1 June 2018 in Journal of Safety Research
1 June 2020 in Journal of Construction Engineering and Management
The success of construction projects is largely influenced by the significant costs incurred by workplace deviant behavior (WDB). It is useful to better understand how WDB occurs among workers for its preventive management. By invoking social exchange theory, this paper clarifies how WDB among construction workers can be predicted by leader–member exchange (LMX) and leader–member guanxi (LMG). Data were gathered from 153 workers and 17 supervisors in 17 construction projects. The results show that LMX and LMG are negatively related to WDB. LMG moderates the relationship between LMX and WDB: The negative relationship between LMX and WDB is stronger when LMG has higher quality. The findings contribute to research on WDB, especially from the aspect of leader–member relationship in the construction industry, and shed light on the theory of social exchange by capturing the role of its nonwork part, LMG, in predicting WDB. Managers of construction projects can benefit from the novel explanation offered here of the occurrence of WDB among workers and suggestions on controlling it in advance.
6 February 2017 in Journal of Engineering, Design and Technology
Purpose: Previous research has little specific guidance on how to improve large infrastructures’ risk analysis. This paper aims to propose a practical risk analysis framework across the project lifecycle with Bayesian Networks (BNs).Design/methodology/approach: The framework includes three phases. In the qualitative phase, primary risks were identified by literature reviews and interviews; questionnaires were used to determine key risks at each project stage and causal relationships between stage-related risks. In the quantitation, brainstorming and questionnaires, and techniques of ranked nodes/paths, risk map and Bayesian truth serum were adopted. Then, a BN-based risk assessment model was developed, and risk analysis was conducted with AgenaRisk software.Findings: Twenty key risks across the lifecycle were determined: some risks were recurring and different risks emerged at various stages with the construction and feasibility most risky. Results showed that previous stages’ risks significantly amplified subsequent stages’ risks. Based on the causality of stage-related risks, a qualitative model was easily constructed. Ranked nodes/paths facilitated the quantification by requiring less statistical knowledge and fewer parameters than traditional BNs. As articulated by a case, this model yielded very simple and easy-to-understand representations of risks and risk propagation pathways.Originality/value: Rare research has developed a BN risk assessment model from the perspective of project stages. A structured model, a propagation network among individual risks, stage-related risks, and the final adverse consequence, has been designed. This research provides practitioners with a realistic risk assessment approach and further understanding of dynamic and stage-related risks throughout large infrastructures’ lifecycle. The framework can be modified and used in other real-world risk analysis where risks are complex and develop in stages.
1 December 2023 in Journal of Infrastructure Systems