Zilin Pan

Zilin Pan

Auto-generated profile, based on publicly available information

Zilin Pan

Water Resources Engineering Construction Centre of Ningxia, China

Research Focus & Metrics

Representative Publications

View All Publications
17 May 2024
Verified
Conference Paper
Open access
ZPZilin Pan
Zilin Pan
WHWenhao Han
Wenhao Han
ZWZhihang Wang
Zhihang Wang
骏曹骏 曹
骏 曹
ZLZhenan Lin
Zhenan Lin
Powerful ramming is one of the leading technical measures to improve a wet foundation's bearing capacity, increase the foundation's compactness and reduce uneven settlement. Scientific and accurate simulation of the response process of foundation soil to robust ramming construction is essential to improve wet-submerged foundations' compactness and bearing capacity. To investigate the stress and displacement changes of the wet sinking loess foundation under powerful ramming, the plant foundation of the total dry seven pumping stations of the Ningxia Guhai irrigation expansion project was taken as the study area. Numerical simulation of ramming solid response based on on-site investigation and actual measurement data, applying the method of finite element analysis to the wet sink loess foundation in the plant area. The stress and displacement changes of the soil during ramming are analyzed and compared with the actual measurement data of the project. The results show that the longitudinal stress wave generated by strong ramming showed a trend of increasing and then decreasing with the contact time and reached the model boundary after 0.16s. The vertical displacement of the soil body at the early stage of solid ramming shows a decreasing trend with the increase of soil depth; the maximum settlement is 0.45m, and when the depth of the soil body reaches 6m, the decreasing trend of displacement at the response position becomes slower. When the number of ramming at the exact location reaches six times, the ramming settlement begins to fall below 0.1m, and the total ramming compensation gets 1.227 m. The actual ramming solid test shows that the ultimate ramming settlement of the foundation in the area is about 1.2∼1.3m, and the simulation results are consistent with the field observation. The numerical simulation method adopted in this study can provide a theoretical approach for the control of ramming solid construction of wet sinking loess foundation, and the simulation results can provide some academic reference for the formulation of a wet sinking loess foundation treatment plan.