The existence of locally optimal solutions to the AC optimal power flow problem (OPF) has been a question of interest for decades. This paper presents examples of local optima on a variety of test networks including modified versions of common networks. We show that local optima can occur because the feasible region is disconnected and/or because of nonlinearities in the constraints. Standard local optimization techniques are shown to converge to these local optima. The voltage bounds of all the examples in this paper are between ±5% and ±10% off-nominal. The examples with local optima are available in an online archive (http://www.maths.ed.ac.uk/optenergy/LocalOpt/) and can be used to test local or global optimization techniques for OPF. Finally we use our test examples to illustrate the behavior of a recent semi-definite programming approach that aims to find the global solution of OPF.
18 December 2013 in IEEE Transactions on Power Systems
In this paper, a flexible optimization-based framework for intentional islanding is presented. The decision is made of which transmission lines to switch in order to split the network while minimizing disruption, the amount of load shed, or grouping coherent generators. The approach uses a piecewise linear model of AC power flow, which allows the voltage and reactive power to be considered directly when designing the islands. Demonstrations on standard test networks show that solution of the problem provides islands that are balanced in real and reactive power, satisfy AC power flow laws, and have a healthy voltage profile.
4 December 2015 in IEEE Transactions on Smart Grid
Renewable energy sources such as wind and solar have received much attention in recent years, and large amounts of renewable generation are being integrated into electricity networks. A fundamental challenge in power system operation is to handle the intermittent nature of renewable generation. In this paper, we present a stochastic programming approach to solve a multiperiod optimal power flow problem under renewable generation uncertainty. The proposed approach consists of two stages. In the first stage, operating points of the conventional power plants are determined. The second stage realizes generation from the renewable resources and optimally accommodates it by relying on the demand-side flexibilities. The proposed model is illustrated on a 4-bus and a 39-bus system. Numerical results show that substantial benefits in terms of redispatch costs can be achieved with the help of demand side flexibilities. The proposed approach is tested on the standard IEEE test networks of up to 300 buses and for a wide variety of scenarios for renewable generation.
1 February 2013 in International Journal of Electrical Power & Energy Systems
The proliferation of distributed generation and the electrification of heat and transport pose significant challenges to distribution system operators (DSOs) and transmission system operators (TSOs). These challenges include the choice between network upgrades or operating increasingly constrained networks, with a reliance on the flexibility of distributed energy resources (DERs). This study presents a novel market‐based coordination scheme, which allows both the DSO and TSO to access DER flexibility, while respecting distribution system limits. The DSO's objective in this work is to minimise the cost incurred by DSO adjustments to DERs, required to ensure stable distribution network operation. The methodology presented has the advantages of being compatible with existing TSO balancing market operation, and scalable enough to include multiple DSO markets coordinating with the TSO. The approach is demonstrated on a section of Great Britain distribution network, using high DER growth scenario data for the year 2030. The case studies demonstrate the proposed DSO market mechanism to maintain thermal and voltage limits during periods of peak demand and DER output. The DSO is given priority in using DERs to solve distribution network constraints, however, significant flexibility remains for the TSO even during periods of peak demand and maximum export.