10 May 2017 in IEEE Transactions on Smart Grid
The integration of renewable energy source (RES) and energy storage systems (ESS) in microgrids has provided potential benefit to end users and system operators. However, intermittent issues of RES and high cost of ESS need to be placed under scrutiny for economic operation of microgrids. This paper presents a two-layer predictive energy management system (EMS) for microgrids with hybrid ESS consisting of batteries and supercapacitors. Incorporating degradation costs of the hybrid ESS with respect to the depth of charge and lifetime, long-term costs of batteries and supercapacitors are modeled and transformed to short-term costs related to real-time operation. In order to maintain high system robustness at minimum operational cost, a hierarchical dispatch model is proposed to determine the scheduling of utilities in microgrids within a finite time horizon, in which the upper layer EMS minimizes the total operational cost and the lower layer EMS eliminates fluctuations induced by forecast errors. Simulation studies demonstrate that different types of energy storages can be utilized at two control layers for multiple decision-making objectives. Scenarios incorporating different pricing schemes, prediction horizon lengths, and forecast accuracies also verify the effectiveness of the proposed EMS structure.
25 November 2019 in IEEE Transactions on Power Delivery
The penetration level of photovoltaic (PV) keeps increasing in modern distribution networks, which leads to various severe voltage limits violation problems. This article aims to aggregate and utilize the PV inverters for voltage regulation by a fully distributed two-level Volt/VAr control (VVC) scheme. In the lower-level VVC (real-time scale), the rooftop PV inverters are aggregated via consensus algorithms and then governed by droop controllers in medium-voltage networks. The droop controller adjusts the reactive power output of each PV aggregator in real-time from its dispatched value depending on the bus voltage variations. In the upper-level VVC (15-min timescale), the reactive power of PV aggregators is dispatched for power loss minimization, where control signals are set as base values for PV aggregators. This problem is formulated as second-order cone programming and solved by the alternating direction method of multipliers. The simulation results demonstrate the effectiveness of the proposed method in both short-term and long-term scenarios with different system scales.