Eduardo Ayesa

Eduardo Ayesa

Auto-generated profile, based on publicly available information

Eduardo Ayesa

CEIT and Tecnun (University of Navarra), Manuel de Lardizábal 15, 20018 San Sebastián, Spain

Research Focus & Metrics

Academic Career Length

36Years (1991-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2008 in Environmental Modelling & Software
Verified
Journal Article
Closed access
ARAlejandro Rivas
Alejandro Rivas
III Irizar
I Irizar
EAE Ayesa
E Ayesa

1 July 2017 in Water Research
Verified
Journal Article
Open access
Tamara Fernández ArévaloTamara Fernández Arévalo
Tamara Fernández Arévalo
ILI. Lizarralde
I. Lizarralde
FFF. Fdz-Polanco
F. Fdz-Polanco
SPS.I. Pérez-Elvira
S.I. Pérez-Elvira
JGJ.M. Garrido
J.M. Garrido
EAE. Ayesa
E. Ayesa
The growing development of technologies and processes for resource treatment and recovery is offering endless possibilities for creating new plant-wide configurations or modifying existing ones. However, the configurations' complexity, the interrelation between technologies and the influent characteristics turn decision-making into a complex or unobvious process. In this frame, the Plant-Wide Modelling (PWM) library presented in this paper allows a thorough, comprehensive and refined analysis of different plant configurations that are basic aspects in decision-making from an energy and resource recovery perspective. In order to demonstrate the potential of the library and the need to run simulation analyses, this paper carries out a comparative analysis of WWTPs, from a techno-economic point of view. The selected layouts were (1) a conventional WWTP based on a modified version of the Benchmark Simulation Model No. 2, (2) an upgraded or retrofitted WWTP, and (3) a new Wastewater Resource Recovery Facilities (WRRF) concept denominated as C/N/P decoupling WWTP. The study was based on a preliminary analysis of the organic matter and nutrient energy use and recovery options, a comprehensive mass and energy flux distribution analysis in each configuration in order to compare and identify areas for improvement, and a cost analysis of each plant for different influent COD/TN/TP ratios. Analysing the plants from a standpoint of resources and energy utilization, a low utilization of the energy content of the components could be observed in all configurations. In the conventional plant, the COD used to produce biogas was around 29%, the upgraded plant was around 36%, and 34% in the C/N/P decoupling WWTP. With regard to the self-sufficiency of plants, achieving self-sufficiency was not possible in the conventional plant, in the upgraded plant it depended on the influent C/N ratio, and in the C/N/P decoupling WWTP layout self-sufficiency was feasible for almost all influents, especially at high COD concentrations. The plant layouts proposed in this paper are just a sample of the possibilities offered by current technologies. Even so, the library presented here is generic and can be used to construct any other plant layout, provided that a model is available.


1 November 2007 in Water Research
Verified
Journal Article
Closed access
PGP. Grau
P. Grau
MGM. de Gracia
M. de Gracia
Peter VanrolleghemPeter Vanrolleghem
Peter Vanrolleghem
EAE. Ayesa
E. Ayesa

1 February 2006 in Water Science & Technology
Verified
Journal Article
Closed access
PDF file
EAE. Ayesa
E. Ayesa
ASA. De la Sota
A. De la Sota
PGP. Grau
P. Grau
JSJ.M. Sagarna
J.M. Sagarna
ASA. Salterain
A. Salterain
JSJ. Suescun
J. Suescun
This paper presents the theoretical basis and the main results obtained during the development and full-scale experimental validation of the new supervisory control strategy designed for the Galindo-Bilbao wastewater treatment plant (WWTP). The different phases of the project have been carried out over the last 8 years, combining model simulations, pilot-plant experimentation and full-scale validation. The final control strategy combines three complementary control loops to optimise the nitrogen removal in pre-denitrifying activated sludge plants. The first controller was designed to maintain the average concentration of the ammonia in the effluent via the automatic selection of the most appropriate DO set point in the aerobic reactors. The second control loop optimises the use of the denitrification potential and finally, the third control loop maintains the selected amount of biomass in the biological reactors by automatic manipulation of the wastage rate. Mobile-averaged windows have been implemented to incorporate commonly used averaged values in the control objectives. The performance of the controllers has been successfully assessed through the full-scale experimental validation in one of the lines of the WWTP.

1 July 2005 in Water Science & Technology
Verified
Journal Article
Closed access
PDF file
Peter VanrolleghemPeter Vanrolleghem
Peter Vanrolleghem
CRC. Rosen
C. Rosen
UZU. Zaher
U. Zaher
JCJ. Copp
J. Copp
LBL. Benedetti
L. Benedetti
UJUlf Jeppsson
Ulf Jeppsson
In this paper the Petersen and composition matrices that modellers are now familiar with are used as a basis to construct interfacing models between subsystems considered in wastewater treatment. Starting from continuity considerations and a set of transformation reactions between components used in the two models of the subsystems to be interfaced, a set of linear algebraic equations needs to be solved. The theoretical development is illustrated using a simplified integrated model of an activated sludge system coupled to an anaerobic digester. Continuity-guaranteed interfacing of subsystems will facilitate optimization studies of the within-the-fence process units of a wastewater treatment plant or of the integrated urban wastewater system.