Teresa Netti

Teresa Netti

Auto-generated profile, based on publicly available information

Teresa Netti

Department of Civil and Environmental Engineering, Politecnico di Milano, Milano, Italy

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2021 in Engineering Structures
Verified
Journal Article
Open access
CDCoronelli Dario
Coronelli Dario
MTMarco Lamperti Tornaghi
Marco Lamperti Tornaghi
LMLuca Martinelli
Luca Martinelli
FMFrancisco-Javier Molina
Francisco-Javier Molina
AMAurelio Muttoni
Aurelio Muttoni
TNTeresa Netti
Teresa Netti

22 August 2022 in Journal of Earthquake Engineering
Verified
Journal Article
Open access
MRMarcos Ramos
Marcos Ramos
BIBrisid Isufi
Brisid Isufi
RMRui Marreiros
Rui Marreiros
CDCoronelli Dario
Coronelli Dario
TNTeresa Netti
Teresa Netti
AMAurelio Muttoni
Aurelio Muttoni
Strengthening of flat slab-column connections to resist imposed lateral drifts is often required for older reinforced concrete structures in which the flat slabs were typically designed to resist gravity load only or have been designed for less stringent requirements. The complex stress state around the columns means that strong experimental evidence is required for the repair and strengthening techniques to be adopted with confidence in practice. Although a significant amount of research has been devoted to strengthening of slab-column connections, a series of limitations still remain. A thorough literature review revealed that only relatively thin and isolated specimens have been tested under seismic-type loading and realistic strengthening scenarios. To overcome these limitations, a full-scale two-story flat slab building specimen was tested at the European Commission’s Joint Research Centre – ELSA Laboratory in Ispra, Italy. This paper describes and analyzes the results obtained from the last of a series of phases, on repaired and strengthened internal and external slab-column connections using post-installed bolts. Compared with previous tests, the full-scale building specimen has a thicker slab (200 mm), realistic slab continuity conditions and the connections were strengthened after they suffered damage from gravity loading and previous lateral loading phases. The results show that post-installed bolts are efficient even under the described conditions (i.e. damaged and repaired specimens with realistic thickness), and punching shear failure was prevented in the strengthened connections.