Emre Yildirim

Emre Yildirim

Auto-generated profile, based on publicly available information

Emre Yildirim

Tokamak Energy Ltd

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 July 2026 in Nuclear Fusion
Verified
Journal Article
Open access
JWJ. Willis
J. Willis
SMS.A.M. McNamara
S.A.M. McNamara
EME.N.J. Maartensson
E.N.J. Maartensson
JAJ. Astbury
J. Astbury
EYE. Yildirim
E. Yildirim
MGM. Ginsberg
M. Ginsberg
Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $ 12–14k/kW of net electric power, and high availability (targeting > 80 % ). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

10 July 2026 in Nuclear Fusion
Verified
Journal Article
Open access
CWC.L. Wilson
C.L. Wilson
JAJ. Astbury
J. Astbury
MGM.J. Ginsberg
M.J. Ginsberg
NHN. Hinton
N. Hinton
EME.N.J. Maartensson
E.N.J. Maartensson
EYE. Yildirim
E. Yildirim
To support the pre-concept design of Tokamak Energy’s (TEs) ST-E1 fusion power plant, we developed a new systems code, PyTok. PyTok codifies plasma physics and engineering constraints within a pure Python, object-oriented framework designed for rapid design iteration and exploration of the power-plant parameter space. The code base and its human- and machine-readable data structures enable coupling to external physics codes and data-analysis tools. Informed by TEs design philosophy and techno-economic analyses, the code was used to identify an initial reference design point for ST-E1. A commercially competitive fusion power plant is achievable with a tokamak power core of major radius 5.0 m, aspect ratio 1.9 ⩽ A ⩽ 2.3 and toroidal field 3.25 ⩽ B T ⩽ 5.25 T. The selected design point serves both as a pilot plant and as a commercially competitive reactor using the same permanent power core hardware, enabled by an in-vessel component upgrade phase. The commercial phase targets steady-state operation and a normalised capital expenditure of $12 000–15 000 per kW e , corresponding to a fusion power of 2.0–2.5 GW and a net electric power of 800–1000 MW.

10 July 2026 in Nuclear Fusion
Verified
Journal Article
Open access
PDF file
EYE. Yildirim
E. Yildirim
JNJ. Naish
J. Naish
JTJ. Trueba
J. Trueba
SLS. Levine
S. Levine
AKA. Kumar
A. Kumar
NAN. Adhikari
N. Adhikari
An integrated tritium fuel-cycle architecture has been developed for ST-E1, a low-aspect-ratio, high-power fusion power plant. The approach couples a helium-cooled liquid-lithium breeder blanket with a dedicated circulation loop providing tritium extraction, heat removal, and inventory control within a unified system boundary. Downstream of the blanket, the tritium processing system comprises of extraction, purification, isotope separation, and storage subsystems sized to accommodate the plant’s dynamic tritium production and consumption rates. Inventory modelling is used to assess candidate extraction schemes, evaluate tritium residence and holdup, and quantify sensitivities associated with protium control and intermediate inventories. The integrated assessment indicates that the combined blanket-processing architecture can satisfy startup and steady-state tritium requirements within credible operating margins, with a low overall inventory and acceptable doubling time. The results identify tritium extraction sensitivity and fuelling efficiency as the dominant drivers of inventory performance, rather than marginal improvements in breeding ratio. Overall, the analysis demonstrates the feasibility of a self-consistent fuel cycle for ST-E1 and highlights the critical dependencies between blanket inventory management, processing throughput, and overall plant performance.

10 July 2026 in Nuclear Fusion
Verified
Journal Article
Open access
PDF file
MMMohamed Khalid Elsharif Mohamed
Mohamed Khalid Elsharif Mohamed
ABAlasdair Burchill
Alasdair Burchill
LMLiviu Maatescu
Liviu Maatescu
EYEmre Yildirim
Emre Yildirim
JNJonathan Naish
Jonathan Naish
AKAbhishek Kumar
Abhishek Kumar
A comprehensive analysis of the thermal management and net-power performance is presented for the ST-E1 low aspect ratio tokamak fusion power plant. The study addresses the critical interplay between coolant system design, power cycle integration, and electrical loads, which significantly influence net-power projections and overall plant viability. Specifically, it quantifies the impact of coolant loop design, pressure drops, pumping power, and thermal storage on plant efficiency, and examines the conditions required to achieve the pilot-phase net power target of 300–500 MWe. The findings provide insight into the system-level trade-offs that govern fusion plant viability and inform pathways toward improved net-power performance.

1 October 2024 in Fusion Engineering and Design
Verified
Journal Article
Open access
EYE. Yildirim
E. Yildirim
Enrique Jimenez-MeleroEnrique Jimenez-Melero
Enrique Jimenez-Melero
BDB. Dacus
B. Dacus
CDC. Dennett
C. Dennett
KWK.B. Woller
K.B. Woller
PMP.M. Mummery
P.M. Mummery

16 November 2023 in Fusion Engineering and Design
Verified
Journal Article
Open access
EYE. Yildirim
E. Yildirim
PMP.M. Mummery
P.M. Mummery
TMT.W. Morgan
T.W. Morgan
Enrique Jimenez-MeleroEnrique Jimenez-Melero
Enrique Jimenez-Melero