDF file
LCLuis Ramirez Camargo
Luis Ramirez Camargo
FNFelix Nitsch
Felix Nitsch
KGKatharina Gruber
Katharina Gruber
JVJavier Valdes
Javier Valdes
JWJane Wuth
Jane Wuth
WDWolfgang Dorner
Wolfgang Dorner
Independence from the power grid can be pursued by achieving total self-sufficient electricity supply. Such an energy supply model might be particularly interesting for settlements located in rural areas where enough space is available for energy generation installations. This article evaluates how and at what cost electricity demand of residential users across Germany and the Czech Republic could be covered by hybrid renewable energy generation systems consisting of photovoltaics, micro-generation wind turbines and batteries. High-resolution reanalysis data are used to calculate necessary system sizes over a large area by simultaneously accounting for the temporal variability of renewable energy. For every potential location in the research area, the hybrid system requirements for clusters of 50 self-sufficient single-family houses are calculated. The results indicate no general trend regarding the size of the respective technologies, although larger areas where PV-wind power complementarity enables lowering the total system costs and required storage capacities were determined. Assuming that the cluster of households could be constituted and depending on the location, the total installation and operation costs for the proposed systems for a lifetime of 20 years range between EUR 1.8 Million and EUR 5 Million without considering costs of financing. Regions with the lowest costs were identified mainly in the south of Germany.