Zhenan Lin

Mr. Zhenan Lin

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 September 2025 in Buildings
Verified
Journal Article
Open access
PDF file
LDLianying Ding
Lianying Ding
ZLZhenan Lin
Zhenan Lin
CXCundong Xu
Cundong Xu
XXXuHui Xu
XuHui Xu
博李博飞 李
博飞 李
JSJiaxing Shen
Jiaxing Shen
Hybrid fiber-reinforced concrete (HFRC), renowned for its significantly enhanced mechanical properties and structural integrity, is widely used in infrastructure construction and has become a key avenue of modern high-performance concrete development. The hybrid application of basalt fiber (BF) and polypropylene fiber (PPF) at optimized ratios generates synergistic effects, improving both mechanical performance and material service reliability. To explore and evaluate the synergistic mechanism of BF-PPF hybrid fibers on concrete’s mechanical properties and performance, this study employs an orthogonal experimental design and mechanical testing methods, measuring the materials’ static compressive strength (loading rate: 0.6 mm/min), splitting tensile strength (loading rate: 0.12–0.14 MPa/s), dynamic elastic modulus (measured by the ultrasonic method), and dynamic compressive strength (loading rates: 0.6 mm/min, 6 mm/min, and 60 mm/min). For these tests, we prepared 100 mm × 100 mm × 100 mm cubic specimens (for static compressive, dynamic compressive, and splitting tensile tests) and 400 mm × 100 mm × 100 mm prismatic specimens (for dynamic elastic modulus tests), with three parallel specimens in each test group. In addition, the microstructure was characterized by scanning electron microscopy (SEM) to observe the fiber-matrix interaction. The results show that when the BF/PPF volume ratio is 1:2 (BF0.05PPF0.1), the concrete’s compressive strength, splitting tensile strength, and elastic modulus increase by 13.7%, 76.3%, and 116.0%, respectively, with corresponding synergistic effect indices (Q) of 0.057, 0.213, and 0.241, indicating obvious positive synergy. Under dynamic loading, hybrid combinations with higher PPF content (e.g., BF0.05PPF0.1) exhibit strain-rate-dependent enhancements in compressive strength and better impact resistance. SEM analysis reveals that fibers inhibit microcrack propagation through fiber bridging, network distribution, and pull-out resistance, while also improving the interfacial transition zone’s structure. These findings provide theoretical support for the engineering application of composite fiber-reinforced concrete materials.

17 May 2024
Verified
Conference Paper
Open access
ZPZilin Pan
Zilin Pan
WHWenhao Han
Wenhao Han
ZWZhihang Wang
Zhihang Wang
骏曹骏 曹
骏 曹
ZLZhenan Lin
Zhenan Lin
Powerful ramming is one of the leading technical measures to improve a wet foundation's bearing capacity, increase the foundation's compactness and reduce uneven settlement. Scientific and accurate simulation of the response process of foundation soil to robust ramming construction is essential to improve wet-submerged foundations' compactness and bearing capacity. To investigate the stress and displacement changes of the wet sinking loess foundation under powerful ramming, the plant foundation of the total dry seven pumping stations of the Ningxia Guhai irrigation expansion project was taken as the study area. Numerical simulation of ramming solid response based on on-site investigation and actual measurement data, applying the method of finite element analysis to the wet sink loess foundation in the plant area. The stress and displacement changes of the soil during ramming are analyzed and compared with the actual measurement data of the project. The results show that the longitudinal stress wave generated by strong ramming showed a trend of increasing and then decreasing with the contact time and reached the model boundary after 0.16s. The vertical displacement of the soil body at the early stage of solid ramming shows a decreasing trend with the increase of soil depth; the maximum settlement is 0.45m, and when the depth of the soil body reaches 6m, the decreasing trend of displacement at the response position becomes slower. When the number of ramming at the exact location reaches six times, the ramming settlement begins to fall below 0.1m, and the total ramming compensation gets 1.227 m. The actual ramming solid test shows that the ultimate ramming settlement of the foundation in the area is about 1.2∼1.3m, and the simulation results are consistent with the field observation. The numerical simulation method adopted in this study can provide a theoretical approach for the control of ramming solid construction of wet sinking loess foundation, and the simulation results can provide some academic reference for the formulation of a wet sinking loess foundation treatment plan.

17 May 2024
Verified
Conference Paper
Open access
CXCundong Xu
Cundong Xu
YZYahui Zi
Yahui Zi
XXXu Xu
Xu Xu
ZRZihao Ren
Zihao Ren
XHXiaomeng Hu
Xiaomeng Hu
ZLZhenan Lin
Zhenan Lin
The terrain in the southern plains of China is low and gentle, and the river network structure is complex. In order to quickly solve the problem of unclear impact of hydrodynamic regulation on the river network and facies in this area, this study takes the “Lougang Polder” river network in Yaozhuang Town, Jiashan County, Jiaxing City as the research object, constructs a Mike21 two-dimensional river network hydrodynamic model, and combines the existing water conservancy gate and pump facilities and scheduling rules in the research area to propose four control schemes for positioning and boosting at the global scale, And the project operation time was set to 30 days and 15 days, and the characteristics and changes of river network and river facies under different schemes were simulated and analyzed, exploring the impact of engineering regulation on river network and river facies in the polder area. The simulation results show that under the four designed control schemes, the flow velocity can be significantly improved after 15 and 30 days of engineering operation, and the overall flow velocity of the river network outer circle is higher than that of the inner part of the polder area. When the gates on the three sides of the east, west, and south are opened and the gates on the north are closed, the river network within the polder area is relatively orderly and there is no back flow phenomenon. At the same time, the overall flow velocity of the river network is improved effectively, effectively enhancing the hydrodynamic force of the plain river network and achieving a balance between the river network and the development of the basin. Comprehensive analysis shows that when the gates on the three sides of the east, west, and south are opened and the gates on the north are closed, the water flow improvement effect is the best after 15 days of project operation, and the river network reaches a stable state, providing strong technical support for the joint commissioning and control of the river gate and pump in the later stage. The research results are of great significance for promoting the sustainable and healthy development of the southern plain river network.