M.J. Ginsberg

M.J. Ginsberg

Auto-generated profile, based on publicly available information

M.J. Ginsberg

Tokamak Energy

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 July 2026 in Nuclear Fusion
Verified
Journal Article
Open access
JWJ. Willis
J. Willis
SMS.A.M. McNamara
S.A.M. McNamara
EME.N.J. Maartensson
E.N.J. Maartensson
JAJ. Astbury
J. Astbury
EYE. Yildirim
E. Yildirim
MGM. Ginsberg
M. Ginsberg
Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $ 12–14k/kW of net electric power, and high availability (targeting > 80 % ). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

10 July 2026 in Nuclear Fusion
Verified
Journal Article
Open access
CWC.L. Wilson
C.L. Wilson
JAJ. Astbury
J. Astbury
MGM.J. Ginsberg
M.J. Ginsberg
NHN. Hinton
N. Hinton
EME.N.J. Maartensson
E.N.J. Maartensson
EYE. Yildirim
E. Yildirim
To support the pre-concept design of Tokamak Energy’s (TEs) ST-E1 fusion power plant, we developed a new systems code, PyTok. PyTok codifies plasma physics and engineering constraints within a pure Python, object-oriented framework designed for rapid design iteration and exploration of the power-plant parameter space. The code base and its human- and machine-readable data structures enable coupling to external physics codes and data-analysis tools. Informed by TEs design philosophy and techno-economic analyses, the code was used to identify an initial reference design point for ST-E1. A commercially competitive fusion power plant is achievable with a tokamak power core of major radius 5.0 m, aspect ratio 1.9 ⩽ A ⩽ 2.3 and toroidal field 3.25 ⩽ B T ⩽ 5.25 T. The selected design point serves both as a pilot plant and as a commercially competitive reactor using the same permanent power core hardware, enabled by an in-vessel component upgrade phase. The commercial phase targets steady-state operation and a normalised capital expenditure of $12 000–15 000 per kW e , corresponding to a fusion power of 2.0–2.5 GW and a net electric power of 800–1000 MW.