A specific pavement maintenance treatment can deal with many pavement distresses, while a specific pavement condition can be improved by many different pavement maintenance treatments. This makes it difficult to develop a generalized method for treatment selection. In this paper, the problem is approached as a multi-objective optimization problem and the Ideal Point Method (IPM), mathematics technique is applied to address these concerns. The indicators, including a performance jump of present serviceability index, treatment service life, and equivalent annual cost are used in the multi-objective optimization model to determine the adequate treatment. A case study focusing on the optimization of three pavement preventative treatments is presented. A benefit-cost ratio model is presented for comparison. A comparison between the two methods suggests that the ideal point method is more objective. The proposed model provides a new way to optimize the selection of pavement maintenance treatments and can lead to profound implications for maintenance and rehabilitation decision-making.
Highway embankment nonuniform deformation related to temperature field and moisture field has caused serious distresses. In seasonally frozen ground region, due to the southern and northern slopes of embankment, the nonuniform deformation often occurs. This paper chooses Jixi region in Heilongjiang Province, China as a seasonally frozen ground region for analysis. By the finite element method, the process of freeze-thaw phase transition of the embankment with mixed boundary conditions of the 2nd and 3rd types is considered. The variations of temperature field and the temperature differences between southern and northern slopes in seasonally frozen ground region are also analyzed. Based on the temperature field and the position and shape of freezing front, freezing coefficient and thawing coefficient are introduced and the embankment deformation caused by the temperature differences is presented. The results may provide scientific basis for road construction and maintenance in seasonally frozen ground region.
In the process of application, under the repeated actions of outside forces and influence of environmental factors, such as traffic loading, cement concrete pavement damage will inevitably occur. Using traditional materials for repair not only waste time but it's also expensive. When considering the problem of repairing cement concrete pavements, repairs need to be rapid and inexpensive. This article discusses the use of industrial waste (slag) for matrix materials, discussing the pozzolanic reaction, particle filling reaction, and interfacial bond effect. The use of slag improved cement hydration products, the microcosmic structure, made use of cement clinker, and encouraged the formation of sodium silicate-bonded alkalis. The developed slag matrix provided excellent performance for cement concrete pavements as a repair material having the capacity of rapid hardening and high strength. The concrete cement material was optimized consisting of cement concrete pavement repair material through an analysis of orthogonal experiment to setting time and strength. Afterwards, cement concrete was contrasted with P.O42.5 performance to prove this repair material has the value of universal use.